I want to search for...
Permit #2021120950
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00350-0230 |
| CONDITIONED SPACE: 2258 sqft |
| GARAGE: 767 sqft |
| OPENED PORCH (WITH ROOF) : 276 sqft |
| OPENED PORCH (WITH ROOF) : 64 sqft |
| Total Square Footage: 3365 sqft |
| Block: 00350 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-931-4799 |
| Location Address: 11 EASTGATE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/27/2022 |
| NOC: RECORDED |
| Applicant name: JOHN DONALD GORDON |
| Owner: PRECISION CUSTOM BUILDERS OF NORTH FLORIDA LLC |
|
Address 7755 S US HIGHWAY #1 BUNNELL, FL 32110 |
| Lot: 0230 |
| Contracted Stated Job Value: ¤254,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PRECISION CUSTOM BUILDERS OF NORTH FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7755 S. US HWY 1 BUNNELL, FL 32110 |
CGC1528576 (Exp: 08/31/2026) | 386-931-4799 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
RICHARD GARY WILSON JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1504 OLD MOODY BLVD BUNNELL, FL 32110 |
UNIT 6 BUNNELL, FL 32110 |
CAC1817645 (Exp: 08/31/2026) | 386-586-6290 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/04/2022 | FINAL APPROVED | KSANDOE |
| Note: 9/27/2022 - PREVIOUS INSPECTION NOTES 09/27/2022: INSPECTION STOPPED - 1). No water on in house. 2). No Energy sheets on site - Could not verify HVAC equipment & breaker size. * Insulation, GFCI, lighting, electrical, smoke alarms, vacuum breakers, door seals, garage door openers, water heater all checked & verified. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/04/2022 | FINAL APPROVED | JHARDING |
| Note: 9/27/2022 - PREVIOUS INSPECTION NOTES Power from house needs to be connected to pep panel. | |||
| BLD - BUILDING FINAL | 09/27/2022 | Disapproved - NO FEE | RSIMS |
| Note: 09/27/2022: INSPECTION STOPPED - 1). No water on in house. 2). No Energy sheets on site - Could not verify HVAC equipment & breaker size. * Insulation, GFCI, lighting, electrical, smoke alarms, vacuum breakers, door seals, garage door openers, water heater all checked & verified. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/27/2022 | Disapproved - NO FEE | JHARDING |
| Note: Power from house needs to be connected to pep panel. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/26/2022 | APPROVED | GBERTOLA |
| Note: 09/26/22=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - STORMWATER FINAL | 09/26/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 09/26/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/26/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 09/26/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE THE CULVERT PIPE INVERTS ARE OUT OF TOLERANCE FROM SWALE DIAGRAM. ......................................................................................................................................................................................................................................... 9/22/2022 - PREVIOUS INSPECTION NOTES THE CULVERT PIPE INVERTS ARE OUT OF TOLERANCE FROM SWALE DIAGRAM | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/26/2022 | APPROVED | GBERTOLA |
| Note: 09/26/22= WASN'T UPLOAD THE NEW FINAL SURVEY IN THE SYSTEM I RELOAD THE SYSTEM, REMOVING THE FEES 9/26/2022 - PREVIOUS INSPECTION NOTES 09/26/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE THE CULVERT PIPE INVERTS ARE OUT OF TOLERANCE FROM SWALE DIAGRAM. ......................................................................................................................................................................................................................................... 9/22/2022 - PREVIOUS INSPECTION NOTES THE CULVERT PIPE INVERTS ARE OUT OF TOLERANCE FROM SWALE DIAGRAM | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/22/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: THIS INSPECTION IS PUT ON BY US AS INSPECTOR THE FINAL SURVEY NEEDS TO PASS BEFORE THIS IS PUT UP FOR INSPECTION | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/22/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE CULVERT PIPE INVERTS ARE OUT OF TOLERANCE FROM SWALE DIAGRAM | |||
| TUB SET | 09/22/2022 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 07/27/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:34 am | |||
| GRAVITY SEWER TEST | 07/25/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 07/25/2022 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 07/25/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/25/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK CULVERT PIPE ELEVATION BEFORE POURING CONCRETE FOR THE DRIVEWAY | |||
| PEP TANK INSTALLATION REQUEST | 07/14/2022 | APPROVED | CSTONE |
| INSULATION | 07/05/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2420 Fill concrete floor cut out in kitchen. Seal Mirowave exhaust pipe completely. Rear french doors need a moisture barrier install at head where it hits the CMU. Adding a Tub set inspection. 7/1/22 Wood bearing separation wall in garage needs to be sealed all the way around. Fill concrete floor cut out in kitchen Rear french doors need moisture barrier | |||
