I want to search for...

Permit #2022010015

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7017-00050-0560
Block: 00050
Subdivision: 2129 - SECTION 17-BELLE TERRE
Job Phone: 386-793-6919
Location Address: 27 BOXWOOD LN
Type: DR - DRIVEWAY
Issue Date: 08/01/2022
NOC: RECORDED
Applicant name: BRIAN A RUTHERFORD
Owner: CLARK MARIANNE S

Address

27 BOXWOOD LANE

PALM COAST, FL 32137

Lot: 0560
Contracted Stated Job Value: ¤11,275.00
Job Description: REPLACE EXISTING CONCRETE DRIVEWAY AND WALKWAY WITH PAVERS
Type: CN

Contractor

CREATIVE TOUCH CONCRETE SURFACING, LLC
Status Location Address Phone
ACTIVE

1 CARDWELL COURT

PALM COAST, FL 32137

386-793-6919

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 01/19/2024 APPROVED TPOLACEK
Note: 01/19/24 HOT PATCH CORRECTED, PAVERS ARE SET. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES 07/28/23 ASPHALT PATCH SPREADS AND IS NOT SOLIDLY ADHERED. CRUMBLING AWAY WHEN ITIS SCUFFED OR PROBED. PLEASE SEE PHOTO FOR REFERENCE. POSSIBLY LAID HOT ON COLD PATCH. NOT CORRECTED. THIS IS THE LAST TIME IT WILL BE FAILED WITH NO FEE.. _______________________________________________________________________________________________________________________ 7/26/2023 - PREVIOUS INSPECTION NOTES 726/23= . NEED TO REMOVE THE COLD PATCH AND INSTALL HOT PATCH THE ROAD REPAIR ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT.PICTURE ATTACHED
ROW - FINAL INSPECTION 07/28/2023 Disapproved - NO FEE FSLADISH
Note: 07/28/23 ASPHALT PATCH SPREADS AND IS NOT SOLIDLY ADHERED. CRUMBLING AWAY WHEN ITIS SCUFFED OR PROBED. PLEASE SEE PHOTO FOR REFERENCE. POSSIBLY LAID HOT ON COLD PATCH. NOT CORRECTED. THIS IS THE LAST TIME IT WILL BE FAILED WITH NO FEE.. _______________________________________________________________________________________________________________________ 7/26/2023 - PREVIOUS INSPECTION NOTES 726/23= . NEED TO REMOVE THE COLD PATCH AND INSTALL HOT PATCH THE ROAD REPAIR ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT.PICTURE ATTACHED
ROW - FINAL INSPECTION 07/26/2023 Disapproved - NO FEE GBERTOLA
Note: 726/23= . NEED TO REMOVE THE COLD PATCH AND INSTALL HOT PATCH THE ROAD REPAIR ALONG THE FULL WIDTH OF THE DRIVEWAY AND ANY OTHER ROAD DAMAGE WITH HOT PATCH ASPHALT.PICTURE ATTACHED
U -UTILITY RESIDENTIAL FINAL 07/26/2023 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 01/31/2023 APPROVED PFLANAGAN
ROW- PRE-APRON (PRE-POUR) 08/05/2022 APPROVED - AS NOTED EMADISON
Note: Inspector Notes from Inspection 9271 ** 08/05/22 PAVER BASE SPREAD GOOD COMPACTION READY TO SET PAVERS ** 08/03/22 PAVER RERSTRAINTS READY TO POUR
ROW- PAVER RESTRAINTS 08/03/2022 APPROVED - AS NOTED EMADISON
Note: ** 08/03/22 PAVER RERSTRAINTS READY TO POUR
ROW- PRE-APRON (PRE-POUR) 08/03/2022 PARTIALLY APPROVED EMADISON
Note: ** 08/03/22 APRON AND PAVER RESTRAINTS ARE READY TO POUR ** SCHEDULE NEXT PRE-APRON (PRE-POUR) INSPECTION WHEN PAVER BASE IS SPREAD AND COMPACTED

Review History

Department Status Date In Date Out
ZON COMPLETE 03/09/2022 03/09/2022
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM
ZON HOLD 01/27/2022 01/27/2022
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM The electronic ROW agreement looks good. Please provide the original ROW agreement to complete this review.
ZON HOLD 01/12/2022 01/12/2022
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Submit an electronic completed Right of Way Agreement for review.
ENGIN1 COMPLETE 01/03/2022 01/06/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 01/03/2022 01/07/2022
Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM
ZON HOLD 01/03/2022 01/03/2022
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Provide the width of the walkway on the site plan. Change from concrete to pavers driveway and walkway on the site plan. Submit an electronic completed Right of Way Agreement.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/01/2022
RECORDING FEE REIMBURSE DOC ¤44.00 08/01/2022
SW ENG INSPECTION 40 ¤40.00 08/01/2022
SW ENG PRE APRON ¤30.00 08/01/2022
SW ENG RES REVIEW 200 ¤200.00 08/01/2022
SITE PLAN 15 ¤15.00 08/01/2022
Fees Total Due: ¤0.00 Total Paid: ¤359.00