Permit #2022010236

Permit Details

Status: COED

Parcel Id: 07-11-31-7016-00120-0710
CONDITIONED SPACE: 2303 sqft
GARAGE: 724 sqft
OPENED PORCH (WITH ROOF) : 404 sqft
Total Square Footage: 3431 sqft
Block: 00120
Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE
Job Phone: 386-445-3405
Location Address: 3 CUNNINGHAM LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/01/2022
NOC: RECORDED
Applicant name: JAY DARREN CURBOW
Owner: MATERIA, DENISE

Address

4 ROSE TERRACE

CLARK, NJ 07066

Lot: 0710
Contracted Stated Job Value: ¤336,601.00
Job Description: Single Family Residence
Type: CN

Contractor

BLUE WATER HOMES INC
Status Location Address State License Number Phone
ACTIVE

4881 PALM COAST PARKWAY NW UNIT 1

PALM COAST, FL 32137

CBC1258679 (Exp: 08/31/2026) 386-445-3405

Sub Contractors

JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
BRETT CHRISTIAN GIBSON
Status Location Address State License Number Phone
ACTIVE

250 SEGOVIA RD

ST AUGUSTINE, FL 32086

CAC1818423 (Exp: 08/31/2026) 904-229-8131
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
CANCEL

P. O. Box 1963

Bunnell, FL 32110

ER0011613 (Exp: 08/31/2008) (386) 437-0607 (386)437-1847
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/20/2023 FINAL APPROVED AGAETANO
Note: 1/19/2023 - PREVIOUS INSPECTION NOTES 1/18/2023 - PREVIOUS INSPECTION NOTES 1/12/2023 - PREVIOUS INSPECTION NOTES 01-12-2023 Energy calcs do not match. 01-18-2023 Equipment installed does not match energy calcs. Lennox installed and Carrier on energy calcs. Please revise to tje building department and provide revised approved calcs on site. 01-19-2023 Carrier equipment submitted. Lennox installed. Please revise and submit energy calculations to the building department and provide approved calcs on site for inspection.
BLD - BUILDING FINAL 01/19/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 1/18/2023 - PREVIOUS INSPECTION NOTES 1/12/2023 - PREVIOUS INSPECTION NOTES 01-12-2023 Energy calcs do not match. 01-18-2023 Equipment installed does not match energy calcs. Lennox installed and Carrier on energy calcs. Please revise to tje building department and provide revised approved calcs on site. 01-19-2023 Carrier equipment submitted. Lennox installed. Please revise and submit energy calculations to the building department and provide approved calcs on site for inspection.
BLD - BUILDING FINAL 01/18/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 1/12/2023 - PREVIOUS INSPECTION NOTES 01-12-2023 Energy calcs do not match. 01-18-2023 Equipment installed does not match energy calcs. Lennox installed and Carrier on energy calcs. Please revise to tje building department and provide revised approved calcs on site.
U-CROSS CONNECTION 01/13/2023 APPROVED DHANEY
ROW - STORMWATER FINAL 01/12/2023 FINAL APPROVED EMADISON
Note: ** 01/12/23 ALL CORRECTIONS HAVE BEEN MADE EVERYTHING LOOKS GOOD AT THE TIME OF INSPECTION ___________________________________________________________________________________________________________________________ 12/22/2022 - PREVIOUS INSPECTION NOTES See previous Inspection note. Silt fence still there. Bare earth still not sodded. ** NOTE TO INSPECTOR ** 12/19/22 NEED TO REMOVE SEDIMENT THAT HAS ERODED AND WASHED IN CANAL IN THE LEFT CORNER OF SEAWALL LARGE MOUND ** CULVERT ENDS NEED TO BE CLEANED OUT ** NEED TO REMOVE SILT FENCE ALONG REAR PROPERTY LINE AND SOD BARE EARTH AROUND STUMPS AT REAR PROPERTY LINE.
BLD - BUILDING FINAL 01/12/2023 Disapproved - NO FEE AGAETANO
