I want to search for...

Permit #2021121049

Permit Details

Status: COED

Parcel Id: 29-10-31-5540-00000-1300
CONDITIONED SPACE: 2840 sqft
GARAGE: 796 sqft
PATIO/DECK (NO ROOF) : 452 sqft
CONDITIONED SPACE: 133 sqft
Total Square Footage: 4221 sqft
Block: 00000
Subdivision: 1005 - SANCTUARY SUBDIVISION
Job Phone: 386-445-2012
Location Address: 5 SABAL BEND
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/28/2022
NOC: RECORDED
Applicant name: JOHN NICHOLAS CORDASCI
Owner: MATVEY & HELEN VIAZMENSKY

Address

84 THOMPSON ROAD

AVON , CT 06011

Lot: 1300
Contracted Stated Job Value: ¤652,010.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SKYWAY BUILDERS INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 354786

PALM COAST, FL 32135

CBC1263769 (Exp: 08/31/2024) 386-445-2012

Sub Contractors

MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/11/2023 FINAL APPROVED AGAETANO
Note: 5/10/2023 - PREVIOUS INSPECTION NOTES 5/9/2023 - PREVIOUS INSPECTION NOTES 05-10-2023 1. Energy calcs do not match AHU unit. Please revise to the building department and have on site for inspection. 2. Lights not installed in dining and hallway. 3. AHU platform not sealed on left side. 4. Fresh air intake trim not installed.
BLD - BUILDING FINAL 05/10/2023 Disapproved - NO FEE AGAETANO
Note: 5/9/2023 - PREVIOUS INSPECTION NOTES 05-10-2023 1. Energy calcs do not match AHU unit. Please revise to the building department and have on site for inspection. 2. Lights not installed in dining and hallway. 3. AHU platform not sealed on left side. 4. Fresh air intake trim not installed.
BLD - BUILDING FINAL 05/09/2023 CANCELLED BY APPLICANT AGAETANO
U-CROSS CONNECTION 05/08/2023 APPROVED DHANEY
Note: 5/5/2023 - PREVIOUS INSPECTION NOTES Can not have a well system and Irrigation meter at same property - [need to pick one] .
U -UTILITY RESIDENTIAL FINAL 05/08/2023 FINAL APPROVED DHANEY
U-CROSS CONNECTION 05/05/2023 Disapproved - NO FEE DHANEY
Note: Can not have a well system and Irrigation meter at same property - [need to pick one] .
U - SEWER TIE IN 05/05/2023 APPROVED - AS NOTED AGAETANO
Note: 05-05-2023 Mark Gibson has video of the Tie in. Plumbers on site today.
GRAVITY SEWER TEST 05/05/2023 APPROVED - AS NOTED AGAETANO
Note: 05-05-2023 Mark Gibson has video of the gravity test. Plumbers on site today and uncovered the connections.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/04/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW FIELD SURVEY /GRADING CERTIFICATION 05/04/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - STORMWATER FINAL 05/04/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - FINAL APRON (AFTER POUR) 05/04/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- PRE-APRON (PRE-POUR) 03/15/2023 APPROVED PFLANAGAN
Note: READY FOR PAVERS ---------------------------------------------------------------------- 3/1/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID
ELECTRIC - EARLY POWER 03/03/2023 APPROVED TSTAUFFACHER
ELECTRIC - EARLY POWER 03/03/2023 APPROVED - AS NOTED TSTAUFFACHER
Note: Approved-03/03/2023- release to FPL at 10:44 AM
ROW- PAVER RESTRAINTS 03/01/2023 APPROVED PFLANAGAN
Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID
ROW- PRE-APRON (PRE-POUR) 03/01/2023 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID
INSULATION 12/01/2022 APPROVED AGAETANO
LATH/BRICK/ WATER BARRIER 11/15/2022 APPROVED AGAETANO
ALL ROUGH 11/09/2022 APPROVED AGAETANO
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 NEED DETAIL SHOWING PLACEMENT AND ATTACHMENT OF LEDGER BOARD IN GARAGE, NEED REVISION SHOWING STRAP CHANGE IN GARAGE BEARING WALL DETAIL BY ALL ROUGH
WINDOW NAILING 11/09/2022 APPROVED AGAETANO
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES 09-15-2022 Windows and back SGD frame approved. Three entry doors need to be installed. Ledger and garage wall straps revision approved and on site.
ELECTRIC-TUG 11/04/2022 APPROVED RMARTIN
Note: THIS IS A REINSPECTION
WINDOW NAILING 09/15/2022 PARTIALLY APPROVED AGAETANO
Note: 09-15-2022 Windows and back SGD frame approved. Three entry doors need to be installed. Ledger and garage wall straps revision approved and on site.
ALL ROUGH 09/15/2022 CANCELLED BY APPLICANT AGAETANO
Note: Inspector Notes from Inspection 2460 NEED DETAIL SHOWING PLACEMENT AND ATTACHMENT OF LEDGER BOARD IN GARAGE, NEED REVISION SHOWING STRAP CHANGE IN GARAGE BEARING WALL DETAIL BY ALL ROUGH
ELECTRIC-TUG 08/16/2022 CANCELLED BY APPLICANT RMARTIN
