I want to search for...

Permit #2021120950

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-00350-0230
CONDITIONED SPACE: 2258 sqft
GARAGE: 767 sqft
OPENED PORCH (WITH ROOF) : 276 sqft
OPENED PORCH (WITH ROOF) : 64 sqft
Total Square Footage: 3365 sqft
Block: 00350
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-931-4799
Location Address: 11 EASTGATE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/27/2022
NOC: RECORDED
Applicant name: JOHN DONALD GORDON
Owner: PRECISION CUSTOM BUILDERS OF NORTH FLORIDA LLC

Address

7755 S US HIGHWAY #1

BUNNELL, FL 32110

Lot: 0230
Contracted Stated Job Value: ¤254,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PRECISION CUSTOM BUILDERS OF NORTH FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

7755 S. US HWY 1

BUNNELL, FL 32110

CGC1528576 (Exp: 08/31/2026) 386-931-4799

Sub Contractors

MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
RICHARD GARY WILSON JR
Status Location Address Mailing Address State License Number Phone
ACTIVE

1504 OLD MOODY BLVD

BUNNELL, FL 32110

UNIT 6

BUNNELL, FL 32110

CAC1817645 (Exp: 08/31/2026) 386-586-6290
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/04/2022 FINAL APPROVED KSANDOE
Note: 9/27/2022 - PREVIOUS INSPECTION NOTES 09/27/2022: INSPECTION STOPPED - 1). No water on in house. 2). No Energy sheets on site - Could not verify HVAC equipment & breaker size. * Insulation, GFCI, lighting, electrical, smoke alarms, vacuum breakers, door seals, garage door openers, water heater all checked & verified.
U -UTILITY RESIDENTIAL FINAL 10/04/2022 FINAL APPROVED JHARDING
Note: 9/27/2022 - PREVIOUS INSPECTION NOTES Power from house needs to be connected to pep panel.
BLD - BUILDING FINAL 09/27/2022 Disapproved - NO FEE RSIMS
Note: 09/27/2022: INSPECTION STOPPED - 1). No water on in house. 2). No Energy sheets on site - Could not verify HVAC equipment & breaker size. * Insulation, GFCI, lighting, electrical, smoke alarms, vacuum breakers, door seals, garage door openers, water heater all checked & verified.
U -UTILITY RESIDENTIAL FINAL 09/27/2022 Disapproved - NO FEE JHARDING
Note: Power from house needs to be connected to pep panel.
ROW FIELD SURVEY /GRADING CERTIFICATION 09/26/2022 APPROVED GBERTOLA
Note: 09/26/22=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - STORMWATER FINAL 09/26/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - FINAL APRON (AFTER POUR) 09/26/2022 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/26/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 09/26/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE THE CULVERT PIPE INVERTS ARE OUT OF TOLERANCE FROM SWALE DIAGRAM. ......................................................................................................................................................................................................................................... 9/22/2022 - PREVIOUS INSPECTION NOTES THE CULVERT PIPE INVERTS ARE OUT OF TOLERANCE FROM SWALE DIAGRAM
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/26/2022 APPROVED GBERTOLA
Note: 09/26/22= WASN'T UPLOAD THE NEW FINAL SURVEY IN THE SYSTEM I RELOAD THE SYSTEM, REMOVING THE FEES 9/26/2022 - PREVIOUS INSPECTION NOTES 09/26/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE THE CULVERT PIPE INVERTS ARE OUT OF TOLERANCE FROM SWALE DIAGRAM. ......................................................................................................................................................................................................................................... 9/22/2022 - PREVIOUS INSPECTION NOTES THE CULVERT PIPE INVERTS ARE OUT OF TOLERANCE FROM SWALE DIAGRAM
ROW FIELD SURVEY /GRADING CERTIFICATION 09/22/2022 Disapproved - NO FEE PFLANAGAN
Note: THIS INSPECTION IS PUT ON BY US AS INSPECTOR THE FINAL SURVEY NEEDS TO PASS BEFORE THIS IS PUT UP FOR INSPECTION
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/22/2022 Disapproved - NO FEE PFLANAGAN
Note: THE CULVERT PIPE INVERTS ARE OUT OF TOLERANCE FROM SWALE DIAGRAM
TUB SET 09/22/2022 APPROVED MGIBSON
ELECTRIC - EARLY POWER 07/27/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 9:34 am
GRAVITY SEWER TEST 07/25/2022 APPROVED MGIBSON
U - SEWER TIE IN 07/25/2022 APPROVED MGIBSON
U-CROSS CONNECTION 07/25/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PRE-APRON (PRE-POUR) 07/25/2022 APPROVED - AS NOTED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK CULVERT PIPE ELEVATION BEFORE POURING CONCRETE FOR THE DRIVEWAY
PEP TANK INSTALLATION REQUEST 07/14/2022 APPROVED CSTONE
