Permit #2021121186

Permit Details

Status: COED

Parcel Id: 07-11-31-7032-00470-0240
CONDITIONED SPACE: 1821 sqft
GARAGE: 478 sqft
OPENED PORCH (WITH ROOF) : 150 sqft
Total Square Footage: 2449 sqft
Block: 00470
Subdivision: 2155 - SECTION 32-ROYAL PALMS
Job Phone: 321-501-4617
Location Address: 62 ROXBORO DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/04/2022
NOC: RECORDED
Applicant name: JAMES FUCETOLA III
Owner: PALM COAST COMMUNITIES LLC A WYOMING

Address

PO BOX 22547

ST SIMMONS ISLAND, GA 31522

Lot: 0240
Contracted Stated Job Value: ¤165,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PALM COAST COMMUNITIES LLC
Status Location Address State License Number Phone
INACTIVE

PO BOX 22547

PALM COAST, FL 32164

CBC1262878 (Exp: 08/31/2026) 321-501-4617

Sub Contractors

JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/10/2023 APPROVED JWALKER
Note: This was a duplicated inspection. The original inspection was approved with notes which were later checked at all rough.
ROW - STORMWATER FINAL 01/06/2023 FINAL APPROVED PFLANAGAN
Note: 1/5/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF CULVERT PIPE ------------------------------------------------------------------------------------------------- 1/4/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT PIPE
BLD - BUILDING FINAL 01/05/2023 FINAL APPROVED JWALKER
Note: Kitchen sink and master bath plumbing will need to have air admitance valves installed due to vents not installed. Check at final
ROW - STORMWATER FINAL 01/05/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF CULVERT PIPE ------------------------------------------------------------------------------------------------- 1/4/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT PIPE
U -UTILITY RESIDENTIAL FINAL 01/04/2023 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 01/04/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT PIPE
ROW - FINAL APRON (AFTER POUR) 01/03/2023 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/03/2023 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 01/03/2023 APPROVED PFLANAGAN
U-CROSS CONNECTION 01/03/2023 APPROVED - AS NOTED LFITZGERALD
Note: has potable irrigation with RPZ installed-no cross connection
U - SEWER TIE IN 11/09/2022 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 10/17/2022 APPROVED JMUNSON
ROW- PRE-APRON (PRE-POUR) 09/14/2022 APPROVED RGROSS
Note: READY TO POUR
INSULATION 08/05/2022 APPROVED JWALKER
Note: The 2 bath fans in the master bathroom, the duct installed is 3" Fan calls for 4" install and support correct ducts
WALL SHEATHING 08/03/2022 APPROVED JWALKER
Note: Inspector Notes from Inspection 2420 The 2 bath fans in the master bathroom, the duct installed is 3" Fan calls for 4" install and support correct ducts Kitchen sink and master bath plumbing will need to have air admitance valves installed due to vents not installed. Check at final
ALL ROUGH 08/03/2022 APPROVED - AS NOTED JWALKER
Note: The 2 bath fans in the master bathroom, the duct installed is 3" Fan calls for 4" install and support correct ducts Kitchen sink and master bath plumbing will need to have air admitance valves installed due to vents not installed. Check at final
ALL ROUGH 08/02/2022 Disapproved - NO FEE JWALKER
Note: Missing nail plate bottom plate water heater supply lines. Nail plate kitchen wall top plate wire. The 2 bath fans in the master bathroom, the duct installed is 3" Fan calls for 4" install and support correct ducts The 14-2 wire at the front entry needs be terminated into an outlet box and grounda tied together Kitchen sink and master bath plumbing will need to have air admitance valves installed due to vents not installed. Check at final
WALL SHEATHING 07/05/2022 CANCELLED BY APPLICANT AWS_IVR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/05/2022 CANCELLED BY APPLICANT AWS_IVR
WALL SHEATHING 06/16/2022 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/16/2022 APPROVED - AS NOTED JWALKER
Note: Rear porch over framing. Where the rigde lands on the of the porch framing land on the Hip roof install blocking due to ridge and truss below not alining up. Install missing H 2.5 hold down anchors top and bottom. Detail on Page 5 of 6
LATH/BRICK/ WATER BARRIER 05/26/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION Only the front of the building has been completed
LATH/BRICK/ WATER BARRIER 05/25/2022 Disapproved - NO FEE JWALKER
Note: Only the front of the building has been completed
ROOF VALLEY & METAL 05/18/2022 APPROVED JWALKER
ROOF SHEATHING 05/16/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION Nails are to be spaced 4" o.c. at the edges 6" o.c. in the field. Detail page 5 of 6. Multiple nails have been counter sunk too deep.
ROOF SHEATHING 05/09/2022 Disapproved - NO FEE JWALKER
Note: Nails are to be spaced 4" o.c. at the edges 6" o.c. in the field. Detail page 5 of 6. Multiple nails have been counter sunk too deep.
TIE BEAM / LINTEL 05/03/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION The lintel above the garage door opening requires 2 # 5 rebar in the lintel. Detail page 5 of 6
TIE BEAM / LINTEL 05/02/2022 Disapproved - NO FEE JWALKER
Note: The lintel above the garage door opening requires 2 # 5 rebar in the lintel. Detail page 5 of 6
FOUND SURVEY APPROVED (OFFICE) 04/21/2022 APPROVED TBAKER
MONOLITHIC SLAB 04/12/2022 APPROVED JWALKER
PLUMBING 1ST ROUGH UNDERGROUND 04/05/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 04/05/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 03/08/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 2/25/2022 8:17:31 AM lot not cleared
WATER METER INSTALLATION REQUEST 02/23/2022 Disapproved - NO FEE CSTONE
Note: lot not cleared

