I want to search for...
Permit #2021120823
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00150-0160 |
| CONDITIONED SPACE: 2418 sqft |
| GARAGE: 614 sqft |
| OPENED PORCH (WITH ROOF) : 319 sqft |
| Total Square Footage: 3351 sqft |
| Block: 00150 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 321-271-9033 |
| Location Address: 30 BURNING BUSH DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/07/2022 |
| NOC: RECORDED |
| Applicant name: KEITH E TANNER |
| Owner: VINTAGE ESTATE HOMES |
|
Address 4885 N WICKHAM ROAD MELBOURNE, FL 32940 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
STE 101 MELBOURNE, FL 32940 |
CGC1516602 (Exp: 08/31/2024) | 321-610-3924 |
Sub Contractors
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
ZACHARY PETER BOERA
| Status | Location Address | State License Number | Phone |
| CANCEL |
7225 SANDSCOVE COURT, SUITE 1 WINTER PARK, FL 32792 |
CAC1817652 (Exp: 08/31/2022) | 407-629-6920 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/22/2023 | FINAL APPROVED | JSTEWART |
| ROW - FINAL APRON (AFTER POUR) | 02/13/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/13/2023 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 02/13/2023 | FINAL APPROVED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 02/13/2023 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/08/2023 | APPROVED | PFLANAGAN |
| Note: 2/3/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE ELEVATIONS 10' OFF THE RIGHT AND LEFT PROPERTY LINES ON THE ADJACENT LOTS SO WE CAN DETERMINE IF THE DRAINAGE IS IMPACTING THE LOTS NEXT DOOR. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/03/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO HAVE ELEVATIONS 10' OFF THE RIGHT AND LEFT PROPERTY LINES ON THE ADJACENT LOTS SO WE CAN DETERMINE IF THE DRAINAGE IS IMPACTING THE LOTS NEXT DOOR. | |||
| U-CROSS CONNECTION | 01/30/2023 | APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 01/24/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 10 AM | |||
| ELECTRIC - EARLY POWER | 01/23/2023 | Disapproved - NO FEE | JMUNSON |
| Note: 1/18/2023 - PREVIOUS INSPECTION NOTES Overhead service conductors not phased properly 1/23/23 Neutral wire in meter can needs to be phased. NEC 2017 200.6 (B) | |||
| ELECTRIC - EARLY POWER | 01/18/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Overhead service conductors not phased properly | |||
| ROW- PRE-APRON (PRE-POUR) | 01/13/2023 | APPROVED | EMADISON |
| Note: ** 01/13/23 READY TO POUR IN THE EVENT OF RAIN RECHECK CULVERT ELEVATION AND COMPACTION ** BUILDER MAKE SURE THE MATERIAL IS COMPACTED ON THE ON THE HOUSE SIDE OF THE CULVERT **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SPOKE WITH BUILDER ON SITE IN REGARD TO COMPACTION OF MATERIAL 1/12/2023 - PREVIOUS INSPECTION NOTES ** 01/12/23 BUILDER NEEDS TO ADJUST THE CULVERT AS CENTER OF CULVERT IS SAGGING IN TO LOW ** MATERIAL ON THE TOP OF ROW NEEDS TO HAVE A GRADUAL SLOPE AWAY FROM THE CULVERT WITH COMPACTION OF THE MATERIAL ** CHECK FORM BOARDS MAKE SURE THERE WILL BE A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY ABOVE THE ROW. ___________________________________________________________________________________________________________________________ | |||
| U - SEWER TIE IN | 01/13/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 11/23/2022 - PREVIOUS INSPECTION NOTES THIS WAS A VIRTUAL INSPECTION THGIS WAS APPROVED ALREADY | |||
| ROW- PRE-APRON (PRE-POUR) | 01/12/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/12/23 BUILDER NEEDS TO ADJUST THE CULVERT AS CENTER OF CULVERT IS SAGGING IN TO LOW ** MATERIAL ON THE TOP OF ROW NEEDS TO HAVE A GRADUAL SLOPE AWAY FROM THE CULVERT WITH COMPACTION OF THE MATERIAL ** CHECK FORM BOARDS MAKE SURE THERE WILL BE A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY ABOVE THE ROW. ___________________________________________________________________________________________________________________________ | |||
| U - SEWER TIE IN | 11/23/2022 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 11/14/2022 | APPROVED | CSTONE |
| INSULATION | 11/04/2022 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 1. Dryer vent needs to be sealed along entire length of seam. Check on insualtion | |||
| ALL ROUGH | 11/01/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Dryer vent needs to be sealed along entire length of seam. Check on insualtion | |||
| ALL ROUGH | 10/27/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: 10/27/22 No plans or permits on site. Dryer vent needs to be sealed along entire length of seam. Range vent needs to be supported every 6ft Water pressure test failed. Stopped inspection. | |||
| ROW - DRAINAGE | 09/23/2022 | APPROVED | EMADISON |