INSULATION 07/05/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2420 Fill concrete floor cut out in kitchen. Seal Mirowave exhaust pipe completely. Rear french doors need a moisture barrier install at head where it hits the CMU. Adding a Tub set inspection. 7/1/22 Wood bearing separation wall in garage needs to be sealed all the way around. Fill concrete floor cut out in kitchen Rear french doors need moisture barrier
INSULATION 07/01/2022 Disapproved - NO FEE KSANDOE
Note: Inspector Notes from Inspection 2420 Fill concrete floor cut out in kitchen. Seal Mirowave exhaust pipe completely. Rear french doors need a moisture barrier install at head where it hits the CMU. Adding a Tub set inspection. 7/1/22 Wood bearing separation wall in garage needs to be sealed all the way around. Fill concrete floor cut out in kitchen Rear french doors need moisture barrier
LATH/BRICK/ WATER BARRIER 07/01/2022 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2420 Fill concrete floor cut out in kitchen. Seal Mirowave exhaust pipe completely. Rear french doors need a moisture barrier install at head where it hits the CMU. Adding a Tub set inspection.
ALL ROUGH 06/21/2022 APPROVED - AS NOTED JWALKER
Note: Fill concrete floor cut out in kitchen. Seal Mirowave exhaust pipe completely. Rear french doors need a moisture barrier install at head where it hits the CMU. Adding a Tub set inspection.
ROOF VALLEY & METAL 05/19/2022 APPROVED JWALKER
WALL SHEATHING 05/11/2022 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/11/2022 APPROVED - AS NOTED JWALKER
Note: 1) The garage bearing wall is not sitting at the footing area. Appears the concrete layout may have been off. Have engineer submitt a letter to the building department stating the location of the wall is acceptable. 2) Install missing achor bolts at garage bearing wall and tighten all nuts. Marked with black marker on bottom plate for missed anchor locations. 3) Install blocking between the trusses at the right side of the front entry to carring the kneewall and install hold anchors. The HU26 buckets have not been installed at truss location H11A to carry EJ trusses.
FOUND SURVEY APPROVED (OFFICE) 05/10/2022 APPROVED AMOBLEY
TIE BEAM / LINTEL 04/07/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Down rods at front entry where the block wall step up have been pieced together and not tied continous. Down rods are to have a 90 degree hook and are to be continous from top of wall to bottom down cell. Overlapping is to be 25" minium. CHECK ALL. Several areas down rods not tied to down cells. Check all. Lintels steel has been installed. 4/5/22 (3) corner areas at the front entry have not been properly corrected. Pieces have been dropped and tied in place. The down rod is to run continuous from top of wall to down cell. Any laps are to be a minimum of 25"s and tied together. The 3 arears are marked on the print in blue ink. FBR-608.7.2.2.3 Seventh edition.
TIE BEAM / LINTEL 04/05/2022 Disapproved -FEE REQUIRED JWALKER
Note: THIS IS A REINSPECTION Down rods at front entry where the block wall step up have been pieced together and not tied continous. Down rods are to have a 90 degree hook and are to be continous from top of wall to bottom down cell. Overlapping is to be 25" minium. CHECK ALL. Several areas down rods not tied to down cells. Check all. Lintels steel has been installed. 4/5/22 (3) corner areas at the front entry have not been properly corrected. Pieces have been dropped and tied in place. The down rod is to run continuous from top of wall to down cell. Any laps are to be a minimum of 25"s and tied together. The 3 arears are marked on the print in blue ink. FBR-608.7.2.2.3 Seventh edition.
TIE BEAM / LINTEL 04/04/2022 Disapproved - NO FEE JWALKER
Note: Down rods at front entry where the block wall step up have been pieced together and not tied continous. Down rods are to have a 90 degree hook and are to be continous from top of wall to bottom down cell. Overlapping is to be 25" minium. CHECK ALL. Several areas down rods not tied to down cells. Check all. Lintels steel has been installed.
ELECTRIC TEMP POLE 02/24/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 8:45 am
MONOLITHIC SLAB 02/22/2022 APPROVED RMARTIN
PLUMBING 1ST ROUGH UNDERGROUND 02/14/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/08/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 2/7/2022 8:57:05 AM lot not cleared
WATER METER INSTALLATION REQUEST 02/01/2022 Disapproved - NO FEE CSTONE
Note: lot not cleared
WILDLIFE CHECK - ENVIRONMENTAL 01/04/2022 APPROVED JMYERS