Note: 01-12-2023 Energy calcs do not match. Please have approved energy calcs on site for inspection.
U -UTILITY RESIDENTIAL FINAL 12/22/2022 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 12/22/2022 Disapproved -FEE REQUIRED RGROSS
Note: See previous Inspection note. Silt fence still there. Bare earth still not sodded. ** NOTE TO INSPECTOR ** 12/19/22 NEED TO REMOVE SEDIMENT THAT HAS ERODED AND WASHED IN CANAL IN THE LEFT CORNER OF SEAWALL LARGE MOUND ** CULVERT ENDS NEED TO BE CLEANED OUT ** NEED TO REMOVE SILT FENCE ALONG REAR PROPERTY LINE AND SOD BARE EARTH AROUND STUMPS AT REAR PROPERTY LINE.
ROW - FINAL APRON (AFTER POUR) 12/22/2022 APPROVED RGROSS
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/19/2022 FINAL APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 12/19/2022 APPROVED EMADISON
Note: ** 12/19/22 NEED TO REMOVE SEDIMENT THAT HAS ERODED AND WASHED IN CANAL IN THE LEFT CORNER OF SEAWALL LARGE MOUND ** CULVERT ENDS NEED TO BE CLEANED OUT ** NEED TO REMOVE SILT FENCE ALONG REAR PROPERTY LINE AND SOD BARE EARTH AROUND STUMPS AT REAR PROPERTY LINE.
ROW- PRE-APRON (PRE-POUR) 10/14/2022 APPROVED EMADISON
Note: ** 10/14/22 CORRECTIONS HAVE BEEN MADE ** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** IN THE EVENT OIF RAIN BUILDER NEEDS TO RECHECK ELEVATIONS AND COMPACTION OF MATERIAL 10/7/2022 - PREVIOUS INSPECTION NOTES ** 10/07/22 RIGHT SIDE OF CULVERT IS SET TO LOW SWALE PLANE CALLS FOR A (6.25) YOU HAVE IT SET AT A (6.07) WHICH IS JUST SHORT OF 2/10 THS OFF. ** CHIP OVER POUR CONCRETE IN FRONT OF SMALL GARAGE OPENING, NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA ABOVE ROW APRON 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 CULVERT IS HIGH IN THE CENTER AT THE BAND NEEDS TO BE RESET AS WATER WILL NOT FLOW LEFT TO RIGHT AS INDICATED ON SWALE PLAN ** THERE IS NO MATERIAL AROUND CULVERT NEEDS TO BE BURIED 1/2 WAY UP AND COMPACTED
TUB SET 10/11/2022 APPROVED AGAETANO
ROW- PRE-APRON (PRE-POUR) 10/07/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/07/22 RIGHT SIDE OF CULVERT IS SET TO LOW SWALE PLANE CALLS FOR A (6.25) YOU HAVE IT SET AT A (6.07) WHICH IS JUST SHORT OF 2/10 THS OFF. ** CHIP OVER POUR CONCRETE IN FRONT OF SMALL GARAGE OPENING, NEEDS TO BE A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA ABOVE ROW APRON 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 CULVERT IS HIGH IN THE CENTER AT THE BAND NEEDS TO BE RESET AS WATER WILL NOT FLOW LEFT TO RIGHT AS INDICATED ON SWALE PLAN ** THERE IS NO MATERIAL AROUND CULVERT NEEDS TO BE BURIED 1/2 WAY UP AND COMPACTED
ELECTRIC - EARLY POWER 10/06/2022 APPROVED JMUNSON
ROW- PRE-APRON (PRE-POUR) 10/03/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/03/22 CULVERT IS HIGH IN THE CENTER AT THE BAND NEEDS TO BE RESET AS WATER WILL NOT FLOW LEFT TO RIGHT AS INDICATED ON SWALE PLAN ** THERE IS NO MATERIAL AROUND CULVERT NEEDS TO BE BURIED 1/2 WAY UP AND COMPACTED ** SEE ATTACHED PHOTOS
U - SEWER TIE IN 09/20/2022 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 08/15/2022 APPROVED AGAETANO
INSULATION 08/12/2022 APPROVED LMILLER
ALL ROUGH 08/10/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION need nail plate fore range vent M1502.5 , need nail plate for plumbimng in common bath bottom plate P2603.2.1 need to complete shingles befor next inspection 8-9-22 still need nail plate for plumbimng in common bath bottom plate P2603.2.1 (back side DWV)
