I want to search for...
Permit #2021120608
Permit Details
Status: FINAL
| Parcel Id: 06-12-31-0650-000B0-0011 |
| Block: 000B0 |
| Subdivision: - |
| Job Phone: 386-547-6093 |
| Location Address: 101 HAVEN BLVD |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 12/14/2021 |
| NOC: Unknown |
| Applicant name: JOSEPH D WEBER |
| Owner: TEG THE HAVEN AT PALM COAST LLC |
|
Address SUITE 110 AIRMONT, NY 10952 |
|
Address 365 ROUTE 59 AIRMONT, NY 10952 |
| Lot: 0011 |
| Job Description: SITE WORK: THE HAVEN STAGE 1 - MULTI-FAMILY, 2 UNIT TH AND SFR UNITS |
| Type: CN |
Contractor
JD WEBER CONSTRUCTION CO.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
150 BUSINESS CENTER DRIVE ORMOND BEACH, FL 32174 |
CUC1224075 (Exp: 08/31/2026) | (386)671-2727 | (386)671-2471 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 03/03/2025 | APPROVED | FWILLIS |
| Note: 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25 - TRUNCATED DOMES MISSING 2/12/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD- ADA PARKING | 03/03/2025 | APPROVED | FWILLIS |
| Note: 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25 - HANDICAP SIGNS MISSING. 2/12/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD - ADA COMPLIANT | 03/03/2025 | APPROVED | FWILLIS |
| Note: 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25 - HANDICAP SIGNS MISSING, TRUNCATED DOMES MISSING. | |||
| BLD- ADA SIGNAGECONTROL | 03/03/2025 | APPROVED | FWILLIS |
| Note: 2/27/2025 - PREVIOUS INSPECTION NOTES HANDICAP SIGNAGE MISSING. | |||
| BLD- ADA VEHICULAR WAY | 03/03/2025 | APPROVED | FWILLIS |
| Note: 2/27/2025 - PREVIOUS INSPECTION NOTES 2/12/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD - ADA SIGNAGE- INFOR/DIRECT | 03/03/2025 | APPROVED | FWILLIS |
| Note: 2/27/2025 - PREVIOUS INSPECTION NOTES HANDICAP SIGNAGE MISSING | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 03/03/2025 | PARTIALLY APPROVED | MKRASKI |
| Note: 3/3/25 1st phase approved (site lighting) 2/27/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/27/2025 1:30:47 PM *** 1st phase 2/25/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/25/2025 4:26:09 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, CAN NOT VERIFY DEPTH OF CONDUITS WORK IS DONE 2/12/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/12/2025 2:10:38 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, ALSO NEED APPROVED STAMPED SET OF PLANS ON SITE FOR INSPECTION FBC 107.3.1 | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 03/03/2025 | APPROVED | JMUNSON |
| Note: 1st Phase only per Patrick 3/3/2025 - PREVIOUS INSPECTION NOTES 3/3/25 1st phase approved (site lighting) 2/27/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/27/2025 1:30:47 PM *** 1st phase 2/25/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/25/2025 4:26:09 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, CAN NOT VERIFY DEPTH OF CONDUITS WORK IS DONE 2/12/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/12/2025 2:10:38 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, ALSO NEED APPROVED STAMPED SET OF PLANS ON SITE FOR INSPECTION FBC 107.3.1 | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 02/27/2025 | APPROVED | RMARTIN |
| Note: 2/25/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/25/2025 4:25:45 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, CAN NOT VERIFY DEPTH OF CONDUITS WORK IS DONE 2/12/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/12/2025 2:09:12 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, CAN NOT VERIFY DEPTH OF CONDUITS WORK IS DONE, ALSO NEED APPROVED STAMPED SET OF PLANS ON SITE FOR INSPECTION FBC 107.3.1 | |||
| BLD - ADA SIGNAGE- INFOR/DIRECT | 02/27/2025 | Disapproved - NO FEE | FWILLIS |
| Note: HANDICAP SIGNAGE MISSING | |||
| BLD - ADA COMPLIANT | 02/27/2025 | Disapproved - NO FEE | FWILLIS |
| Note: 2/27/25 - HANDICAP SIGNS MISSING, TRUNCATED DOMES MISSING. | |||
| BLD- ADA VEHICULAR WAY | 02/27/2025 | Disapproved - NO FEE | FWILLIS |
| Note: 2/12/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD- ADA SIGNAGECONTROL | 02/27/2025 | Disapproved - NO FEE | FWILLIS |
| Note: HANDICAP SIGNAGE MISSING. | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 02/27/2025 | Disapproved - NO FEE | FWILLIS |
| Note: 2/27/25 - TRUNCATED DOMES MISSING 2/12/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD- ADA PARKING | 02/27/2025 | Disapproved - NO FEE | FWILLIS |
