Permit #2022010106
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01290-0110 |
| CONDITIONED SPACE: 1915 sqft |
| GARAGE: 585 sqft |
| OPENED PORCH (WITH ROOF) : 306 sqft |
| OPENED PORCH (WITH ROOF) : 45 sqft |
| Total Square Footage: 2851 sqft |
| Block: 01290 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-447-7007 |
| Location Address: 67 EDWARD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/11/2022 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: DENONCOURT, HENRY & IRENE |
|
Address 606 HOLLOWS CIRCLE DEERFIELD BEACH, FL 33442 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤314,400.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
VICTOR ANTONIO SANCHEZ AREVALO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
9076 EMMA JEAN CT JACKSONVILLE, FL 32211 |
RC29027842 (Exp: 08/31/2025) | 904-982-1504 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
BRIAN WOOD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2439 HYATT CREEK LANE , 0 |
CAC1821021 (Exp: 08/31/2026) | 386-282-1224 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/21/2024 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 10/08/2024 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: 10/08/24 Disapproved ( C Van-Strahlen ) #1 AC Unit and Heating Unit do not match documents , Brand and model number need corrct E-Calls | |||
| ROW - FINAL APRON (AFTER POUR) | 09/25/2024 | APPROVED | FSLADISH |
| Note: 9/25/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 09/25/2024 | APPROVED | FSLADISH |
| Note: 9/25/24 AT THE TIME OF THIS THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/24/2024 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 9/20/2024 11:04:05 AM *** builder went with Saint Aug sod and therefore had to install irrigation *** NOTES ADDED BY LFITZGERALD 9/20/2024 11:03:17 AM *** has potable irrigation with PVB-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 09/20/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/20/2024 11:00:46 AM *** gutter down spout right up against pep panel-can not access Inspector Notes from Inspection 9035 No IRR | |||
| ROW - STORMWATER FINAL | 09/20/2024 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 09/20/2024 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 09/20/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/20/2024 11:04:05 AM *** builder went with Saint Aug sod and therefore had to install irrigation *** NOTES ADDED BY LFITZGERALD 9/20/2024 11:03:17 AM *** has potable irrigation with PVB-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/19/2024 | APPROVED | FSLADISH |
| Note: 9/19/24 Elevation corrections made at the time of this final survey inspection. Culvert pipe flat but in tolerance to swale plan diagram. ______________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 Drainage from the structure Sec 300, Drawing 300.D, Sec 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Roadside swale. Sec.300.01 C1 Sec.300.01 C1 The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1 3 Roadside swale. Sec.300.01 C2 Sec.300.01 C2 The tolerance on individual shots along the as-built flow line of the swale (depressions orhigh spots) is plus or minus 0.10 feet.Sec.300.01 C2 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/19/2024 | APPROVED | FSLADISH |
| Note: 9/19/24 UPON WALKING PROPERTY DETERMINED DRAINAGE REFLECTS SURVEY. | |||
| ROW- PROJECT STATUS | 09/16/2024 | APPROVED | PFLANAGAN |
| Note: Met with grade guy and told them that the survey needs to reflect was is in the field. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/10/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 9/10/24 Drainage from the structure Sec 300, Drawing 300.D, Sec 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Roadside swale. Sec.300.01 C1 Sec.300.01 C1 The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1 3 Roadside swale. Sec.300.01 C2 Sec.300.01 C2 The tolerance on individual shots along the as-built flow line of the swale (depressions orhigh spots) is plus or minus 0.10 feet.Sec.300.01 C2 | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/29/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE LEFT INVERT ON THE CULVERT PIPE IS STILL OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL ON THE FINAL SURVEY. I DID GO OUT AND SHOT THE ELEVATIONS ON THE CULVERT MY SELF AND THEY ARE IN TOLERANCE. IT'S THE SURVEYORS JOB TO COLLECT ALL ELEVSTIONS ACCURATELY TO ENSURE THAT THE FINAL SURVEY MEETS CITY CODE. ----------------------------------------------------------------------------------- 8/19/2024 - PREVIOUS INSPECTION NOTES 1) THE FINAL SURVEY STATES THAT LEFT INVERT ON THE CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE PLAN DETAIL THAT WAS PROVIDED. 2) THE FINAL SURVEY STATES THAT YOU DONT HAVE POSITIVE FALL TO THE FRONT ROADSIDE SWALE ON BOTH DRAINAGE PATTERNS ON THE SIDES. 3) YOU STILL DONT HAVE 10' OFF SETS IN THE LOTS BEHIND THIS LOT THESE ELEVATION TELL IS IF THE WATER WILL IMPACT THE ADJACENT LOTS. 4) THE RIGHT OF WAY LINE OR THE FRONT PROPERTY LINE IS LOWER THAN THE EDGE OF PAVEMENT. 