| Note: ** 09/23/22 CORRECTIONS MADE IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. 9/20/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION ** 09/20/22 BUILDER NEEDS TO OPEN UP DRAINAGE CONVEYANCE (SWALE) TEMPORARY PIPE IS BLOCKED WATER BACKING UP ONTO STREET. ** NEED TO REMOVE PORTA-JOHN FROM SWALE PUT ON PROJECDT SITE. ** FOLLOW UP INSPECTION ON 09/23/22 THIS IS A REINSPECTION 07/20/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 7/21/22 THIS IS A REINSPECTION ** CONDITIONS REMAIN THE SAME SINCE THE LAST INSPECTION ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** NEED TO REMOVE WASHED OUT DIRT FROM ROADWAY. ** NEXT INSPECTION 07/20/22 ** CONDITIONS REMAIN THE SAME SINCE THE LAST INSPECTION ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** NEED TO REMOVE WASHED OUT DIRT FROM ROADWAY. ** FOLLOW UP INSPECTION ON 07/19/22 ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** FOLLOWUP INSPECTION ON 07/18/22. 7/21/22 - Culvert still 1/2 clogged and blocking drainage. | |||
| ROW - DRAINAGE | 09/20/2022 | Disapproved - NO FEE | EMADISON |
| Note: THIS IS A REINSPECTION ** 09/20/22 BUILDER NEEDS TO OPEN UP DRAINAGE CONVEYANCE (SWALE) TEMPORARY PIPE IS BLOCKED WATER BACKING UP ONTO STREET. ** NEED TO REMOVE PORTA-JOHN FROM SWALE PUT ON PROJECDT SITE. ** FOLLOW UP INSPECTION ON 09/23/22 THIS IS A REINSPECTION 07/20/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 7/21/22 THIS IS A REINSPECTION ** CONDITIONS REMAIN THE SAME SINCE THE LAST INSPECTION ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** NEED TO REMOVE WASHED OUT DIRT FROM ROADWAY. ** NEXT INSPECTION 07/20/22 ** CONDITIONS REMAIN THE SAME SINCE THE LAST INSPECTION ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** NEED TO REMOVE WASHED OUT DIRT FROM ROADWAY. ** FOLLOW UP INSPECTION ON 07/19/22 ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** FOLLOWUP INSPECTION ON 07/18/22. 7/21/22 - Culvert still 1/2 clogged and blocking drainage. | |||
| LATH/BRICK/ WATER BARRIER | 08/23/2022 | APPROVED | FWILLIS |
| ROW - DRAINAGE | 07/21/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION 07/20/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 7/21/22 THIS IS A REINSPECTION ** CONDITIONS REMAIN THE SAME SINCE THE LAST INSPECTION ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** NEED TO REMOVE WASHED OUT DIRT FROM ROADWAY. ** NEXT INSPECTION 07/20/22 ** CONDITIONS REMAIN THE SAME SINCE THE LAST INSPECTION ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** NEED TO REMOVE WASHED OUT DIRT FROM ROADWAY. ** FOLLOW UP INSPECTION ON 07/19/22 ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** FOLLOWUP INSPECTION ON 07/18/22. 7/21/22 - Culvert still 1/2 clogged and blocking drainage. | |||
| ROW - DRAINAGE | 07/20/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 07/20/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 7/21/22 THIS IS A REINSPECTION ** CONDITIONS REMAIN THE SAME SINCE THE LAST INSPECTION ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** NEED TO REMOVE WASHED OUT DIRT FROM ROADWAY. ** NEXT INSPECTION 07/20/22 ** CONDITIONS REMAIN THE SAME SINCE THE LAST INSPECTION ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** NEED TO REMOVE WASHED OUT DIRT FROM ROADWAY. ** FOLLOW UP INSPECTION ON 07/19/22 ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** FOLLOWUP INSPECTION ON 07/18/22. | |||
| ROW - DRAINAGE | 07/19/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: THIS IS A REINSPECTION ** THIS IS A REINSPECTION ** CONDITIONS REMAIN THE SAME SINCE THE LAST INSPECTION ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** NEED TO REMOVE WASHED OUT DIRT FROM ROADWAY. ** NEXT INSPECTION 07/20/22 ** CONDITIONS REMAIN THE SAME SINCE THE LAST INSPECTION ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** NEED TO REMOVE WASHED OUT DIRT FROM ROADWAY. ** FOLLOW UP INSPECTION ON 07/19/22 ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** FOLLOWUP INSPECTION ON 07/18/22. | |||
| ROW - DRAINAGE | 07/18/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: THIS IS A REINSPECTION ** CODITIONS REMAIN THE SAME SINCE THE LAST INSPECTION ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** NEED TO REMOVE WASHED OUT DIRT FROM ROADWAY. ** FOLLOW UP INSPECTION ON 07/19/22 ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** FOLLOWUP INSPECTION ON 07/18/22. | |||
| ROW - DRAINAGE | 07/13/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** CULVERT PIPE IS PLUGGED NEED TO OPEN PIPE TO ALLOW STORMWATER TO FLOW AND NOT BACK UP HAVING A NEGATIVE IMPACT ONN ADJACENT PROPERTIES OR THE STREET ** FOLLOWUP INSPECTION ON 07/18/22. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/07/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION PLANS ON SITE ARE IN POOR CONDITION WITH PAGES MISSING. PLANS WERE INSIDE ON A/C FRAMING. | |||
| ROOF VALLEY & METAL | 07/05/2022 | APPROVED | FWILLIS |
| WALL SHEATHING | 07/05/2022 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/05/2022 | Disapproved - NO FEE | FWILLIS |