WALL SHEATHING 07/26/2022 APPROVED RMARTIN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/26/2022 APPROVED - AS NOTED RMARTIN
Note: NEED DETAIL SHOWING PLACEMENT AND ATTACHMENT OF LEDGER BOARD IN GARAGE, NEED REVISION SHOWING STRAP CHANGE IN GARAGE BEARING WALL DETAIL BY ALL ROUGH
ROOF VALLEY & METAL 07/26/2022 APPROVED RMARTIN
TIE BEAM / LINTEL 05/31/2022 APPROVED LMILLER
FOUND SURVEY APPROVED (OFFICE) 04/29/2022 APPROVED CGONCALVES
MONOLITHIC SLAB 03/25/2022 APPROVED LMILLER
PLUMBING 1ST ROUGH UNDERGROUND 03/23/2022 APPROVED AGAETANO
WATER METER INSTALLATION REQUEST 02/08/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 05/11/2023 05/11/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 05/01/2023 05/01/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 08/10/2022 08/15/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 04/29/2022 04/29/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/29/2022 04/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 04/22/2022 04/22/2022
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM The Easement Encroachment Agreements are only used for the typical 5' utility easement platted on the scattered Palm Coast lots. This is a special platted 20' drainage easement which does not allow for encroachment. Please reduce the size of the pad to remove it from the easement.
ENGIN1 COMPLETE 04/18/2022 04/19/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 04/18/2022 04/18/2022
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM The mechanical equipment pad in the platted 10' easement on the left side must be removed.
MECH COMPLETE 01/10/2022 01/10/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 01/03/2022 01/07/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: Repeat Comment 1. Orientation of Energy calculations does not match the site plan. Energy Forms show the orientation as East. Load calculations show the orientation as West.
BLD COMPLETE 01/03/2022 01/07/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 12/27/2021 12/28/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: Product Approval Specification Sheet; 1. Provide product approval number for the proposed sliding glass door. No product approval submitted. 2. Product approval submitted for the garage door is a non-impact rated door and does not meet the required design pressures. 3. Product approval for the proposed for mullion is incorrect. Provide product approval for the proposed mullion. 4. Product approval submitted for the skylight is for a non-impact rated window. A correction is required and provide a correct product approval for the proposed skylight. Per F.S. 471.025 and F.A.C. 61 G15-23.0
CUSVC COMPLETE 12/27/2021 01/03/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 12/27/2021 12/28/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/27/2021 12/27/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/27/2021 12/28/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 12/27/2021 12/27/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential – Mechanical REVIEW COMMENTS: Repeat Comment 1. Orientation of Energy calculations does not match the site plan. Revised to match
SW1 COMPLETE 12/27/2021 01/03/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON COMPLETE 12/27/2021 12/27/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 05/11/2023
WATER-METER ¤467.09 05/04/2023
WATER- TURN ON ¤25.00 05/04/2023
METER - DEPOSIT ¤60.00 05/04/2023
PLAN REVIEW - REVISION ¤32.50 05/04/2023
WATER -IRRIGATION INSPECTION ¤25.00 05/04/2023
3% PARKS IMPACT FEE CREDIT (¤43.65) 01/28/2022
SURCHARGE FS 533.721 ¤24.26 01/28/2022
SURCHARGE - FS 468.631 ¤36.39 01/28/2022
SW ENG - FOUNDATION SURVEY ¤20.00 01/28/2022
SW ENG INSPECTION 80 ¤80.00 01/28/2022
SW ENG PRE APRON ¤30.00 01/28/2022
SW ENG - REVIEW 20 ¤20.00 01/28/2022
SW ENG RES REVIEW 200 ¤200.00 01/28/2022
3% TRANS IMPACT FEE CREDIT (¤94.17) 01/28/2022
SEWER INSPECTION ¤25.00 01/28/2022
SEWER CAPITAL FACILITY ¤4,939.76 01/28/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 01/28/2022
SITE PLAN 30 ¤30.00 01/28/2022
METER - DEPOSIT ¤60.00 01/28/2022
WATER-METER ¤467.09 01/28/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/28/2022
INSPECTION - RESIDENTIAL ¤1,795.75 01/28/2022
PLAN REVIEW - RESIDENTIAL ¤509.34 01/28/2022
CONNECTION FEES ¤25.00 01/28/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 01/28/2022
IMPACT FEE FIRE ¤388.65 01/28/2022
IMPACT FEE PARKS ¤1,455.13 01/28/2022
IMPACT FEE SCHOOL ¤3,600.00 01/28/2022
IMPACT FEE TRANSPORTATION ¤3,139.00 01/28/2022
Fees Total Due: ¤0.00 Total Paid: ¤20,994.48