5) THE FRONT, RIGHT AND THE BACK ELEVATIONS ARE TO FAR FROM THE HOUSE NEED TO HAVE A MINIMUM OF 4 ELEVATIONS AGAINST THE STRUCTURE AT EACH CORNER SO WE CAN TELL IF THE SOD ELEVATION IS THE 4" BELOW THE FFE. ---------------------------------------------------------------------- 8/6/2024 - PREVIOUS INSPECTION NOTES 1) ON THE ADJACENT LOT TO THE RIGHT LOT 12 NEED TO HAVE 10' OFF THE PROPOERTY LINE ELEVATIONS SO WE CAN DETERMINE IF THE WATER WILL FLOW ON THE ADJACENT LOT. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. 2) THERE IS NO CENTERLINE ELEVATIONS ON THE FINAL SURVEY 3) THERE IS NO INVERT ELEVATIONS FOR THE CULVERT PIPE FOR THE DRIVEWAY 4) THE DRAINAGE IN THE BACK THE TOP OF BANK IS TO FAR FROM THE BACK PROPOERTY LINE 5) THE BACK RIGHT CORNER WATER CAN NOT MAKE IT TO THE FRONT ROAD SIDE SWALE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/15/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) THE FINAL SURVEY STATES THAT LEFT INVERT ON THE CULVERT PIPE IS OUT OF TOLERANCE FROM THE SWALE PLAN DETAIL THAT WAS PROVIDED. 2) THE FINAL SURVEY STATES THAT YOU DONT HAVE POSITIVE FALL TO THE FRONT ROADSIDE SWALE ON BOTH DRAINAGE PATTERNS ON THE SIDES. 3) YOU STILL DONT HAVE 10' OFF SETS IN THE LOTS BEHIND THIS LOT THESE ELEVATION TELL IS IF THE WATER WILL IMPACT THE ADJACENT LOTS. 4) THE RIGHT OF WAY LINE OR THE FRONT PROPERTY LINE IS LOWER THAN THE EDGE OF PAVEMENT. 5) THE FRONT, RIGHT AND THE BACK ELEVATIONS ARE TO FAR FROM THE HOUSE NEED TO HAVE A MINIMUM OF 4 ELEVATIONS AGAINST THE STRUCTURE AT EACH CORNER SO WE CAN TELL IF THE SOD ELEVATION IS THE 4" BELOW THE FFE. ---------------------------------------------------------------------- 8/6/2024 - PREVIOUS INSPECTION NOTES 1) ON THE ADJACENT LOT TO THE RIGHT LOT 12 NEED TO HAVE 10' OFF THE PROPOERTY LINE ELEVATIONS SO WE CAN DETERMINE IF THE WATER WILL FLOW ON THE ADJACENT LOT. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. 2) THERE IS NO CENTERLINE ELEVATIONS ON THE FINAL SURVEY 3) THERE IS NO INVERT ELEVATIONS FOR THE CULVERT PIPE FOR THE DRIVEWAY 4) THE DRAINAGE IN THE BACK THE TOP OF BANK IS TO FAR FROM THE BACK PROPOERTY LINE 5) THE BACK RIGHT CORNER WATER CAN NOT MAKE IT TO THE FRONT ROAD SIDE SWALE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. | |||
| ROW- PROJECT STATUS | 08/08/2024 | APPROVED | PFLANAGAN |
| Note: MET WITH GRADER ABOUT FINAL SURVEY RESULTS | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/06/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) ON THE ADJACENT LOT TO THE RIGHT LOT 12 NEED TO HAVE 10' OFF THE PROPOERTY LINE ELEVATIONS SO WE CAN DETERMINE IF THE WATER WILL FLOW ON THE ADJACENT LOT. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. 2) THERE IS NO CENTERLINE ELEVATIONS ON THE FINAL SURVEY 3) THERE IS NO INVERT ELEVATIONS FOR THE CULVERT PIPE FOR THE DRIVEWAY 4) THE DRAINAGE IN THE BACK THE TOP OF BANK IS TO FAR FROM THE BACK PROPOERTY LINE 5) THE BACK RIGHT CORNER WATER CAN NOT MAKE IT TO THE FRONT ROAD SIDE SWALE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/08/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. ----------------------------------------------------------------------------------------- 7/3/2024 - PREVIOUS INSPECTION NOTES THERE WAS SOMEONE OUT AT THIS JOB SITE TRYING TO FIX THE ISSUES. HE KNOWS WHAT NEEDS TO BE FIXED. IT IS THE BUILDERS RESPONSIBILITY TO MAKE SURE THAT THIS IS READY FOR INSPECTION BEFORE CALLING THE INSPECTION IN. ------------------------------------------------------------------------------------------ 7/2/2024 - PREVIOUS INSPECTION NOTES 1) THE MITER END FLAIRS ARE NOT FORMED CORRECTLY PLEASE SEE DRAWING #300.E IN TECH. MANUAL. 2) THERE ARE AREAS IN THE POURING ARE THAT YOU DO NOT HAVE THE RIGHT AMOUNT OF CONCRETE. Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material or five inches (5"). Sec 400.02 Sidewalks and driveways constructed above the right of way within the City of Palm Coast shall be a minimum of 4" thick concrete. 3) BOTH MITER END FOOTERS NEED TO BE A MINIMUM OF 6"X6" ALSO SEE DRAWING #300.E 4) THERE IS TO MUCH OF ASPHALT IN THE APRON NEED REMOVE ALL ASPHALT. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/03/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THERE WAS SOMEONE OUT AT THIS JOB SITE TRYING TO FIX THE ISSUES. HE KNOWS WHAT NEEDS TO BE FIXED. IT IS THE BUILDERS RESPONSIBILITY TO MAKE SURE THAT THIS IS READY FOR INSPECTION BEFORE CALLING THE INSPECTION IN. ------------------------------------------------------------------------------------------ 7/2/2024 - PREVIOUS INSPECTION NOTES 1) THE MITER END FLAIRS ARE NOT FORMED CORRECTLY PLEASE SEE DRAWING #300.E IN TECH. MANUAL. 2) THERE ARE AREAS IN THE POURING ARE THAT YOU DO NOT HAVE THE RIGHT AMOUNT OF CONCRETE. Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material or five inches (5"). Sec 400.02 Sidewalks and driveways constructed above the right of way within the City of Palm Coast shall be a minimum of 4" thick concrete. 3) BOTH MITER END FOOTERS NEED TO BE A MINIMUM OF 6"X6" ALSO SEE DRAWING #300.E 4) THERE IS TO MUCH OF ASPHALT IN THE APRON NEED REMOVE ALL ASPHALT. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/02/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) THE MITER END FLAIRS ARE NOT FORMED CORRECTLY PLEASE SEE DRAWING #300.E IN TECH. MANUAL. 2) THERE ARE AREAS IN THE POURING ARE THAT YOU DO NOT HAVE THE RIGHT AMOUNT OF CONCRETE. Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material or five inches (5"). Sec 400.02 Sidewalks and driveways constructed above the right of way within the City of Palm Coast shall be a minimum of 4" thick concrete. 3) BOTH MITER END FOOTERS NEED TO BE A MINIMUM OF 6"X6" ALSO SEE DRAWING #300.E 4) THERE IS TO MUCH OF ASPHALT IN THE APRON NEED REMOVE ALL ASPHALT. | |||