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 05/10/2022 05/10/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/10/2022 05/10/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 01/13/2022 01/13/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
ELEC COMPLETE 01/13/2022 01/14/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/13/2022 01/13/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 01/13/2022 01/20/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
SWALE COMPLETE 01/13/2022 02/17/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH COMPLETE 12/29/2021 12/29/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 12/22/2021 12/22/2021
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 12/22/2021 12/29/2021
Note: Released By: HALEIGH HAND - -
ELEC HOLD 12/22/2021 12/22/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2017 NEC-Electrical PLAN REVIEW COMMENTS: 1. Provide electrical load calculations
ENGIN1 HOLD 12/22/2021 12/27/2021
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey
LOCATE COMPLETE 12/22/2021 12/27/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 12/22/2021 12/22/2021
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Energy calculations for heating and cooling loads do not comply with the directional orientation of the buiding as reflected on windows orientation and site plan per FBC- Energy conservation 7th Ed. Sec. R403.7.1.
SW1 COMPLETE 12/22/2021 12/28/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON HOLD 12/22/2021 12/22/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Floor plan is missing the Square footage of home.
PLENV COMPLETE 12/22/2021 01/04/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 1/4/22 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 09/26/2022
CONNECTION FEES ¤1,077.88 01/27/2022
CONNECTION FEES (¤1,077.88) 01/27/2022
CONNECTION FEES ¤1,077.88 01/27/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 01/27/2022
3% FIRE IMPACT FEE CREDIT ¤11.66 01/27/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 01/27/2022
IMPACT FEE FIRE (¤388.65) 01/27/2022
IMPACT FEE FIRE ¤388.65 01/27/2022
IMPACT FEE FIRE ¤388.65 01/27/2022
IMPACT FEE PARKS ¤1,455.13 01/27/2022
IMPACT FEE PARKS (¤1,455.13) 01/27/2022
IMPACT FEE PARKS ¤1,455.13 01/27/2022
IMPACT FEE SCHOOL (¤3,600.00) 01/27/2022
IMPACT FEE SCHOOL ¤3,600.00 01/27/2022
IMPACT FEE SCHOOL ¤3,600.00 01/27/2022
WATER -IRRIGATION INSPECTION ¤25.00 01/27/2022
WATER -IRRIGATION INSPECTION (¤25.00) 01/27/2022
WATER -IRRIGATION INSPECTION ¤25.00 01/27/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 01/27/2022
