Permit #2022010413
Permit Details
Status: COED
| Parcel Id: 07-11-31-7033-00260-0140 |
| CONDITIONED SPACE: 2137 sqft |
| GARAGE: 491 sqft |
| PATIO/DECK (NO ROOF) : 225 sqft |
| OPENED PORCH (WITH ROOF) : 62 sqft |
| Total Square Footage: 2915 sqft |
| Block: 00260 |
| Subdivision: 2184 - SECTION 33-ROYAL PALMS |
| Job Phone: 386-447-4151 |
| Location Address: 17 RED BARN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/26/2022 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: GORDON LESLIE & BEVERLY H&W |
|
Address 15 RED BARN DR PALM COAST, FL 32164 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
ERIC FRANCO
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
840 DELTONA BLVD DELTONA, FL 32725 |
STE F2 DELTONA, FL 32725 |
CCC1327280 (Exp: 08/31/2026) | 386-575-4007 |
KERRY DWAIN AYLESWORTH II
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2820 LEWIS SPEEDWAY ST AUGUSTINE, FL 32084 |
STE B ST AUGUSTINE, FL 32084 |
CAC1820713 (Exp: 08/31/2026) | 904-342-5709 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JAMES DOUGLAS II
| Status | Location Address | State License Number | Phone |
| ACTIVE |
357 SUNSET AVE HOLLY HILL, FL 32117 |
21340 (Exp: 08/31/2026) | 386-236-8005 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/22/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Master bath closet the outlet has no power. 2. The gas water heater exhaust duct cannot be aluminum flex. M-802 | |||
| BLD - BUILDING FINAL | 12/22/2023 | FINAL APPROVED | JWALKER |
| Note: 12/22/2023 - PREVIOUS INSPECTION NOTES 1. Master bath closet the outlet has no power. 2. The gas water heater exhaust duct cannot be aluminum flex. M-802 | |||
| TUB SET | 12/13/2023 | APPROVED | MGIBSON |
| Note: 12/12/2023 - PREVIOUS INSPECTION NOTES House is locked 12/7/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION NEED PRESSURE BALANCE VALVE AT TUB SEAL TUB ROUGH BOX, NEED SPECS FOR MASTER SHOWER ALSO ON SITE AT NEXT TUB INSPECTION | |||
| TUB SET | 12/12/2023 | Disapproved - NO FEE | KSANDOE |
| Note: House is locked 12/7/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION NEED PRESSURE BALANCE VALVE AT TUB SEAL TUB ROUGH BOX, NEED SPECS FOR MASTER SHOWER ALSO ON SITE AT NEXT TUB INSPECTION | |||
| TUB SET | 12/07/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION NEED PRESSURE BALANCE VALVE AT TUB SEAL TUB ROUGH BOX, NEED SPECS FOR MASTER SHOWER ALSO ON SITE AT NEXT TUB INSPECTION | |||
| ROW - STORMWATER FINAL | 11/22/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/22/23 PREVIOUS CORRECTIONS REQUESTED COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ 11/21/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT OUT OF CULVERTS AND ON MITER ENDS 2) NEED TO PICK UP ALL TRASH IN LOT | |||
| U -UTILITY RESIDENTIAL FINAL | 11/22/2023 | FINAL APPROVED | DHANEY |
| Note: 11/20/2023 - PREVIOUS INSPECTION NOTES Pep panel on house has not been connected to electric source yet . | |||
| U -UTILITY RESIDENTIAL FINAL | 11/21/2023 | Disapproved - NO FEE | DHANEY |
| Note: Pep panel on house has not been connected to electric source yet . | |||
| U-CROSS CONNECTION | 11/21/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 11/21/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 11/21/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL DIRT OUT OF CULVERTS AND ON MITER ENDS 2) NEED TO PICK UP ALL TRASH IN LOT | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/20/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION FROM THE TIME OF THE INSPECTION APPROVAL TO THE CONCRETE POUR. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/17/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION FROM THE TIME OF THE INSPECTION APPROVAL TO THE CONCRETE POUR. | |||
| ELECTRIC - EARLY POWER | 10/27/2023 | APPROVED | JWALKER |
| ROW- PRE-APRON (PRE-POUR) | 09/06/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 09/06/23 FAR RIGHT DRIVEWAY APRON WING FORMBOARD NEEDS TO COME UP SLIGHTLY TO MAKE SURE THE FALL IS POSITIVE TO THE ROAD. IT IS BASICALLY A HAIR FROM BEING FLAT. NEEDS TO HAVE A FORWARD PITCH TOWARD THE ROAD. EVERYTHING ELSE LOOKS GOOD SO I WILL APPROVE THIS AS NOTED, IT IS YOUR RESPOSIBILTY TO MAKE SURE THERE IS POSITIVE PITCH. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 06/13/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 06/13/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 05/10/2023 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 04/25/2023 | APPROVED | JWALKER |
| GAS ROUGH | 04/18/2023 | APPROVED | JWALKER |
| Note: 4/12/2023 - PREVIOUS INSPECTION NOTES 4/4/2023 - PREVIOUS INSPECTION NOTES NO TEST ON GUAGE AND NOT BONDED BOND WIRE NOT RAN STILL | |||
| INSULATION | 04/14/2023 | APPROVED | TSTAUFFACHER |
| Note: 4/12/2023 - PREVIOUS INSPECTION NOTES 4/12/23: This house only has spray foam insulation on roof sheathing and at garage wall. No fire blocking is complete yet. 1). 5ft. head pressure is still not holding. 2). Gas pipe along trusses is still not supported/anchored as required. Inspector Notes from Inspection 2420 1. 5' head test not holding water. 2. Gas piping no pressure on the test gauge. 3. Bath fan exhaust ducts need to be lifted off the ceiling for insulation fill and supported minimum of 4' o.c. 4. Install nail plates. Right side of kitchen window and right side bathroom at the top chords to protect the wiring. 5. The gas piping installed is not matching the approved gas riser. Please submitt a revison to the building department showing pipe size, length and material for appliances. The pipe will also need to be supported where it runs on the ceiling trusses. Please have revision submitted before insulation inspection. 6. Adding a tub set inspection for the jetted tub. | |||
