Permit #2021120677
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7006-00030-0350 |
| Block: 00030 |
| Subdivision: 2213 - SECTION 6-FLORIDA PARK |
| Job Phone: 786-512-4421 |
| Location Address: 101 FLORIDA PARK DR |
| Type: DR - DRIVEWAY |
| Issue Date: 12/30/2021 |
| NOC: RECORDED |
| Applicant name: ABEL MENENDEZ |
| Owner: AJRAM GHASSAN E |
|
Address 101 FLORIDA PARK DRIVE PALM COAST, FL 32137 |
| Lot: 0350 |
| Contracted Stated Job Value: ¤15,000.00 |
| Job Description: CIRCULAR DRIVEWAY PAVERS |
| Type: CN |
Contractor
ROYAL TILE & PAVERS INC
| Status | Location Address | Phone |
| ACTIVE |
69 FLEETWOOD DR PALM COAST, FL 32137 |
786-512-4421 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 02/22/2022 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 02/18/2022 | APPROVED | KRUTH |
| ROW - FINAL INSPECTION | 02/18/2022 | APPROVED | KRUTH |
| ROW- PRE-APRON (PRE-POUR) | 01/12/2022 | APPROVED - AS NOTED | KRUTH |
| Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 12/29/2021 | 12/29/2021 |
| Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/28/2021 | 12/28/2021 |
| Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM REPEAT COMMENTS: 1. Driveway arc must meet minimum 5' setback from the arc to the front property line NOT from the Right-of-way. 2. Provide setback from driveway to left of property line. 3. Provide width of paver walkway. 4. State clearly the width of the circular driveway on the site plan. 5. Notary must complete the Right-of-Way agreement. | |||
| ZON | HOLD | 12/22/2021 | 12/22/2021 |
| Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Repeat comments: 1. Driveway arc must meet minimum 5' setback from the arc to the front property line NOT from the Right-of-way. 2. Provide setback from driveway to left of property line. 3. Provide width of paver walkway. 4. State clearly the width of the circular driveway on the site plan. 5. Notary must complete the Right-of-Way agreement. | |||
| ENGIN1 | COMPLETE | 12/22/2021 | 12/27/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 12/22/2021 | 12/29/2021 |
| Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/15/2021 | 12/17/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 12/15/2021 | 12/21/2021 |
| Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/15/2021 | 12/15/2021 |
| Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM 1. Driveway arc must meet minimum 5' setback from the arc to the front property line. 2. Provide setback from driveway to left of property line. 3. Provide width of paver walkway. 4. State clearly the width of the circular driveway on the site plan. 5. Notary must complete the Right-of-Way agreement. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/30/2021 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 12/30/2021 |
| SW ENG INSPECTION 40 | ¤40.00 | 12/30/2021 |
| SW ENG PRE APRON | ¤30.00 | 12/30/2021 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/30/2021 |
| SITE PLAN 15 | ¤15.00 | 12/30/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤359.00 |