Permit #2022010623

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01490-0180
CONDITIONED SPACE: 2295 sqft
GARAGE: 538 sqft
OPENED PORCH (WITH ROOF) : 201 sqft
OPENED PORCH (WITH ROOF) : 229 sqft
Total Square Footage: 3263 sqft
Block: 01490
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 321-501-4617
Location Address: 35 EDITH POPE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/17/2022
NOC: RECORDED
Applicant name: JAMES FUCETOLA III
Owner: PALM COAST COMMUNITIES, LLC

Address

PO BOX 22547

SAT SIMONS, GA 31522

Lot: 0180
Contracted Stated Job Value: ¤215,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PALM COAST COMMUNITIES LLC
Status Location Address State License Number Phone
INACTIVE

PO BOX 22547

PALM COAST, FL 32164

CBC1262878 (Exp: 08/31/2026) 321-501-4617

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/09/2022 FINAL APPROVED TSTAUFFACHER
ROW - FINAL APRON (AFTER POUR) 08/09/2022 APPROVED PFLANAGAN
ROW - STORMWATER FINAL 08/09/2022 APPROVED - AS NOTED PFLANAGAN
Note: NOTE TO INSPECTOR NEED TO MAKE SURE THAT ALL WATER IS NOT GOING INTO PEP TANK --------------------------------------------------------------------------------------------------------------------------------- 8/9/22 PEP TANK IS FIXED PASSING A NOTED CM NEED TO PUT SOD DOWN IN RIGHT OF WAY BECAUSE OF DUMPSTER AND PORTER JOHN
U -UTILITY RESIDENTIAL FINAL 08/09/2022 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 08/08/2022 Disapproved - NO FEE PFLANAGAN
Note: NEED TO MAKE THE DRAINAGE AT PEP TANK GO AROUND IT NOT OVER IT INLESS YOU GET A LID THAT IS SEALED It will not be permissible for any drainage feature to directly discharge into a sanitary system. (C) PEP Tank lid elevations must be greater than the adjacent sod elevation.oDrainage features must be contoured around, not over, the PEP tank lid. Design and Specifications Guidelines for Low Pressure Sewer Systems, FDEP, June 1981, Chapter ,(A)(8)
ROW FIELD SURVEY /GRADING CERTIFICATION 08/08/2022 APPROVED PFLANAGAN
Note: 8/8/22 TALK CM AND HE IS GOING TO REROUTE THE WATER AROUND PEP TANK PASSING AS NOTED SO THEY CAN CALL ALL THE FINAL INSPECTIONS WE WILL MAKE SURE IT IS DONE BEFORE PASS THE FINAL ROW. ---------------------------------------------------------------------------------------------------------------------------- NEED TO MAKE THE DRAINAGE AT PEP TANK GO AROUND IT NOT OVER IT INLESS YOU GET A LID THAT IS SEALED It will not be permissible for any drainage feature to directly discharge into a sanitary system. (C) PEP Tank lid elevations must be greater than the adjacent sod elevation.oDrainage features must be contoured around, not over, the PEP tank lid. Design and Specifications Guidelines for Low Pressure Sewer Systems, FDEP, June 1981, Chapter ,(A)(8)
FINAL SURVEY (OFFICE USE ONLY) 08/08/2022 APPROVED PFLANAGAN
U-CROSS CONNECTION 07/29/2022 APPROVED DHANEY
ELECTRIC - EARLY POWER 07/19/2022 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:09 am
U - SEWER TIE IN 07/13/2022 APPROVED KSANDOE
ROW- PRE-APRON (PRE-POUR) 06/29/2022 APPROVED - AS NOTED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE ELEVATION OF CULVERT PIPE BEFORE POUR CONCRETE
ROW- PRE-APRON (PRE-POUR) 06/28/2022 CANCELLED BY APPLICANT PFLANAGAN
PEP TANK INSTALLATION REQUEST 06/02/2022 APPROVED CSTONE
INSULATION 05/26/2022 APPROVED JWALKER
ALL ROUGH 05/20/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION Contractor asked if inspector could meet at the job to go over what is needed for All rough inspection.
ALL ROUGH 05/17/2022 Disapproved - NO FEE JWALKER
Note: Contractor asked if inspector could meet at the job to go over what is needed for All rough inspection.
LATH/BRICK/ WATER BARRIER 05/12/2022 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/06/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/04/2022 CANCELLED BY APPLICANT AWS_IVR
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Need a full set of approved drawings and the truss engineering packet on site for inspection. Unable to inspect tie downs, bracing and engineering. Was able to walk roof sheating . Roof sheating passes. inspection Down Cells pass inspection., 4.26.22 - Truss T21 - No strap @ front CMU wall end T03 - No strap @ Front entry CMU wall end 4/29/22 The bearing wall garage area. Missing all SP4 hold down anchors. None of the truss lading on the bearing wall have hold down anchors installed.Have engineer supplies detail for truss to bearing wall connections. As well as bearing wall height and required blocking for wall over 8' Truss TGO1 above the front entry area has no connectors, have engineering provide details on how this gride truss is to connect to the CMU wall. The valley overframing garage area missing H 2.5 anchors.
ROOF VALLEY & METAL 05/03/2022 APPROVED JWALKER
ELECTRIC TEMP POLE 05/03/2022 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 2:20 PM
ELECTRIC TEMP POLE 04/29/2022 Disapproved - NO FEE MKRASKI
Note: Temp pole needs bracing
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/29/2022 Disapproved - NO FEE JWALKER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Need a full set of approved drawings and the truss engineering packet on site for inspection. Unable to inspect tie downs, bracing and engineering. Was able to walk roof sheating . Roof sheating passes. inspection Down Cells pass inspection., 4.26.22 - Truss T21 - No strap @ front CMU wall end T03 - No strap @ Front entry CMU wall end 4/29/22 The bearing wall garage area. Missing all SP4 hold down anchors. None of the truss lading on the bearing wall have hold down anchors installed.Have engineer supplies detail for truss to bearing wall connections. As well as bearing wall height and required blocking for wall over 8' Truss TGO1 above the front entry area has no connectors, have engineering provide details on how this gride truss is to connect to the CMU wall. The valley overframing garage area missing H 2.5 anchors.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/26/2022 Disapproved -FEE REQUIRED DCUSHING
Note: THIS IS A REINSPECTION Need a full set of approved drawings and the truss engineering packet on site for inspection. Unable to inspect tie downs, bracing and engineering. Was able to walk roof sheating . Roof sheating passes. inspection Down Cells pass inspection., 4.26.22 - Truss T21 - No strap @ front CMU wall end T03 - No strap @ Front entry CMU wall end
WALL SHEATHING 04/25/2022 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/25/2022 Disapproved - NO FEE JWALKER
Note: Need a full set of approved drawings and the truss engineering packet on site for inspection. Unable to inspect tie downs, bracing and engineering. Was able to walk roof sheating . Roof sheating passes. inspection Down Cells pass inspection.,
FOUND SURVEY APPROVED (OFFICE) 04/21/2022 APPROVED TBAKER
TIE BEAM / LINTEL 04/11/2022 APPROVED LMILLER
MONOLITHIC SLAB 03/29/2022 APPROVED RMARTIN
GRAVITY SEWER TEST 03/25/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION Cannot pass due to the 3" quarter bend used noted in rough plumbing inspection. The fitting will need to be corrected and system refilled.
PLUMBING 1ST ROUGH UNDERGROUND 03/25/2022 APPROVED JWALKER
Note: THIS IS A REINSPECTION 3" quarter bend cannot be used hoizontal to horizontal
GRAVITY SEWER TEST 03/24/2022 Disapproved - NO FEE JWALKER
Note: Cannot pass due to the 3" quarter bend used noted in rough plumbing inspection. The fitting will need to be corrected and system refilled.
PLUMBING 1ST ROUGH UNDERGROUND 03/24/2022 Disapproved - NO FEE JWALKER
Note: 3" quarter bend cannot be used hoizontal to horizontal
WATER METER INSTALLATION REQUEST 03/02/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 2/25/2022 8:19:09 AM lot not cleared
WATER METER INSTALLATION REQUEST 02/23/2022 Disapproved - NO FEE CSTONE
Note: lot not cleared