| WINDOW NAILING | 06/28/2024 | APPROVED | RSIMS |
| Note: 6/27/2024 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/24/2024 - PREVIOUS INSPECTION NOTES 6/24/24: Please repair your silt fence barrier immediately & you will need to keep it maintained in original condition per FBC 3307.1 to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. (FBC-3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) ___ 6-13-2024 Garage entry door not installed. A window/door nailing will be added to confirm jambs are insulated and door installed correctly. 06-27-2024 Above issue has not been resolved. A window/door nailing will be added to confirm jambs are insulated. | |||
| WINDOW NAILING | 06/27/2024 | Disapproved - NO FEE | AGAETANO |
| Note: New inspection due to canceled inspection 6/24/2024 - PREVIOUS INSPECTION NOTES 6/24/24: Please repair your silt fence barrier immediately & you will need to keep it maintained in original condition per FBC 3307.1 to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. (FBC-3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) ___ 6-13-2024 Garage entry door not installed. A window/door nailing will be added to confirm jambs are insulated and door installed correctly. 06-27-2024 Above issue has not been resolved. A window/door nailing will be added to confirm jambs are insulated. | |||
| WINDOW NAILING | 06/26/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 6/24/2024 - PREVIOUS INSPECTION NOTES 6/24/24: Please repair your silt fence barrier immediately & you will need to keep it maintained in original condition per FBC 3307.1 to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. (FBC-3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) ___ 6-13-2024 Garage entry door not installed. A window/door nailing will be added to confirm jambs are insulated and door installed correctly. | |||
| WINDOW NAILING | 06/24/2024 | Disapproved - NO FEE | RSIMS |
| Note: 6/24/24: Please repair your silt fence barrier immediately & you will need to keep it maintained in original condition per FBC 3307.1 to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. (FBC-3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) ___ 6-13-2024 Garage entry door not installed. A window/door nailing will be added to confirm jambs are insulated and door installed correctly. | |||
| GRAVITY SEWER TEST | 06/20/2024 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 06/20/2024 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR | |||
| U - SEWER TIE IN | 06/20/2024 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 06/13/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 06-13-2024 Garage entry door not installed. A window/door nailing will be added to confirm jambs are insulated and door installed correctly. | |||
| PEP TANK INSTALLATION REQUEST | 05/09/2024 | APPROVED | CBOWERMASTER |
| Note: 4/23/2024 7:23:33 AM- PREVIOUS INSPECTION NOTES exterior/stucco | |||
| INSULATION | 04/29/2024 | APPROVED | RSIMS |
| Note: New inspection due to canceled inspection 4/22/2024 - PREVIOUS INSPECTION NOTES 4/22/24: Previously listed item 4 remians unresolved. Inspector Notes from Inspection 2420 4/9/24: Approved as noted to keep project moving. ALL corrections will need to be completed prior to scheduling next inspection. 1). Dryer exhaust needs to be supported with a metal strap at joint. / Needs to be sealed at all joints of the adjustable elbow / needs a nail plate on the garage side. 2). Kitchen Island: slab needs to be completely repaired level with floor with cement. 3). Back left bedroom window has the incorrect anchor at the bottom left jamb. Needs to be tapcon. 4). Kitchen exhaust duct needs to be sealed at all joints of the adjustable elbow. Also needs 3 screws at each connection. Kitchen Exhaust - M1601.4.1 - Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 5). Portable toilet needs to be serviced. (has not had service since 12/20. 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. 4/5/2024 - PREVIOUS INSPECTION NOTES 4/5/24: Inspexction stopped. Not Ready! * silt fence needs to be completed at rear and right side of the property. * No 5ft head pressure. * Please provide a legible appropriately sized duct layout for inspection. * Please clean up overgrowth around the property (back mostly). 8/21/23: Still need revision for interior load bearing wall as identified on Inspection 2460. Revision must be approved prior to this inspection. Check details at this inspection. 4/22/24: Previously listed item 4 remians unresolved. Inspector Notes from Inspection 2420 4/9/24: Approved as noted to keep project moving. ALL corrections will need to be completed prior to scheduling next inspection. 1). Dryer exhaust needs to be supported with a metal strap at joint. / Needs to be sealed at all joints of the adjustable elbow / needs a nail plate on the garage side. 2). Kitchen Island: slab needs to be completely repaired level with floor with cement. 3). Back left bedroom window has the incorrect anchor at the bottom left jamb. Needs to be tapcon. 