I want to search for...

Permit #2022010629

Permit Details

Status: COED

Parcel Id: 07-11-31-7012-00120-0590
CONDITIONED SPACE: 1821 sqft
GARAGE: 478 sqft
OPENED PORCH (WITH ROOF) : 120 sqft
OPENED PORCH (WITH ROOF) : 30 sqft
Total Square Footage: 2449 sqft
Block: 00120
Subdivision: 2187 - SECTION 12-BELLE TERRE
Job Phone: 321-501-4617
Location Address: 8 BALLENGER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/11/2022
NOC: RECORDED
Applicant name: JAMES FUCETOLA III
Owner: PALM COAST COMMUNITIES LLC

Address

PO BOX 22547

ST SIMONS ISLAND, GA 31522

Lot: 0590
Contracted Stated Job Value: ¤165,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PALM COAST COMMUNITIES LLC
Status Location Address State License Number Phone
INACTIVE

PO BOX 22547

PALM COAST, FL 32164

CBC1262878 (Exp: 08/31/2026) 321-501-4617

Sub Contractors

JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/07/2022 FINAL APPROVED KSANDOE
Note: 12/2/2022 - PREVIOUS INSPECTION NOTES No hot water in house. Garage door bucking anchor bolts have been cut off and need to be replaced
BLD - BUILDING FINAL 12/02/2022 Disapproved - NO FEE KSANDOE
Note: No hot water in house. Garage door bucking anchor bolts have been cut off and need to be replaced
U -UTILITY RESIDENTIAL FINAL 12/01/2022 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 11/30/2022 FINAL APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/30/2022 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 11/30/2022 APPROVED EMADISON
ROW - STORMWATER FINAL 11/30/2022 FINAL APPROVED EMADISON
U-CROSS CONNECTION 11/16/2022 APPROVED DHANEY
U - SEWER TIE IN 10/19/2022 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 09/15/2022 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 9:50 AM
ROW- PRE-APRON (PRE-POUR) 08/30/2022 APPROVED GBERTOLA
Note: 08/30/22=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ....................................................................................................................................................................................................................... ** 08/29/22 POUR ARERA AROUND PIPE IS BUTTER SOFT FOOT SINKS 4-6 INCHES INTO MUD TO MUCH WATER IN POUR AREA FOOTER ENDS ARE FULL MOF WATER FLOWING THROUGHT PIPE. NO FEE DUE TO RAIN EARLIER IN DAY ** CULVERT PIPE ELEVATION WITHIN TOLERANCE AT THE TIME OF THIS INSPECTION
ROW- PRE-APRON (PRE-POUR) 08/29/2022 Disapproved - NO FEE EMADISON
Note: ** 08/29/22 POUR ARERA AROUND PIPE IS BUTTER SOFT FOOT SINKS 4-6 INCHES INTO MUD TO MUCH WATER IN POUR AREA FOOTER ENDS ARE FULL MOF WATER FLOWING THROUGHT PIPE. NO FEE DUE TO RAIN EARLIER IN DAY ** CULVERT PIPE ELEVATION WITHIN TOLERANCE AT THE TIME OF THIS INSPECTION
INSULATION 08/01/2022 APPROVED RMARTIN
ALL ROUGH 07/25/2022 APPROVED RMARTIN
LATH/BRICK/ WATER BARRIER 05/23/2022 APPROVED FWILLIS
ROOF VALLEY & METAL 05/17/2022 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/13/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please have a full set of approved drawings , Including truss layout , and the truss engineering packet onsite for inspection. Walked the roof, roof sheating passed inspection. Down cells pass inspection. 5/12/22 - MULTIPLE TRADES WORKING AT THE TIME OF MY VISIT. TO MANY TRIP HAZARDS TO THOROUGHLY INSPECT. **ALSO APPROVED MINI PLANS IN BOX MISSING PAGES. 5/13/22 - SIDE NOTE: WALL SHEATHING INSPECTION NEEDED BEFORE COVERING.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/12/2022 Disapproved - NO FEE FWILLIS
Note: THIS IS A REINSPECTION Please have a full set of approved drawings , Including truss layout , and the truss engineering packet onsite for inspection. Walked the roof, roof sheating passed inspection. Down cells pass inspection. 5/12/22 - MULTIPLE TRADES WORKING AT THE TIME OF MY VISIT. TO MANY TRIP HAZARDS TO THOROUGHLY INSPECT. **ALSO APPROVED MINI PLANS IN BOX MISSING PAGES.