| Note: PLANS ON SITE ARE IN POOR CONDITION WITH PAGES MISSING. PLANS WERE INSIDE ON A/C FRAMING. | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/08/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/25/2022 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 05/25/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Wood frame house | |||
| MONOLITHIC SLAB | 05/13/2022 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/04/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 05/04/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 04/20/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | COMPLETE | 02/07/2023 | 02/07/2023 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FINAL SURVEY.PDF | |||
| MECH | COMPLETE | 02/02/2023 | 02/03/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 01/30/2023 | 01/30/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM NOC expired unable to process final survey. | |||
| ENGIN1 | COMPLETE | 06/08/2022 | 06/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/08/2022 | 06/08/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/24/2022 | 01/25/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/24/2022 | 01/25/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/11/2022 | 01/11/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please submit page showing side elevations. Do not see one in the submittal | |||
| MECH | HOLD | 01/11/2022 | 01/12/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to be St. Augustine. Not Orlando | |||
| ELEC | COMPLETE | 01/11/2022 | 01/12/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/20/2021 | 02/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/19/2021 | 12/20/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/19/2021 | 12/29/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 12/19/2021 | 12/21/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2017 NEC-Electrical PLAN REVIEW COMMENTS: 1. Provide electrical load calculations 2. Outlet spacing in the Nook area does not meet the requirements of 210.52(D). | |||
| ENGIN1 | COMPLETE | 12/19/2021 | 12/20/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/19/2021 | 12/22/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/19/2021 | 12/20/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide the following items below for clarity per FBC 7th Ed. Sec. 107.3: 1. Mechanical Plan : a. Duct layout is flipped with garage door is located at the right side instead of left. 2. Energy Calculations: a. Design weather information is not consisent. One location shows Jacksonville airport the other shows Orlando airport. b. Data input of some individual rooms (room height) do not match with plans. | |||
| SW1 | COMPLETE | 12/19/2021 | 12/28/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/19/2021 | 12/20/2021 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please sutmit all sides of exterior elevations for review. Please submit elevation pages to match the garage orientation of the home being constructed. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 02/22/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 02/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/22/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/22/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/22/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/22/2023 |
| CONNECTION FEES | ¤1,077.88 | 02/07/2022 |
| METER - DEPOSIT | ¤60.00 | 02/07/2022 |
| WATER- TURN ON | ¤25.00 | 02/07/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/07/2022 |
| INSPECTION - RESIDENTIAL | ¤841.50 | 02/07/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤238.68 | 02/07/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/07/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/07/2022 |
| TRANSPORTATION IMPACT FEE | ¤1,718.00 | 02/07/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 02/07/2022 |
| SEWER CREDIT | (¤850.00) | 02/07/2022 |
| SEWER INSPECTION | ¤25.00 | 02/07/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 02/07/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 02/07/2022 |
| SITE PLAN 30 | ¤30.00 | 02/07/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/07/2022 |
| SW ENG PRE APRON | ¤30.00 | 02/07/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 02/07/2022 |
| IMPACT FEE FIRE | ¤388.65 | 02/07/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 02/07/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/07/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/07/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 02/07/2022 |
| SURCHARGE FS 533.721 | ¤11.69 | 02/07/2022 |
| SURCHARGE - FS 468.631 | ¤17.54 | 02/07/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/07/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,805.98 |