4). Kitchen exhaust duct needs to be sealed at all joints of the adjustable elbow. Also needs 3 screws at each connection. Kitchen Exhaust - M1601.4.1 - Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 5). Portable toilet needs to be serviced. (has not had service since 12/20. 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. 4/5/2024 - PREVIOUS INSPECTION NOTES 4/5/24: Inspexction stopped. Not Ready! * silt fence needs to be completed at rear and right side of the property. * No 5ft head pressure. * Please provide a legible appropriately sized duct layout for inspection. * Please clean up overgrowth around the property (back mostly). 8/21/23: Still need revision for interior load bearing wall as identified on Inspection 2460. Revision must be approved prior to this inspection. Check details at this inspection. | |||
| INSULATION | 04/26/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 4/22/2024 - PREVIOUS INSPECTION NOTES 4/22/24: Previously listed item 4 remians unresolved. Inspector Notes from Inspection 2420 4/9/24: Approved as noted to keep project moving. ALL corrections will need to be completed prior to scheduling next inspection. 1). Dryer exhaust needs to be supported with a metal strap at joint. / Needs to be sealed at all joints of the adjustable elbow / needs a nail plate on the garage side. 2). Kitchen Island: slab needs to be completely repaired level with floor with cement. 3). Back left bedroom window has the incorrect anchor at the bottom left jamb. Needs to be tapcon. 4). Kitchen exhaust duct needs to be sealed at all joints of the adjustable elbow. Also needs 3 screws at each connection. Kitchen Exhaust - M1601.4.1 - Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 5). Portable toilet needs to be serviced. (has not had service since 12/20. 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. 4/5/2024 - PREVIOUS INSPECTION NOTES 4/5/24: Inspexction stopped. Not Ready! * silt fence needs to be completed at rear and right side of the property. * No 5ft head pressure. * Please provide a legible appropriately sized duct layout for inspection. * Please clean up overgrowth around the property (back mostly). 8/21/23: Still need revision for interior load bearing wall as identified on Inspection 2460. Revision must be approved prior to this inspection. Check details at this inspection. 4/22/24: Previously listed item 4 remians unresolved. Inspector Notes from Inspection 2420 4/9/24: Approved as noted to keep project moving. ALL corrections will need to be completed prior to scheduling next inspection. 1). Dryer exhaust needs to be supported with a metal strap at joint. / Needs to be sealed at all joints of the adjustable elbow / needs a nail plate on the garage side. 2). Kitchen Island: slab needs to be completely repaired level with floor with cement. 3). Back left bedroom window has the incorrect anchor at the bottom left jamb. Needs to be tapcon. 4). Kitchen exhaust duct needs to be sealed at all joints of the adjustable elbow. Also needs 3 screws at each connection. Kitchen Exhaust - M1601.4.1 - Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 5). Portable toilet needs to be serviced. (has not had service since 12/20. 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. 4/5/2024 - PREVIOUS INSPECTION NOTES 4/5/24: Inspexction stopped. Not Ready! * silt fence needs to be completed at rear and right side of the property. * No 5ft head pressure. * Please provide a legible appropriately sized duct layout for inspection. * Please clean up overgrowth around the property (back mostly). 8/21/23: Still need revision for interior load bearing wall as identified on Inspection 2460. Revision must be approved prior to this inspection. Check details at this inspection. | |||
| INSULATION | 04/22/2024 | Disapproved - NO FEE | RSIMS |
| Note: 4/22/24: Previously listed item 4 remians unresolved. Inspector Notes from Inspection 2420 4/9/24: Approved as noted to keep project moving. ALL corrections will need to be completed prior to scheduling next inspection. 1). Dryer exhaust needs to be supported with a metal strap at joint. / Needs to be sealed at all joints of the adjustable elbow / needs a nail plate on the garage side. 2). Kitchen Island: slab needs to be completely repaired level with floor with cement. 3). Back left bedroom window has the incorrect anchor at the bottom left jamb. Needs to be tapcon. 4). Kitchen exhaust duct needs to be sealed at all joints of the adjustable elbow. Also needs 3 screws at each connection. Kitchen Exhaust - M1601.4.1 - Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 5). Portable toilet needs to be serviced. (has not had service since 12/20. 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. 4/5/2024 - PREVIOUS INSPECTION NOTES 4/5/24: Inspexction stopped. Not Ready! * silt fence needs to be completed at rear and right side of the property. * No 5ft head pressure. * Please provide a legible appropriately sized duct layout for inspection. * Please clean up overgrowth around the property (back mostly). 8/21/23: Still need revision for interior load bearing wall as identified on Inspection 2460. Revision must be approved prior to this inspection. Check details at this inspection. 