ALL ROUGH 08/09/2022 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION need nail plate fore range vent M1502.5 , need nail plate for plumbimng in common bath bottom plate P2603.2.1 need to complete shingles befor next inspection 8-9-22 still need nail plate for plumbimng in common bath bottom plate P2603.2.1 (back side DWV)
ALL ROUGH 08/05/2022 Disapproved -FEE REQUIRED LMILLER
Note: need nail plate fore range vent M1502.5 , need nail plate for plumbimng in common bath bottom plate P2603.2.1 need to complete shingles befor next inspection
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/28/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION 1. Sheet A1 Keynotes D and E are not installed as per plans. 2. A 10 engineering member missing.
WALL SHEATHING 07/25/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/25/2022 Disapproved - NO FEE AGAETANO
Note: 1. Sheet A1 Keynotes D and E are not installed as per plans. 2. A 10 engineering member missing.
ROOF VALLEY & METAL 06/08/2022 APPROVED LMILLER
TIE BEAM / LINTEL 05/04/2022 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 05/04/2022 APPROVED TBAKER
ELEV CERT-FOUNDATION APPROVAL 05/02/2022 APPROVED JMYERS
MONOLITHIC SLAB 03/10/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Please have full set of approved drawings on site for inspection.
MONOLITHIC SLAB 03/08/2022 Disapproved - NO FEE AGAETANO
Note: Please have full set of approved drawings on site for inspection.
PLUMBING 1ST ROUGH UNDERGROUND 03/01/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 03/01/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/04/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
PLFM COMPLETE 01/23/2023 01/23/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
MECH COMPLETE 01/19/2023 01/19/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 01/12/2023 01/17/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 12/01/2022 12/01/2022
Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM CANNOT UPDATE FINAL SURVEY YOUR NOC HAS EXPIRED ON 11/22/2022
BLD COMPLETE 06/03/2022 06/06/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/02/2022 05/02/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM COMPLETE 05/02/2022 05/02/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been accepted. Please provide Final prior to receiving CO.
SW1 COMPLETE 05/02/2022 05/09/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 05/02/2022 05/02/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLFM COMPLETE 01/27/2022 01/31/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been accepted. Please provide Foundation and Final prior to receiving CO.
PLFM HOLD 01/25/2022 01/25/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The second page of the elevation certificate still has the incorrect address.
ZON COMPLETE 01/25/2022 01/25/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
LOCATE COMPLETE 01/25/2022 01/26/2022
Note: Released By: TONI CHURCHILL - -
ZON HOLD 01/19/2022 01/19/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM repeat comment: the alternate address is 3 Cunningham Lane please correct that information on the survey and site plan. also the street name is Cunnigham Lane. The survey/site plan has it labeled as Cunningham Court within the survey itself, not just at the top. The survey and site plan need to be correct. I circled what needs to be corrected on siteplan
ELEC COMPLETE 01/19/2022 01/19/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLFM HOLD 01/19/2022 01/19/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The same elevation certificate was submitted, comments not addressed. Address on the elevation certificate needs to be 3 Cunningham Lane. In C2b please remove the checkmark on the measurement box.