| INSULATION | 07/01/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Inspector Notes from Inspection 2420 Fill concrete floor cut out in kitchen. Seal Mirowave exhaust pipe completely. Rear french doors need a moisture barrier install at head where it hits the CMU. Adding a Tub set inspection. 7/1/22 Wood bearing separation wall in garage needs to be sealed all the way around. Fill concrete floor cut out in kitchen Rear french doors need moisture barrier | |||
| LATH/BRICK/ WATER BARRIER | 07/01/2022 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 Fill concrete floor cut out in kitchen. Seal Mirowave exhaust pipe completely. Rear french doors need a moisture barrier install at head where it hits the CMU. Adding a Tub set inspection. | |||
| ALL ROUGH | 06/21/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Fill concrete floor cut out in kitchen. Seal Mirowave exhaust pipe completely. Rear french doors need a moisture barrier install at head where it hits the CMU. Adding a Tub set inspection. | |||
| ROOF VALLEY & METAL | 05/19/2022 | APPROVED | JWALKER |
| WALL SHEATHING | 05/11/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/11/2022 | APPROVED - AS NOTED | JWALKER |
| Note: 1) The garage bearing wall is not sitting at the footing area. Appears the concrete layout may have been off. Have engineer submitt a letter to the building department stating the location of the wall is acceptable. 2) Install missing achor bolts at garage bearing wall and tighten all nuts. Marked with black marker on bottom plate for missed anchor locations. 3) Install blocking between the trusses at the right side of the front entry to carring the kneewall and install hold anchors. The HU26 buckets have not been installed at truss location H11A to carry EJ trusses. | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/10/2022 | APPROVED | AMOBLEY |
| TIE BEAM / LINTEL | 04/07/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Down rods at front entry where the block wall step up have been pieced together and not tied continous. Down rods are to have a 90 degree hook and are to be continous from top of wall to bottom down cell. Overlapping is to be 25" minium. CHECK ALL. Several areas down rods not tied to down cells. Check all. Lintels steel has been installed. 4/5/22 (3) corner areas at the front entry have not been properly corrected. Pieces have been dropped and tied in place. The down rod is to run continuous from top of wall to down cell. Any laps are to be a minimum of 25"s and tied together. The 3 arears are marked on the print in blue ink. FBR-608.7.2.2.3 Seventh edition. | |||
| TIE BEAM / LINTEL | 04/05/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION Down rods at front entry where the block wall step up have been pieced together and not tied continous. Down rods are to have a 90 degree hook and are to be continous from top of wall to bottom down cell. Overlapping is to be 25" minium. CHECK ALL. Several areas down rods not tied to down cells. Check all. Lintels steel has been installed. 4/5/22 (3) corner areas at the front entry have not been properly corrected. Pieces have been dropped and tied in place. The down rod is to run continuous from top of wall to down cell. Any laps are to be a minimum of 25"s and tied together. The 3 arears are marked on the print in blue ink. FBR-608.7.2.2.3 Seventh edition. | |||
| TIE BEAM / LINTEL | 04/04/2022 | Disapproved - NO FEE | JWALKER |
| Note: Down rods at front entry where the block wall step up have been pieced together and not tied continous. Down rods are to have a 90 degree hook and are to be continous from top of wall to bottom down cell. Overlapping is to be 25" minium. CHECK ALL. Several areas down rods not tied to down cells. Check all. Lintels steel has been installed. | |||
| ELECTRIC TEMP POLE | 02/24/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:45 am | |||
| MONOLITHIC SLAB | 02/22/2022 | APPROVED | RMARTIN |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/14/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/08/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 2/7/2022 8:57:05 AM lot not cleared | |||
| WATER METER INSTALLATION REQUEST | 02/01/2022 | Disapproved - NO FEE | CSTONE |
| Note: lot not cleared | |||
| WILDLIFE CHECK - ENVIRONMENTAL | 01/04/2022 | APPROVED | JMYERS |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/10/2022 | 05/10/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/10/2022 | 05/10/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/13/2022 | 01/13/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/13/2022 | 01/14/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/13/2022 | 01/13/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/13/2022 | 01/20/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/13/2022 | 02/17/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/29/2021 | 12/29/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/22/2021 | 12/22/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/22/2021 | 12/29/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 12/22/2021 | 12/22/2021 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2017 NEC-Electrical PLAN REVIEW COMMENTS: 1. Provide electrical load calculations | |||