3% PARKS IMPACT FEE CREDIT ¤43.65 01/27/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 01/27/2022
SURCHARGE FS 533.721 (¤11.33) 01/27/2022
SURCHARGE FS 533.721 ¤11.33 01/27/2022
SURCHARGE FS 533.721 ¤11.33 01/27/2022
SURCHARGE - FS 468.631 ¤17.00 01/27/2022
SURCHARGE - FS 468.631 (¤17.00) 01/27/2022
SURCHARGE - FS 468.631 ¤17.00 01/27/2022
SW ENG - FOUNDATION SURVEY (¤20.00) 01/27/2022
SW ENG - FOUNDATION SURVEY ¤20.00 01/27/2022
SW ENG - FOUNDATION SURVEY ¤20.00 01/27/2022
SW ENG INSPECTION 80 ¤80.00 01/27/2022
SW ENG INSPECTION 80 (¤80.00) 01/27/2022
SW ENG INSPECTION 80 ¤80.00 01/27/2022
SW ENG PRE APRON (¤30.00) 01/27/2022
SW ENG PRE APRON ¤30.00 01/27/2022
SW ENG PRE APRON ¤30.00 01/27/2022
SW ENG - REVIEW 20 ¤20.00 01/27/2022
SW ENG - REVIEW 20 (¤20.00) 01/27/2022
SW ENG - REVIEW 20 ¤20.00 01/27/2022
SW ENG RES REVIEW 200 (¤200.00) 01/27/2022
SW ENG RES REVIEW 200 ¤200.00 01/27/2022
SW ENG RES REVIEW 200 ¤200.00 01/27/2022
TRANSPORTATION IMPACT FEE ¤1,718.00 01/27/2022
TRANSPORTATION IMPACT FEE (¤1,718.00) 01/27/2022
TRANSPORTATION IMPACT FEE ¤1,718.00 01/27/2022
3% TRANS IMPACT FEE CREDIT ¤51.54 01/27/2022
3% TRANS IMPACT FEE CREDIT (¤51.54) 01/27/2022
3% TRANS IMPACT FEE CREDIT (¤51.54) 01/27/2022
SEWER CREDIT (¤850.00) 01/27/2022
SEWER CREDIT ¤850.00 01/27/2022
SEWER CREDIT (¤850.00) 01/27/2022
SEWER INSPECTION ¤25.00 01/27/2022
SEWER INSPECTION (¤25.00) 01/27/2022
SEWER INSPECTION ¤25.00 01/27/2022
SEWER CAPITAL FACILITY (¤4,939.76) 01/27/2022
SEWER CAPITAL FACILITY ¤4,939.76 01/27/2022
SEWER CAPITAL FACILITY ¤4,939.76 01/27/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 01/27/2022
WATER CAPITAL FACILITY FEE (¤3,626.50) 01/27/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 01/27/2022
SITE PLAN 30 ¤30.00 01/27/2022
SITE PLAN 30 (¤30.00) 01/27/2022
SITE PLAN 30 ¤30.00 01/27/2022
METER - DEPOSIT ¤60.00 01/27/2022
METER - DEPOSIT (¤60.00) 01/27/2022
METER - DEPOSIT ¤60.00 01/27/2022
WATER- TURN ON (¤25.00) 01/27/2022
WATER- TURN ON ¤25.00 01/27/2022
WATER- TURN ON ¤25.00 01/27/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/27/2022
ADMINISTRATIVE RESIDENTIAL (¤30.00) 01/27/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/27/2022
INSPECTION - RESIDENTIAL (¤814.00) 01/27/2022
INSPECTION - RESIDENTIAL ¤814.00 01/27/2022
INSPECTION - RESIDENTIAL ¤814.00 01/27/2022
PLAN REVIEW - RESIDENTIAL ¤230.88 01/27/2022
PLAN REVIEW - RESIDENTIAL (¤230.88) 01/27/2022
PLAN REVIEW - RESIDENTIAL ¤230.88 01/27/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,507.28