4/22/24: Previously listed item 4 remians unresolved. Inspector Notes from Inspection 2420 4/9/24: Approved as noted to keep project moving. ALL corrections will need to be completed prior to scheduling next inspection. 1). Dryer exhaust needs to be supported with a metal strap at joint. / Needs to be sealed at all joints of the adjustable elbow / needs a nail plate on the garage side. 2). Kitchen Island: slab needs to be completely repaired level with floor with cement. 3). Back left bedroom window has the incorrect anchor at the bottom left jamb. Needs to be tapcon. 4). Kitchen exhaust duct needs to be sealed at all joints of the adjustable elbow. Also needs 3 screws at each connection. Kitchen Exhaust - M1601.4.1 - Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 5). Portable toilet needs to be serviced. (has not had service since 12/20. 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. 4/5/2024 - PREVIOUS INSPECTION NOTES 4/5/24: Inspexction stopped. Not Ready! * silt fence needs to be completed at rear and right side of the property. * No 5ft head pressure. * Please provide a legible appropriately sized duct layout for inspection. * Please clean up overgrowth around the property (back mostly). 8/21/23: Still need revision for interior load bearing wall as identified on Inspection 2460. Revision must be approved prior to this inspection. Check details at this inspection. | |||
| LATH/BRICK/ WATER BARRIER | 04/22/2024 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2420 4/9/24: Approved as noted to keep project moving. ALL corrections will need to be completed prior to scheduling next inspection. 1). Dryer exhaust needs to be supported with a metal strap at joint. / Needs to be sealed at all joints of the adjustable elbow / needs a nail plate on the garage side. 2). Kitchen Island: slab needs to be completely repaired level with floor with cement. 3). Back left bedroom window has the incorrect anchor at the bottom left jamb. Needs to be tapcon. 4). Kitchen exhaust duct needs to be sealed at all joints of the adjustable elbow. Also needs 3 screws at each connection. Kitchen Exhaust - M1601.4.1 - Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 5). Portable toilet needs to be serviced. (has not had service since 12/20. 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. 4/5/2024 - PREVIOUS INSPECTION NOTES 4/5/24: Inspexction stopped. Not Ready! * silt fence needs to be completed at rear and right side of the property. * No 5ft head pressure. * Please provide a legible appropriately sized duct layout for inspection. * Please clean up overgrowth around the property (back mostly). 8/21/23: Still need revision for interior load bearing wall as identified on Inspection 2460. Revision must be approved prior to this inspection. Check details at this inspection. | |||
| PEP TANK INSTALLATION REQUEST | 04/22/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: exterior/stucco | |||
| ALL ROUGH | 04/09/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/9/24: Approved as noted to keep project moving. ALL corrections will need to be completed prior to scheduling next inspection. 1). Dryer exhaust needs to be supported with a metal strap at joint. / Needs to be sealed at all joints of the adjustable elbow / needs a nail plate on the garage side. 2). Kitchen Island: slab needs to be completely repaired level with floor with cement. 3). Back left bedroom window has the incorrect anchor at the bottom left jamb. Needs to be tapcon. 4). Kitchen exhaust duct needs to be sealed at all joints of the adjustable elbow. Also needs 3 screws at each connection. Kitchen Exhaust - M1601.4.1 - Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 5). Portable toilet needs to be serviced. (has not had service since 12/20. 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. 4/5/2024 - PREVIOUS INSPECTION NOTES 4/5/24: Inspexction stopped. Not Ready! * silt fence needs to be completed at rear and right side of the property. * No 5ft head pressure. * Please provide a legible appropriately sized duct layout for inspection. * Please clean up overgrowth around the property (back mostly). 8/21/23: Still need revision for interior load bearing wall as identified on Inspection 2460. Revision must be approved prior to this inspection. Check details at this inspection. | |||
| ALL ROUGH | 04/05/2024 | Disapproved - NO FEE | RSIMS |
| Note: 4/5/24: Inspection stopped. Not Ready! * silt fence needs to be completed at rear and right side of the property. FBC 3307.1 * No 5ft head pressure. * Please provide a legible appropriately sized duct layout for inspection. * Please clean up overgrowth around the property (back mostly). 8/21/23: Still need revision for interior load bearing wall as identified on Inspection 2460. Revision must be approved prior to this inspection. Check details at this inspection. | |||
| ROOF VALLEY & METAL | 10/13/2023 | APPROVED | JWALKER |