| Note: 2/27/25 - HANDICAP SIGNS MISSING. 2/12/2025 - PREVIOUS INSPECTION NOTES | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 02/27/2025 | PARTIALLY APPROVED | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 2/27/2025 1:30:47 PM *** 1st phase 2/25/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/25/2025 4:26:09 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, CAN NOT VERIFY DEPTH OF CONDUITS WORK IS DONE 2/12/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/12/2025 2:10:38 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, ALSO NEED APPROVED STAMPED SET OF PLANS ON SITE FOR INSPECTION FBC 107.3.1 | |||
| LDSC- LANDSCAPE FINAL | 02/27/2025 | APPROVED | RPICATAGI |
| CLOSE OUT DOCUMENTS | 02/26/2025 | APPROVED | DRAMIREZ |
| MAINT BOND ACCEPTANCE (OFFICE) | 02/25/2025 | APPROVED | DRAMIREZ |
| Note: Bond not needed until the last stage is complete. | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 02/25/2025 | APPROVED | DRAMIREZ |
| Note: As-built for this stage has been approved | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 02/25/2025 | APPROVED | RMARTIN |
| Note: 2/12/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/12/2025 2:11:06 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, CAN NOT VERIFY DEPTH OF CONDUITS WORK IS DONE, ALSO NEED APPROVED STAMPED SET OF PLANS ON SITE FOR INSPECTION FBC 107.3.1 | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 02/25/2025 | Disapproved - NO FEE | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 2/25/2025 4:25:45 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, CAN NOT VERIFY DEPTH OF CONDUITS WORK IS DONE 2/12/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/12/2025 2:09:12 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, CAN NOT VERIFY DEPTH OF CONDUITS WORK IS DONE, ALSO NEED APPROVED STAMPED SET OF PLANS ON SITE FOR INSPECTION FBC 107.3.1 | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 02/25/2025 | Disapproved - NO FEE | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 2/25/2025 4:26:09 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, CAN NOT VERIFY DEPTH OF CONDUITS WORK IS DONE 2/12/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 2/12/2025 2:10:38 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, ALSO NEED APPROVED STAMPED SET OF PLANS ON SITE FOR INSPECTION FBC 107.3.1 | |||
| U-WATER METER INSTALLATION/VERIFICATION | 02/25/2025 | APPROVED | BWRIGHT |
| Note: 2/12/2025 - PREVIOUS INSPECTION NOTES | |||
| UC-SUBSTANTIAL WALK-THRU | 02/25/2025 | APPROVED | BWRIGHT |
| Note: 2/12/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9070 Inspection was done by J.Harding | |||
| UC-FINAL SITE INSPECTION | 02/25/2025 | FINAL APPROVED | BWRIGHT |
| Note: 2/12/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9070 | |||
| U - UTILITY COMMERCIAL FINAL | 02/25/2025 | APPROVED | BWRIGHT |
| LDSC-TREE BARRICADE | 02/24/2025 | APPROVED | RPICATAGI |
| LDSC-PRE-PLANTING TREE QUALITY | 02/20/2025 | APPROVED | RPICATAGI |
| Note: 1/8/2025 2:31:06 PM- PREVIOUS INSPECTION NOTES 1. All backflow preventers and ground mounted mechanical equipment must be screened with planitings or other (architectural methods) | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 02/19/2025 | APPROVED | RPICATAGI |
| LDSC-IRRIGATION FINAL | 02/18/2025 | APPROVED | RPICATAGI |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 02/12/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: Inspector Notes from Inspection 9070 Inspection was done by J.Harding | |||
| U-GRAVITY SEWER INSTALL/TESTING | 02/12/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: Inspector Notes from Inspection 9070 Inspection was done by J.Harding | |||
| UROW - FINAL DRAINAGE | 02/12/2025 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9070 Inspection was done by J.Harding | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 02/12/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: Inspector Notes from Inspection 9070 Inspection was done by J.Harding | |||
| U-WATER METER INSTALLATION/VERIFICATION | 02/12/2025 | CANCELLED BY APPLICANT | BWRIGHT |
| UC- PRELIMINARY AS-BUILTS | 02/12/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: Inspector Notes from Inspection 9070 Inspection was done by J.Harding | |||
| UC-FINAL SITE INSPECTION | 02/12/2025 | CANCELLED BY APPLICANT | BWRIGHT |
| Note: Inspector Notes from Inspection 9070 Inspection was done by J.Harding | |||
| UC-SUBSTANTIAL WALK-THRU | 02/12/2025 | CANCELLED BY APPLICANT | BWRIGHT |
| Note: Inspector Notes from Inspection 9070 Inspection was done by J.Harding | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 02/12/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: Inspector Notes from Inspection 9070 Inspection was done by J.Harding | |||
| LDSC-PRE-CLEARING | 02/12/2025 | APPROVED | RPICATAGI |
| LDSC-TREE BARRICADE | 02/12/2025 | CANCELLED BY APPLICANT | WEB |