WALL SHEATHING 05/10/2022 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/10/2022 Disapproved -FEE REQUIRED JWALKER
Note: Please have a full set of approved drawings , Including truss layout , and the truss engineering packet onsite for inspection. Walked the roof, roof sheating passed inspection. Down cells pass inspection.
ROOF SHEATHING 05/06/2022 APPROVED FWILLIS
TIE BEAM / LINTEL 04/29/2022 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 04/25/2022 APPROVED TBAKER
WATER METER INSTALLATION REQUEST 04/20/2022 APPROVED CSTONE
MONOLITHIC SLAB 04/19/2022 APPROVED FWILLIS
Note: THIS IS A REINSPECTION REBAR COVERED WITH DIRT IN AREAS, CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4 REBAR SUBMERGED IN WATER IN AREAS. 4/19/22 - ITEMS CORRECTED
MONOLITHIC SLAB 04/18/2022 Disapproved -FEE REQUIRED FWILLIS
Note: REBAR COVERED WITH DIRT IN AREAS, CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4 REBAR SUBMERGED IN WATER IN AREAS.
PLUMBING 1ST ROUGH UNDERGROUND 04/12/2022 APPROVED KSANDOE
GRAVITY SEWER TEST 04/12/2022 APPROVED KSANDOE
WATER METER INSTALLATION REQUEST 02/23/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 11/28/2022 11/28/2022
Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM NOC expired. Unable to process Final Survey. Need updated NOC and need to resubmit final survey.
ENGIN1 COMPLETE 04/25/2022 04/25/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/25/2022 04/25/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 02/03/2022 02/07/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BADMIN HOLD 02/02/2022 02/02/2022
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM PROD APP SHEET BLANK
BADMIN COMPLETE 02/02/2022 02/02/2022
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
BLD HOLD 01/14/2022 01/14/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM 1. Sheet 1of 6: a. Provide components and cladding pressure zones per FBCR 7th Ed. Figure R301.2 (7). 2. Product Approval Specification Sheet per F.S. 553.842: a. FL 10852 - for wood connectors shows (2) same numbers which are incorrect. Delete these FL No. and keep the correct FL 10456.
CUSVC COMPLETE 01/14/2022 01/19/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 01/14/2022 01/19/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/14/2022 01/14/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 01/14/2022 01/19/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 01/14/2022 01/18/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 01/14/2022 01/20/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON COMPLETE 01/14/2022 01/14/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 01/14/2022 03/10/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 12/14/2022
REINSPECTION RESIDENTIAL ¤40.00 12/14/2022
CONNECTION FEES ¤1,077.88 02/11/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 02/11/2022
IMPACT FEE FIRE ¤388.65 02/11/2022
IMPACT FEE PARKS ¤1,455.13 02/11/2022
IMPACT FEE SCHOOL ¤3,600.00 02/11/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 02/11/2022
WATER -IRRIGATION INSPECTION ¤25.00 02/11/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 02/11/2022
SURCHARGE FS 533.721 ¤8.87 02/11/2022
SURCHARGE - FS 468.631 ¤13.31 02/11/2022
SW ENG - FOUNDATION SURVEY ¤20.00 02/11/2022
SW ENG INSPECTION 80 ¤80.00 02/11/2022
SW ENG PRE APRON ¤30.00 02/11/2022
SW ENG - REVIEW 20 ¤20.00 02/11/2022
SW ENG RES REVIEW 200 ¤200.00 02/11/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 02/11/2022
SEWER CREDIT (¤1,147.00) 02/11/2022
SEWER INSPECTION ¤25.00 02/11/2022
SEWER CAPITAL FACILITY ¤4,939.76 02/11/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 02/11/2022
SITE PLAN 30 ¤30.00 02/11/2022
METER - DEPOSIT ¤60.00 02/11/2022
WATER- TURN ON ¤25.00 02/11/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/11/2022
INSPECTION - RESIDENTIAL ¤627.00 02/11/2022
PLAN REVIEW - RESIDENTIAL ¤177.84 02/11/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,048.71