| Note: 9/25/2023 - PREVIOUS INSPECTION NOTES 9/25/23: Previously listed revision is still needed. Please clean up job site to make it safe for inspection. (2nd request) ** Flashing is still not sealed to wall as previously noted. ** Large area of underlayment on the front of the house has blown up exposing roof sheathing. 8/21/2023 - PREVIOUS INSPECTION NOTES 8/21/23: Revision for Interior load Bearing Walls at Entry still needs to be submitted & approved. Must be approved prior to All Rough inspection. *** Need revision submitted to & approved by the City for the 3 different underlayments installed than what was originally submitted. 1). 5" x 5" flashing is not sealed at the wall as required. 2). Property needs to have excessive weed growth (and any trash) cleaned up before any further inspections will be approved. City code states that grass/weeds cannot be taller than 3". Inspector Notes from Inspection 2460 8/14/23: Spoke to Contractor about deficiencies & revision required. Revision showing Interior Load Bearing wall (identified on truss plan 5 at G03 & G04 Trusses) required anchoring details needs to be submitted to & approved by the City before Insulation Inspection. Check at Insulation. ****** Must be resolved prior to next Inspection. 1). B05 2 ply truss in garage still needs to be fastened per MiTek requirements. (Bottom cord 2 rows 4"OC staggered). 2). G04 2ply Truss needs additional nails in bottom cord. _________________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES 8/1/23: 1). 2Ply trusses - A01, B05, D2 and G4 are not nailed per MiTek required details. Highlighted on pages. 2). Straps for Conventional framing are not secured to the truss or blocking. (Right side) 3). Missing strap left side of Entry at 2 ply girder truss to load bearing wall. 4). As previously stated there are no interior wood load bearing wall details for 12ft high load bearing walls at entry as noted on Plan Page 9. 7/24/2023 - PREVIOUS INSPECTION NOTES 1. Plans shall be bound together FBC 107.3.1 2. No interior load bearing wall detail or Load bearing wood frame wall to CMU connection on site 3. Missing bucket on truss at front entry Stopped inspection, still need to check engineering | |||
| FOOTER | 10/09/2023 | APPROVED | RSIMS |
| ROOF VALLEY & METAL | 09/25/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 9/25/23: Previously listed revision is still needed. Please clean up job site to make it safe for inspection. (2nd request) ** Flashing is still not sealed to wall as previously noted. ** Large area of underlayment on the front of the house has blown up exposing roof sheathing. 8/21/2023 - PREVIOUS INSPECTION NOTES 8/21/23: Revision for Interior load Bearing Walls at Entry still needs to be submitted & approved. Must be approved prior to All Rough inspection. *** Need revision submitted to & approved by the City for the 3 different underlayments installed than what was originally submitted. 1). 5" x 5" flashing is not sealed at the wall as required. 2). Property needs to have excessive weed growth (and any trash) cleaned up before any further inspections will be approved. City code states that grass/weeds cannot be taller than 3". Inspector Notes from Inspection 2460 8/14/23: Spoke to Contractor about deficiencies & revision required. Revision showing Interior Load Bearing wall (identified on truss plan 5 at G03 & G04 Trusses) required anchoring details needs to be submitted to & approved by the City before Insulation Inspection. Check at Insulation. ****** Must be resolved prior to next Inspection. 1). B05 2 ply truss in garage still needs to be fastened per MiTek requirements. (Bottom cord 2 rows 4"OC staggered). 2). G04 2ply Truss needs additional nails in bottom cord. _________________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES 8/1/23: 1). 2Ply trusses - A01, B05, D2 and G4 are not nailed per MiTek required details. Highlighted on pages. 2). Straps for Conventional framing are not secured to the truss or blocking. (Right side) 3). Missing strap left side of Entry at 2 ply girder truss to load bearing wall. 4). As previously stated there are no interior wood load bearing wall details for 12ft high load bearing walls at entry as noted on Plan Page 9. 7/24/2023 - PREVIOUS INSPECTION NOTES 1. Plans shall be bound together FBC 107.3.1 2. No interior load bearing wall detail or Load bearing wood frame wall to CMU connection on site 3. Missing bucket on truss at front entry Stopped inspection, still need to check engineering | |||
| ROOF VALLEY & METAL | 08/21/2023 | Disapproved - NO FEE | RSIMS |
| Note: 8/21/23: Revision for Interior load Bearing Walls at Entry still needs to be submitted & approved. Must be approved prior to All Rough inspection. *** Need revision submitted to & approved by the City for the 3 different underlayments installed than what was originally submitted. 1). 5" x 5" flashing is not sealed at the wall as required. 2). Property needs to have excessive weed growth (and any trash) cleaned up before any further inspections will be approved. City code states that grass/weeds cannot be taller than 3". Inspector Notes from Inspection 2460 8/14/23: Spoke to Contractor about deficiencies & revision required. Revision showing Interior Load Bearing wall (identified on truss plan 5 at G03 & G04 Trusses) required anchoring details needs to be submitted to & approved by the City before Insulation Inspection. Check at Insulation. ****** Must be resolved prior to next Inspection. 1). B05 2 ply truss in garage still needs to be fastened per MiTek requirements. (Bottom cord 2 rows 4"OC staggered). 2). G04 2ply Truss needs additional nails in bottom cord. _________________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES 8/1/23: 1). 