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 04/21/2022 04/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/21/2022 04/21/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 02/02/2022 02/02/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Floor plan still Missing: Please provide a floor plan
SWALE COMPLETE 01/03/2022 02/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 12/30/2021 12/30/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 12/30/2021 01/05/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 12/30/2021 12/30/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/30/2021 01/03/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/30/2021 01/03/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 12/30/2021 12/30/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SW1 COMPLETE 12/30/2021 01/07/2022
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 12/30/2021 12/30/2021
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Floor plan Missing: Please provide a floor plan Boundary sourvey map panel number does not match 0120E please correct

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 01/09/2023
SW ENG REINSPECTION 20 ¤20.00 01/09/2023
SW ENG - REVIEW 20 ¤20.00 02/04/2022
SW ENG RES REVIEW 200 ¤200.00 02/04/2022
TRANSPORTATION IMPACT FEE ¤1,718.00 02/04/2022
3% TRANS IMPACT FEE CREDIT (¤51.54) 02/04/2022
SEWER CREDIT (¤1,147.00) 02/04/2022
SEWER INSPECTION ¤25.00 02/04/2022
SEWER CAPITAL FACILITY ¤4,939.76 02/04/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 02/04/2022
SITE PLAN 30 ¤30.00 02/04/2022
METER - DEPOSIT ¤60.00 02/04/2022
WATER- TURN ON ¤25.00 02/04/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/04/2022
INSPECTION - RESIDENTIAL ¤627.00 02/04/2022
PLAN REVIEW - RESIDENTIAL ¤177.84 02/04/2022
CONNECTION FEES ¤1,077.88 02/04/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 02/04/2022
IMPACT FEE FIRE ¤388.65 02/04/2022
IMPACT FEE PARKS ¤1,455.13 02/04/2022
IMPACT FEE SCHOOL ¤3,600.00 02/04/2022
WATER -IRRIGATION INSPECTION ¤25.00 02/04/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 02/04/2022
SURCHARGE FS 533.721 ¤8.87 02/04/2022
SURCHARGE - FS 468.631 ¤13.31 02/04/2022
SW ENG - FOUNDATION SURVEY ¤20.00 02/04/2022
SW ENG INSPECTION 80 ¤80.00 02/04/2022
SW ENG PRE APRON ¤30.00 02/04/2022
Fees Total Due: ¤0.00 Total Paid: ¤16,964.09