Review History

Department Status Date In Date Out
BADMIN INFORMATION 07/28/2022 07/28/2022
Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.)
ENGIN1 COMPLETE 04/21/2022 04/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/21/2022 04/21/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 02/14/2022 02/15/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ELEC COMPLETE 02/14/2022 02/15/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 02/14/2022 02/15/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD HOLD 01/14/2022 01/14/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM 1. Sheet 1of 6: a. Provide components and cladding pressure zones per FBCR 7th Ed. Figure R301.2 (7). 2. Product Approval Specification Sheet per F.S. 553.842: a. FL 10852 - for wood connectors shows (2) same numbers which are incorrect. Delete these FL No. and keep the correct FL 10456.
CUSVC COMPLETE 01/14/2022 01/19/2022
Note: Released By: HALEIGH HAND - -
ELEC HOLD 01/14/2022 01/19/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need service outlet by A/C unit NEC 2017 210.63
ENGIN1 COMPLETE 01/14/2022 01/14/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 01/14/2022 01/21/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 01/14/2022 01/18/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 01/14/2022 01/20/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON COMPLETE 01/14/2022 01/14/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 01/14/2022 03/10/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 08/09/2022
WATER -IRRIGATION INSPECTION ¤25.00 03/28/2022
METER - DEPOSIT ¤60.00 03/28/2022
WATER-METER ¤467.09 03/28/2022
WATER- TURN ON ¤25.00 03/28/2022
WATER- TURN ON ¤25.00 02/17/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/17/2022
INSPECTION - RESIDENTIAL ¤808.50 02/17/2022
PLAN REVIEW - RESIDENTIAL ¤229.32 02/17/2022
METER - DEPOSIT ¤60.00 02/17/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 02/17/2022
SURCHARGE FS 533.721 ¤11.26 02/17/2022
SURCHARGE - FS 468.631 ¤16.89 02/17/2022
SW ENG - FOUNDATION SURVEY ¤20.00 02/17/2022
SW ENG INSPECTION 80 ¤80.00 02/17/2022
SW ENG PRE APRON ¤30.00 02/17/2022
SW ENG - REVIEW 20 ¤20.00 02/17/2022
SW ENG RES REVIEW 200 ¤200.00 02/17/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 02/17/2022
SEWER CREDIT (¤2,465.75) 02/17/2022
SEWER INSPECTION ¤25.00 02/17/2022
SEWER CAPITAL FACILITY ¤4,939.76 02/17/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 02/17/2022
SITE PLAN 30 ¤30.00 02/17/2022
CONNECTION FEES ¤1,077.88 02/17/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 02/17/2022
IMPACT FEE FIRE ¤388.65 02/17/2022
IMPACT FEE PARKS ¤1,455.13 02/17/2022
IMPACT FEE SCHOOL ¤3,600.00 02/17/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 02/17/2022
WATER -IRRIGATION INSPECTION ¤25.00 02/17/2022
Fees Total Due: ¤0.00 Total Paid: ¤16,506.00