2Ply trusses - A01, B05, D2 and G4 are not nailed per MiTek required details. Highlighted on pages. 2). Straps for Conventional framing are not secured to the truss or blocking. (Right side) 3). Missing strap left side of Entry at 2 ply girder truss to load bearing wall. 4). As previously stated there are no interior wood load bearing wall details for 12ft high load bearing walls at entry as noted on Plan Page 9. 7/24/2023 - PREVIOUS INSPECTION NOTES 1. Plans shall be bound together FBC 107.3.1 2. No interior load bearing wall detail or Load bearing wood frame wall to CMU connection on site 3. Missing bucket on truss at front entry Stopped inspection, still need to check engineering | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/14/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 8/14/23: Spoke to Contractor about deficiencies & revision required. Revision showing Interior Load Bearing wall (identified on truss plan 5 at G03 & G04 Trusses) required anchoring details needs to be submitted to & approved by the City before Insulation Inspection. Check at Insulation. ****** Must be resolved prior to next Inspection. 1). B05 2 ply truss in garage still needs to be fastened per MiTek requirements. (Bottom cord 2 rows 4"OC staggered). 2). G04 2ply Truss needs additional nails in bottom cord. _________________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES 8/1/23: 1). 2Ply trusses - A01, B05, D2 and G4 are not nailed per MiTek required details. Highlighted on pages. 2). Straps for Conventional framing are not secured to the truss or blocking. (Right side) 3). Missing strap left side of Entry at 2 ply girder truss to load bearing wall. 4). As previously stated there are no interior wood load bearing wall details for 12ft high load bearing walls at entry as noted on Plan Page 9. 7/24/2023 - PREVIOUS INSPECTION NOTES 1. Plans shall be bound together FBC 107.3.1 2. No interior load bearing wall detail or Load bearing wood frame wall to CMU connection on site 3. Missing bucket on truss at front entry Stopped inspection, still need to check engineering | |||
| WALL SHEATHING | 08/14/2023 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/01/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 8/1/23: 1). 2Ply trusses - A01, B05, D2 and G4 are not nailed per MiTek required details. Highlighted on pages. 2). Straps for Conventional framing are not secured to the truss or blocking. (Right side) 3). Missing strap left side of Entry at 2 ply girder truss to load bearing wall. 4). As previously stated there are no interior wood load bearing wall details for 12ft high load bearing walls at entry as noted on Plan Page 9. 7/24/2023 - PREVIOUS INSPECTION NOTES 1. Plans shall be bound together FBC 107.3.1 2. No interior load bearing wall detail or Load bearing wood frame wall to CMU connection on site 3. Missing bucket on truss at front entry Stopped inspection, still need to check engineering | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/24/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Plans shall be bound together FBC 107.3.1 2. No interior load bearing wall detail or Load bearing wood frame wall to CMU connection on site 3. Missing bucket on truss at front entry Stopped inspection, still need to check engineering | |||
| TIE BEAM / LINTEL | 09/14/2022 | APPROVED | BTAYLOR |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Dowel in front marked to be drilled has not been drilled. 9-8-22 - left front wall at left of window - missing dowel as noted above. Circled on print. 9/9/22 Above listed correction has not been made. | |||
| TIE BEAM / LINTEL | 09/09/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Dowel in front marked to be drilled has not been drilled. 9-8-22 - left front wall at left of window - missing dowel as noted above. Circled on print. 9/9/22 Above listed correction has not been made. | |||
| TIE BEAM / LINTEL | 09/08/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION Dowel in front marked to be drilled has not been drilled. 9-8-22 - left front wall at left of window - missing dowel as noted above. Circled on print. | |||
| TIE BEAM / LINTEL | 08/30/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Dowel in front marked to be drilled has not been drilled. | |||
| ROW - DRAINAGE | 06/30/2022 | APPROVED - AS NOTED | PFLANAGAN |
| Note: 6/30/22 ALL CORRECTIONS DONE AT TIME OF INSPECTION ------------------------------------------------------------------------------------------------------------------------------- (1) NEED TO KEEP SWALE IN FRONT CLEARED SO WATER CAN FLOW TO OUTFALL OR NEED TO HAVE A TEMPORARY CULVERT PIPE TO ALOW WATER TO FLOW (2) NEED TO HAVE PORTER JOHN ON LOT OUT SWALE SO IT DONT INTERUPT FLOW OF WATER TO OUTFALL | |||
| ROW - DRAINAGE | 06/23/2022 | Disapproved - NO FEE | PFLANAGAN |
| Note: (1) NEED TO KEEP SWALE IN FRONT CLEARED SO WATER CAN FLOW TO OUTFALL OR NEED TO HAVE A TEMPORARY CULVERT PIPE TO ALOW WATER TO FLOW (2) NEED TO HAVE PORTER JOHN ON LOT OUT SWALE SO IT DONT INTERUPT FLOW OF WATER TO OUTFALL NEXT INSPECTION ON 6/30/22 | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/08/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/25/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Minimum slab depth is to be 3 1/2". Left green test sting lines in place for contractors reference. Remove excess soil and tamp. | |||
