I want to search for...
Permit #2022010380
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00420-0090 |
| Total Square Footage: 2964 sqft |
| Block: 00420 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 904-236-5200 |
| Location Address: 17 RYBARK LN |
| Type: RF - REROOF |
| Issue Date: 01/10/2022 |
| NOC: RECORDED |
| Applicant name: DALE KENT TADLOCK |
| Owner: MCWHERTER RIKKI J & ANDREW J MCWERTER W&H |
|
Address 17 RYBARK LANE PALM COAST, FL 32164 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤13,400.00 |
| Job Description: Reroof - OC Architectural Shingle System FL10674.1 |
| Type: CN |
Contractor
TADLOCK ROOFING INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
7999 PHILLIPS HWY UNIT 211 JACKSONVILLE, FL 32256 |
CCC1328417 (Exp: 08/31/2024) | 904-236-5200 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF FINAL | 02/14/2022 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION The ventilation is a single solar operated vent. Please provide engineering specs and size of area of attic being ventilated. To the building department. | |||
| ROOF FINAL | 02/07/2022 | Disapproved - NO FEE | JWALKER |
| Note: The ventilation is a single solar operated vent. Please provide engineering specs and size of area of attic being ventilated. To the building department. | |||
| ROOF AFFIDAVIT | 02/01/2022 | APPROVED | STHOMAS |
| ROOF IN PROGRESS- MIDROOF | 01/14/2022 | APPROVED - AS NOTED | JWALKER |
| Note: 1/14/22 Please submitt a revision to the building department for the 3 types of synthetic underlayment used. Gator, Rino and ABC underlayment has been installed on the roof. Check above for submittal at FINAL Roof. | |||
| ROOF IN PROGRESS- MIDROOF | 01/13/2022 | Disapproved - NO FEE | JWALKER |
| Note: 2nd stop of the day first stop appx 12:20 plywood replacement was not done correctly and no shingles were installed. returned at 2:29pm shingles that have been installed on the rear roof will need to be removed due to the nails being set to deep and blowing through the shingles. The underlayment will need to be removed and new underlament installed. The left side roof is good. The front and the right side are good to finish shingling. Leave the new rear underlayment uncovered for reinspection. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/10/2022 | 02/11/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/10/2022 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 01/10/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/10/2022 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/10/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤94.00 |