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 02/12/2025 | Disapproved - NO FEE | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 2/12/2025 2:10:38 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, ALSO NEED APPROVED STAMPED SET OF PLANS ON SITE FOR INSPECTION FBC 107.3.1 | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 02/12/2025 | Disapproved - NO FEE | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 2/12/2025 2:11:06 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, CAN NOT VERIFY DEPTH OF CONDUITS WORK IS DONE, ALSO NEED APPROVED STAMPED SET OF PLANS ON SITE FOR INSPECTION FBC 107.3.1 | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 02/12/2025 | Disapproved - NO FEE | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 2/12/2025 2:09:12 PM *** NEED TO HAVE ELECTRICAL CONTRACTOR ON SITE FOR INSPECTION, CAN NOT VERIFY DEPTH OF CONDUITS WORK IS DONE, ALSO NEED APPROVED STAMPED SET OF PLANS ON SITE FOR INSPECTION FBC 107.3.1 | |||
| BLD - ADA COMPLIANT | 02/12/2025 | CANCELLED BY APPLICANT | FWILLIS |
| BLD- ADA PARKING | 02/12/2025 | CANCELLED BY APPLICANT | FWILLIS |
| CONSTRUCTION ENTRANCE | 02/12/2025 | APPROVED | BWRIGHT |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 02/12/2025 | CANCELLED BY APPLICANT | FWILLIS |
| BLD- ADA VEHICULAR WAY | 02/12/2025 | CANCELLED BY APPLICANT | FWILLIS |
| U-PUMP STATION START-UP | 02/11/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: Inspection was done by J.Harding | |||
| LDSC-PRE-PLANTING TREE QUALITY | 01/08/2025 | Disapproved - NO FEE | RPICATAGI |
| Note: 1. All backflow preventers and ground mounted mechanical equipment must be screened with plantings or other architectural methods. 2 A great deal of trash, construction debris, soil piles and othe items have been placed on site, just outside of silt fenced in wetlands areas. All such items shall be removed and wetland areas shall be restored to pre- reconstruction conditions 3. Contractor shall add an addtional 2" laye of mulch in all plantng beds to meet the 3" minimum requirement. Mulch depth will be chedked during landscape inspections 4. All unstablilized areas shall be stabilized by being seeded, sodded, mulched, rocked or by other methods. Items 1-4 must be completed, then documented by preparing AS Builts for Landscape and Irrigation, signed and sealed byy RLA. Irrigation Affidavit, signed by RLA or Certified Irrigation Professional. Then all items must also be submitted and approved. | |||
| UC-ASPHALT PRE PLACEMENT | 04/28/2023 | APPROVED | DHANEY |
| UC-DRAINAGE STRUCT PLACMNT | 03/28/2023 | APPROVED | JHARDING |
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 03/28/2023 | APPROVED | JHARDING |
| UROW-RETENT/DETENT STABILI | 03/28/2023 | APPROVED | JHARDING |
| UROW -FINAL GRADE PRIOR SOD | 03/28/2023 | APPROVED | JHARDING |
| UROW- CURBING & GUTTER | 03/28/2023 | APPROVED | JHARDING |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 03/28/2023 | APPROVED | JHARDING |
| U-REUSE MAIN INSTALL/TESTING | 03/28/2023 | APPROVED | JHARDING |
| U-WATER MAIN DISINFECTION | 03/28/2023 | APPROVED | JHARDING |
| U-WATER MAIN DISINFECTION SAMPLING | 03/28/2023 | APPROVED | JHARDING |
| U-PUMP STATION PRE-INSTALLATION | 03/28/2023 | APPROVED | JHARDING |
| U-SEWER FORCE MAIN INSTALL/TESTING | 03/28/2023 | APPROVED | JHARDING |
| U-WATER SERVICE INSTALLATION | 03/28/2023 | APPROVED | JHARDING |
| U-GRAVITY SEWER INSTALL/TESTING | 03/28/2023 | CANCELLED BY APPLICANT | JHARDING |
| Note: Not ready | |||
| PROJECT STATUS (OFFICE USE) | 01/12/2023 | APPROVED | JHARDING |
| Note: Utilities installed, pressure test done on water and reclaim. | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 02/08/2022 | APPROVED | DHANEY |
| UC-CONSTRUCTION ENTRANCE | 12/30/2021 | APPROVED | JHARDING |
| PLAN - PRE-CON 386-986-3750 | 12/17/2021 | APPROVED | DHANEY |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/13/2021 | 12/14/2021 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/13/2021 | 12/14/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 12/13/2021 | 12/14/2021 |
| Note: Released By: DENNIS R. LEAP, P.E. - - DLEAP@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 12/13/2021 | 12/13/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 12/13/2021 | 12/14/2021 |
| Note: Released By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 02/06/2025 |
| EXTENSION | ¤40.00 | 01/27/2025 |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 12/14/2021 |
| INSPECTION - GENERAL | ¤360.00 | 12/14/2021 |
| SITE INSPECTION | ¤800.00 | 12/14/2021 |
| SITE PLAN 30 | ¤30.00 | 12/14/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,395.00 |