I want to search for...

Permit #2021120667

Permit Details

Status: COED

Parcel Id: 15-11-31-2970-00000-0250
Total Square Footage: 5255 sqft
Block: 00000
Subdivision: 2070 - GRAND HAVEN NORTH PHASE 1
Job Phone: 847-942-1764
Location Address: 19 WATERVIEW DR
Type: RF - REROOF
Issue Date: 12/15/2021
NOC: RECORDED
Applicant name: MATTHEW BREITENGROSS
Owner: DIETZ RICHARD & SHARON H&W

Address

19 S WATERVIEW DRIVE

PALM COAST, FL 32137

Lot: 0250
Contracted Stated Job Value: ¤31,000.00
Job Description: SHINGLE RE-ROOF, APPROVAL CODE FL10124-R29
Type: CN

Contractor

EXTREME WEATHER CONSULTING, LLC
Status Location Address State License Number Phone
CANCEL

2206 NW 39TH AVE

CAPE CORAL, FL 33993

CCC1332204 (Exp: 08/22/2022) 847-942-1764

Inspection History

Type Request Date Result Inspector
ROOF FINAL 01/05/2022 FINAL APPROVED AGAETANO
ROOF AFFIDAVIT 01/03/2022 APPROVED MDEFREITAS
ROOF IN PROGRESS- MIDROOF 12/29/2021 APPROVED LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Midroof not ready: • At least 50% shingles need to be removed, • At least 50% of drip edge needs to be applied, • at least 50% percent of underlayment needs to be installed, • need some, (up to 25) percent of shingles installed, • need roofing worksheet and, ASTM docs and Manufacturer docs along with permit on site for inspection 107.3,1 12-28-21... notes above still apply (still not ready) 12-29-21... notes above resolved
ROOF IN PROGRESS- MIDROOF 12/28/2021 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION Midroof not ready: • At least 50% shingles need to be removed, • At least 50% of drip edge needs to be applied, • at least 50% percent of underlayment needs to be installed, • need some, (up to 25) percent of shingles installed, • need roofing worksheet and, ASTM docs and Manufacturer docs along with permit on site for inspection 107.3,1 12-28-21... notes above still apply (still not ready)
ROOF IN PROGRESS- MIDROOF 12/21/2021 CANCELLED BY APPLICANT WEB
ROOF IN PROGRESS- MIDROOF 12/20/2021 Disapproved -FEE REQUIRED LMILLER
Note: Midroof not ready: • At least 50% shingles need to be removed, • At least 50% of drip edge needs to be applied, • at least 50% percent of underlayment needs to be installed, • need some, (up to 25) percent of shingles installed, • need roofing worksheet and, ASTM docs and Manufacturer docs along with permit on site for inspection 107.3,1

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 12/28/2021
REINSPECTION RESIDENTIAL ¤40.00 12/28/2021
SURCHARGE FS 533.721 ¤2.00 12/15/2021
SURCHARGE - FS 468.631 ¤2.00 12/15/2021
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/15/2021
INSPECTION - RESIDENTIAL ¤85.25 12/15/2021
Fees Total Due: ¤0.00 Total Paid: ¤199.25