| MONOLITHIC SLAB | 03/24/2022 | Disapproved - NO FEE | JWALKER |
| Note: Minimum slab depth is to be 3 1/2". Left green test sting lines in place for contractors reference. Remove excess soil and tamp. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/22/2022 | APPROVED | RMARTIN |
| WATER METER INSTALLATION REQUEST | 02/28/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 2/23/2022 8:11:56 AM trees on property | |||
| WATER METER INSTALLATION REQUEST | 02/22/2022 | Disapproved - NO FEE | CSTONE |
| Note: trees on property |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/11/2024 | 10/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/07/2024 | 10/07/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/02/2024 | 10/07/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM List new mechanical subcontractor | |||
| BLD | CANCEL | 10/02/2024 | 10/03/2024 |
| MECH | HOLD | 09/25/2024 | 09/27/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location the heatload needs to be Daytona Beach 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| BADMIN | INFORMATION | 09/06/2024 | 09/06/2024 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM file name should be final survey please exclude numbers and address from file name | |||
| ZON | COMPLETE | 07/18/2024 | 07/19/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/05/2023 | 09/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/05/2023 | 09/05/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM No zoning changes | |||
| BADMIN | INFORMATION | 08/21/2023 | 08/21/2023 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM wrong document uploaded for fondation survey. You uploaded a foundation plan instead | |||
| BLD | COMPLETE | 08/21/2023 | 08/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/07/2022 | 04/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/07/2022 | 04/07/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/21/2022 | 01/21/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/21/2022 | 01/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/21/2022 | 01/27/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See left side property line drainage arrows | |||
| BLD | COMPLETE | 01/04/2022 | 01/10/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/04/2022 | 01/06/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 01/04/2022 | 01/05/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/04/2022 | 01/04/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/04/2022 | 01/05/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/04/2022 | 01/10/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/04/2022 | 01/11/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/04/2022 | 01/05/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM please provide th width of the driveway iwidth in front of garage doors | |||
| SWALE | COMPLETE | 01/04/2022 | 03/04/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 10/21/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 10/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 10/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 10/21/2024 |
| CONTRACTOR CHANGE | ¤40.00 | 10/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 10/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 10/21/2024 |
| REINSPECTION FEE | ¤40.00 | 10/21/2024 |
| REINSPECTION FEE | ¤40.00 | 10/21/2024 |
| REINSPECTION FEE | ¤40.00 | 10/21/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/21/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/21/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/21/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/21/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/21/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/21/2024 |
| UTILITY PEP REINSPECTION | ¤40.00 | 10/21/2024 |
| SEWER CREDIT | (¤1,147.00) | 02/11/2022 |
| SEWER INSPECTION | ¤25.00 | 02/11/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 02/11/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 02/11/2022 |
| SITE PLAN 30 | ¤30.00 | 02/11/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/11/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/11/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 02/11/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/11/2022 |
| SW ENG PRE APRON | ¤30.00 | 02/11/2022 |
| SURCHARGE FS 533.721 | ¤12.02 | 02/11/2022 |
| SURCHARGE - FS 468.631 | ¤18.03 | 02/11/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/11/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 02/11/2022 |
| IMPACT FEE FIRE | ¤388.65 | 02/11/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 02/11/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/11/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 02/11/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/11/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 02/11/2022 |
| CONNECTION FEES | ¤1,077.88 | 02/11/2022 |
| INSPECTION - RESIDENTIAL | ¤866.25 | 02/11/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤245.70 | 02/11/2022 |
| METER - DEPOSIT | ¤60.00 | 02/11/2022 |
| WATER- TURN ON | ¤25.00 | 02/11/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/11/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,956.19 |