MECH COMPLETE 01/19/2022 01/19/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
LOCATE HOLD 01/19/2022 01/24/2022
Note: Held By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM issues not addressed.
BLD COMPLETE 01/06/2022 01/10/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 01/06/2022 01/10/2022
Note: Released By: HALEIGH HAND - -
ELEC HOLD 01/06/2022 01/07/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs
ENGIN1 COMPLETE 01/06/2022 01/06/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE HOLD 01/06/2022 01/11/2022
Note: Held By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM Address on locate needs to be 3
MECH HOLD 01/06/2022 01/10/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM R403.7.1.2.1 FBC Energy Conservation 2020 7TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated.
SW1 COMPLETE 01/06/2022 01/13/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
SWALE COMPLETE 01/06/2022 03/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM HOLD 01/06/2022 01/07/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Address on the elevation certificate needs to be 3 Cunningham Lane. In C2b please remove the checkmark on the measurement box.
ZON HOLD 01/06/2022 01/06/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM the alternate address is 3 Cunningham Lane please correct that information on the survey and site plan. also the street name is Cunnigham Lane. The survey/site plan has it labeled as Cunningham Court within the survey itself, not just at the top. The survey and site plan need to be correct. color sheet please change the address to 3 Cunningham.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 01/20/2023
REINSPECTION RESIDENTIAL ¤40.00 01/19/2023
REINSPECTION RESIDENTIAL ¤40.00 01/19/2023
PLAN REVIEW - REVISION ¤32.50 01/19/2023
PLAN REVIEW - REVISION ¤32.50 01/05/2023
REINSPECTION RESIDENTIAL ¤40.00 01/05/2023
REINSPECTION RESIDENTIAL ¤40.00 01/05/2023
CONTRACTOR CHANGE ¤40.00 01/05/2023
CONTRACTOR CHANGE ¤20.00 01/05/2023
CONTRACTOR CHANGE ¤20.00 01/05/2023
SW ENG REINSPECTION 20 ¤20.00 01/05/2023
SW ENG REINSPECTION 30 ¤30.00 01/05/2023
SW ENG REINSPECTION 30 ¤30.00 01/05/2023
SW ENG - REVIEW 20 ¤20.00 02/01/2022
SW ENG RES REVIEW 200 ¤200.00 02/01/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 02/01/2022
SEWER CREDIT (¤1,147.00) 02/01/2022
SEWER INSPECTION ¤25.00 02/01/2022
SEWER CAPITAL FACILITY ¤4,939.76 02/01/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 02/01/2022
SITE PLAN 30 ¤30.00 02/01/2022
METER - DEPOSIT ¤60.00 02/01/2022
METER - DEPOSIT ¤60.00 02/01/2022
WATER-METER ¤467.09 02/01/2022
WATER- TURN ON ¤25.00 02/01/2022
WATER- TURN ON ¤25.00 02/01/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/01/2022
INSPECTION - RESIDENTIAL ¤926.75 02/01/2022
PLAN REVIEW - RESIDENTIAL ¤262.86 02/01/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 02/01/2022
IMPACT FEE FIRE ¤388.65 02/01/2022
IMPACT FEE PARKS ¤1,455.13 02/01/2022
IMPACT FEE SCHOOL ¤3,600.00 02/01/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 02/01/2022
WATER -IRRIGATION INSPECTION ¤25.00 02/01/2022
WATER -IRRIGATION INSPECTION ¤25.00 02/01/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 02/01/2022
SURCHARGE FS 533.721 ¤12.82 02/01/2022
SURCHARGE - FS 468.631 ¤19.23 02/01/2022
SW ENG - FOUNDATION SURVEY ¤20.00 02/01/2022
SW ENG INSPECTION 80 ¤80.00 02/01/2022
SW ENG PRE APRON ¤30.00 02/01/2022
CONNECTION FEES ¤1,077.88 02/01/2022
Fees Total Due: ¤0.00 Total Paid: ¤18,357.94