I want to search for...
Permit #2022010420
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-0570 |
| CONDITIONED SPACE: 2274 sqft |
| GARAGE: 686 sqft |
| OPENED PORCH (WITH ROOF) : 258 sqft |
| OPENED PORCH (WITH ROOF) : 41 sqft |
| Total Square Footage: 3259 sqft |
| Block: 00000 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-313-6221 |
| Location Address: 687 MAHOGANY RUN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/31/2022 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: DAY LAWRENCE LEON & POLLY MARIE H&W |
|
Address 4 LINDEN PLACE PALM COAST, FL 32137 |
| Lot: 0570 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
PATRICK FRANCIS MCADAMS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1201 South Flagler Ave Flagler Beach, FL 32136 |
CFC057805 (Exp: 08/31/2026) | 386-283-9236 | 321-248-0447 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/08/2023 | FINAL APPROVED | AGAETANO |
| U-CROSS CONNECTION | 05/08/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 03/23/2023 | APPROVED | FSLADISH |
| ROW - STORMWATER FINAL | 03/23/2023 | APPROVED | FSLADISH |
| Note: ** 03/23/23 LOOKED GOOD AT TIME OF INSPECTION. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/23/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: remove soils from water meter pit around assembly/meter/check valves | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/22/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/22/2023 | APPROVED | FSLADISH |
| ELECTRIC - EARLY POWER | 12/22/2022 | APPROVED | JMUNSON |
| ROW- PRE-APRON (PRE-POUR) | 11/07/2022 | APPROVED | EMADISON |
| Note: ** 11/07/22 READY TO SET PAVERS 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 READY TO SPREAD AND COMPACT PAVER BASE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED | |||
| ROW- PAVER RESTRAINTS | 10/26/2022 | APPROVED | EMADISON |
| Note: ** 10/26/22 PAVER RESTRAINTS ARE READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 10/26/2022 | PARTIALLY APPROVED | EMADISON |
| Note: ** 10/26/22 READY TO SPREAD AND COMPACT PAVER BASE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED | |||
| INSULATION | 08/23/2022 | APPROVED | AGAETANO |
| U - SEWER TIE IN | 08/22/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 08/22/2022 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 08/16/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 07/28/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Wires not phased out in electrical panel. | |||
| ALL ROUGH | 07/27/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Wires not phased out in electrical panel. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/26/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Contractor not ready for roof sheathing inspection. | |||
| EXTERIOR STRAP/CLIP | 07/26/2022 | APPROVED | FWILLIS |
| WATER METER INSTALLATION REQUEST | 07/26/2022 | APPROVED | CSTONE |
| ROOF VALLEY & METAL | 06/29/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING | 05/24/2022 | APPROVED | AGAETANO |
| Note: Down cells approved as well. | |||
| DOWN CELL | 05/24/2022 | APPROVED | AGAETANO |
| Note: Contractor may have called in for home foundation down cells. No retaining wall or stem wall. | |||
| WALL SHEATHING | 05/23/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/23/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Contractor not ready for roof sheathing inspection. | |||
| ELECTRIC-TUG | 05/23/2022 | APPROVED | AGAETANO |
| TIE BEAM / LINTEL | 03/22/2022 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 03/10/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/25/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Please have a full set of approved drawi gs on site for inspection. | |||
| MONOLITHIC SLAB | 02/24/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Please have a full set of approved drawi gs on site for inspection. No termite bond posted. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/23/2022 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | COMPLETE | 02/23/2023 | 02/23/2023 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO BLOWER DOOR.PDF | |||
| BADMIN | INFORMATION | 10/17/2022 | 10/17/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO PROD APP.PDF | |||
| BLD | COMPLETE | 10/17/2022 | 10/17/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/22/2022 | 06/22/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/08/2022 | 06/09/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/07/2022 | 06/07/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Repeat Comment 1. The engineer’s digital signature is not verifiable on the letter submitted. Copies of an Engineers seal is not acceptable. Please submit a hard copy to the City of Palm Coast. Florida Administrative Code 61G15-23.001(1) | |||
| BLD | COMPLETE | 05/17/2022 | 05/18/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/30/2022 | 03/31/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/30/2022 | 03/30/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 03/30/2022 | 03/31/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/30/2022 | 03/30/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM No zoning changes | |||
| MECH | COMPLETE | 03/30/2022 | 03/30/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/10/2022 | 03/10/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/10/2022 | 03/10/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 01/28/2022 | 01/28/2022 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM A septic tank permit is required. (from the health department) | |||
| BADMIN | COMPLETE | 01/28/2022 | 01/28/2022 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/27/2022 | 01/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/11/2022 | 01/13/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: Second Request 1. Resubmit a completed City of Palm Coast Roofing Worksheet. Worksheet submitted is incomplete. Provide Product Approvals for underlayment and concrete tile. 2. Product Approval for wood connectors and wood anchors. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| CUSVC | COMPLETE | 01/11/2022 | 01/18/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 01/11/2022 | 01/12/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/11/2022 | 01/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/11/2022 | 01/12/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/11/2022 | 01/12/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/11/2022 | 01/19/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/11/2022 | 01/11/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site plan : materials for entry are of home | |||
| ZON | COMPLETE | 01/11/2022 | 01/11/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/22/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/22/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/22/2023 |
| CONNECTION FEES | ¤25.00 | 01/31/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 01/31/2022 |
| IMPACT FEE FIRE | ¤388.65 | 01/31/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 01/31/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/31/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 01/31/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 01/31/2022 |
| SURCHARGE FS 533.721 | ¤15.10 | 01/31/2022 |
| SURCHARGE - FS 468.631 | ¤22.65 | 01/31/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/31/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/31/2022 |
| SW ENG PRE APRON | ¤30.00 | 01/31/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/31/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/31/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 01/31/2022 |
| SEWER INSPECTION | ¤25.00 | 01/31/2022 |
| SITE PLAN 30 | ¤30.00 | 01/31/2022 |
| METER - DEPOSIT | ¤60.00 | 01/31/2022 |
| WATER-METER | ¤467.09 | 01/31/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/31/2022 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 01/31/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 01/31/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,050.09 |