| INSULATION | 04/12/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/12/23: This house only has spray foam insulation on roof sheathing and at garage wall. No fire blocking is complete yet. 1). 5ft. head pressure is still not holding. 2). Gas pipe along trusses is still not supported/anchored as required. Inspector Notes from Inspection 2420 1. 5' head test not holding water. 2. Gas piping no pressure on the test gauge. 3. Bath fan exhaust ducts need to be lifted off the ceiling for insulation fill and supported minimum of 4' o.c. 4. Install nail plates. Right side of kitchen window and right side bathroom at the top chords to protect the wiring. 5. The gas piping installed is not matching the approved gas riser. Please submitt a revison to the building department showing pipe size, length and material for appliances. The pipe will also need to be supported where it runs on the ceiling trusses. Please have revision submitted before insulation inspection. 6. Adding a tub set inspection for the jetted tub. | |||
| GAS ROUGH | 04/12/2023 | Disapproved - NO FEE | MGIBSON |
| Note: 4/4/2023 - PREVIOUS INSPECTION NOTES NO TEST ON GUAGE AND NOT BONDED BOND WIRE NOT RAN STILL | |||
| ALL ROUGH | 04/05/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. 5' head test not holding water. 2. Gas piping no pressure on the test gauge. 3. Bath fan exhaust ducts need to be lifted off the ceiling for insulation fill and supported minimum of 4' o.c. 4. Install nail plates. Right side of kitchen window and right side bathroom at the top chords to protect the wiring. 5. The gas piping installed is not matching the approved gas riser. Please submitt a revison to the building department showing pipe size, length and material for appliances. The pipe will also need to be supported where it runs on the ceiling trusses. Please have revision submitted before insulation inspection. 6. Adding a tub set inspection for the jetted tub. | |||
| GAS ROUGH | 04/04/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NO TEST ON GUAGE AND NOT BONDED | |||
| ELECTRIC-TUG | 11/30/2022 | APPROVED | JMUNSON |
| WALL SHEATHING | 07/21/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/21/2022 | APPROVED - AS NOTED | JWALKER |
| Note: Front entry, rear porch install blocking and hold down anchor / straps where the ridge board falls on the roof decking. Install support under over framed ridge above garage area. Rear. Truss T15 missing engineering, rear porch area. Missing hold down ties at truss JC1 and 3 left front garage. | |||
| ROOF VALLEY & METAL | 07/13/2022 | APPROVED | JWALKER |
| ROOF SHEATHING | 07/06/2022 | APPROVED | JWALKER |
| TIE BEAM / LINTEL | 05/12/2022 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 03/29/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/25/2022 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/22/2022 | APPROVED | MGIBSON |
| ELECTRIC TEMP POLE | 02/08/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 8:47 am | |||
| WATER METER INSTALLATION REQUEST | 01/31/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/27/2023 | 11/28/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/26/2023 | 07/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/26/2023 | 07/31/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/26/2023 | 07/26/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/09/2023 | 02/14/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/25/2022 | 03/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/25/2022 | 03/25/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/11/2022 | 01/13/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/11/2022 | 01/18/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 01/11/2022 | 01/12/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/11/2022 | 01/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/11/2022 | 01/12/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/11/2022 | 01/12/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/11/2022 | 01/19/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/11/2022 | 01/11/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/11/2022 | 03/09/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 12/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/13/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 02/09/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 01/26/2022 |
| IMPACT FEE FIRE | ¤388.65 | 01/26/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 01/26/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/26/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/26/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/26/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 01/26/2022 |
| SURCHARGE FS 533.721 | ¤15.10 | 01/26/2022 |
| SURCHARGE - FS 468.631 | ¤22.65 | 01/26/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/26/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/26/2022 |
| SW ENG PRE APRON | ¤30.00 | 01/26/2022 |
| CONNECTION FEES | ¤1,077.88 | 01/26/2022 |
| METER - DEPOSIT | ¤60.00 | 01/26/2022 |
| WATER- TURN ON | ¤25.00 | 01/26/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/26/2022 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 01/26/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 01/26/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/26/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/26/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 01/26/2022 |
| SEWER CREDIT | (¤1,342.00) | 01/26/2022 |
| SEWER INSPECTION | ¤25.00 | 01/26/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 01/26/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 01/26/2022 |
| SITE PLAN 30 | ¤30.00 | 01/26/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,588.94 |