| ENGIN1 | HOLD | 12/22/2021 | 12/27/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey | |||
| LOCATE | COMPLETE | 12/22/2021 | 12/27/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/22/2021 | 12/22/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Energy calculations for heating and cooling loads do not comply with the directional orientation of the buiding as reflected on windows orientation and site plan per FBC- Energy conservation 7th Ed. Sec. R403.7.1. | |||
| SW1 | COMPLETE | 12/22/2021 | 12/28/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/22/2021 | 12/22/2021 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Floor plan is missing the Square footage of home. | |||
| PLENV | COMPLETE | 12/22/2021 | 01/04/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 1/4/22 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/26/2022 |
| CONNECTION FEES | ¤1,077.88 | 01/27/2022 |
| CONNECTION FEES | (¤1,077.88) | 01/27/2022 |
| CONNECTION FEES | ¤1,077.88 | 01/27/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 01/27/2022 |
| 3% FIRE IMPACT FEE CREDIT | ¤11.66 | 01/27/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 01/27/2022 |
| IMPACT FEE FIRE | (¤388.65) | 01/27/2022 |
| IMPACT FEE FIRE | ¤388.65 | 01/27/2022 |
| IMPACT FEE FIRE | ¤388.65 | 01/27/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 01/27/2022 |
| IMPACT FEE PARKS | (¤1,455.13) | 01/27/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 01/27/2022 |
| IMPACT FEE SCHOOL | (¤3,600.00) | 01/27/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/27/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/27/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/27/2022 |
| WATER -IRRIGATION INSPECTION | (¤25.00) | 01/27/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/27/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 01/27/2022 |
| 3% PARKS IMPACT FEE CREDIT | ¤43.65 | 01/27/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 01/27/2022 |
| SURCHARGE FS 533.721 | (¤11.33) | 01/27/2022 |
| SURCHARGE FS 533.721 | ¤11.33 | 01/27/2022 |
| SURCHARGE FS 533.721 | ¤11.33 | 01/27/2022 |
| SURCHARGE - FS 468.631 | ¤17.00 | 01/27/2022 |
| SURCHARGE - FS 468.631 | (¤17.00) | 01/27/2022 |
| SURCHARGE - FS 468.631 | ¤17.00 | 01/27/2022 |
| SW ENG - FOUNDATION SURVEY | (¤20.00) | 01/27/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/27/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/27/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/27/2022 |
| SW ENG INSPECTION 80 | (¤80.00) | 01/27/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/27/2022 |
| SW ENG PRE APRON | (¤30.00) | 01/27/2022 |
| SW ENG PRE APRON | ¤30.00 | 01/27/2022 |
| SW ENG PRE APRON | ¤30.00 | 01/27/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/27/2022 |
| SW ENG - REVIEW 20 | (¤20.00) | 01/27/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/27/2022 |
| SW ENG RES REVIEW 200 | (¤200.00) | 01/27/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/27/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/27/2022 |
| TRANSPORTATION IMPACT FEE | ¤1,718.00 | 01/27/2022 |
| TRANSPORTATION IMPACT FEE | (¤1,718.00) | 01/27/2022 |
| TRANSPORTATION IMPACT FEE | ¤1,718.00 | 01/27/2022 |
| 3% TRANS IMPACT FEE CREDIT | ¤51.54 | 01/27/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 01/27/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤51.54) | 01/27/2022 |
| SEWER CREDIT | (¤850.00) | 01/27/2022 |
| SEWER CREDIT | ¤850.00 | 01/27/2022 |
| SEWER CREDIT | (¤850.00) | 01/27/2022 |
| SEWER INSPECTION | ¤25.00 | 01/27/2022 |
| SEWER INSPECTION | (¤25.00) | 01/27/2022 |
| SEWER INSPECTION | ¤25.00 | 01/27/2022 |
| SEWER CAPITAL FACILITY | (¤4,939.76) | 01/27/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 01/27/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 01/27/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 01/27/2022 |
| WATER CAPITAL FACILITY FEE | (¤3,626.50) | 01/27/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 01/27/2022 |
| SITE PLAN 30 | ¤30.00 | 01/27/2022 |
| SITE PLAN 30 | (¤30.00) | 01/27/2022 |
| SITE PLAN 30 | ¤30.00 | 01/27/2022 |
| METER - DEPOSIT | ¤60.00 | 01/27/2022 |
| METER - DEPOSIT | (¤60.00) | 01/27/2022 |
| METER - DEPOSIT | ¤60.00 | 01/27/2022 |
| WATER- TURN ON | (¤25.00) | 01/27/2022 |
| WATER- TURN ON | ¤25.00 | 01/27/2022 |
| WATER- TURN ON | ¤25.00 | 01/27/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/27/2022 |
| ADMINISTRATIVE RESIDENTIAL | (¤30.00) | 01/27/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/27/2022 |
| INSPECTION - RESIDENTIAL | (¤814.00) | 01/27/2022 |
| INSPECTION - RESIDENTIAL | ¤814.00 | 01/27/2022 |
| INSPECTION - RESIDENTIAL | ¤814.00 | 01/27/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤230.88 | 01/27/2022 |
| PLAN REVIEW - RESIDENTIAL | (¤230.88) | 01/27/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤230.88 | 01/27/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,507.28 |