Permit #2022010763
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00190-0130 |
| CONDITIONED SPACE: 3154 sqft |
| GARAGE: 578 sqft |
| OPENED PORCH (WITH ROOF) : 78 sqft |
| OPENED PORCH (WITH ROOF) : 216 sqft |
| OPENED PORCH (WITH ROOF) : 39 sqft |
| Total Square Footage: 4065 sqft |
| Block: 00190 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: (386) 246-6123 |
| Location Address: 5 ZITHER CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/25/2022 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PKWY PALM COAST, FL 32164 |
|
Address STE 7 PALM COAST, FL 32164 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤332,709.00 |
| Job Description: SINGLE FAMIYL RESIDENCE |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/19/2023 | FINAL APPROVED | RSIMS |
| Note: 5/17/2023 - PREVIOUS INSPECTION NOTES 5/17/23: House is locked up tight and no key on site. 5/16/2023 - PREVIOUS INSPECTION NOTES 5/16/23: 1). 2nd floor right front bedroom smoke detector is not working properly. (& not interconnected). 2). Oven anti-tip device is not anchored securely. (need 2 anchors into bottom plate). | |||
| BLD - BUILDING FINAL | 05/17/2023 | Disapproved - NO FEE | RSIMS |
| Note: 5/17/23: House is locked up tight and no key on site. 5/16/2023 - PREVIOUS INSPECTION NOTES 5/16/23: 1). 2nd floor right front bedroom smoke detector is not working properly. (& not interconnected). 2). Oven anti-tip device is not anchored securely. (need 2 anchors into bottom plate). | |||
| BLD - BUILDING FINAL | 05/16/2023 | Disapproved - NO FEE | RSIMS |
| Note: 5/16/23: 1). 2nd floor right front bedroom smoke detector is not working properly. (& not interconnected). 2). Oven anti-tip device is not anchored securely. (need 2 anchors into bottom plate). | |||
| ROW - FINAL APRON (AFTER POUR) | 04/28/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - STORMWATER FINAL | 04/28/2023 | APPROVED | GBERTOLA |
| Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U -UTILITY RESIDENTIAL FINAL | 04/26/2023 | FINAL APPROVED | JHARDING |
| U-CROSS CONNECTION | 04/26/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/14/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/14/2023 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 03/08/2023 | APPROVED | EMADISON |
| Note: ** 03/08/23 READY TO POUR IN THE EVENT OF RAIN RECHECK CULVERT AND COMPACTION ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 03/07/2023 | APPROVED | RSIMS |
| Note: 3/7/23: Front door was wide open with a fresh paint lid lying outside of the door & what appeared to be freshly painted doors inside. 3/3/2023 - PREVIOUS INSPECTION NOTES 3/3/23: Range feed now has a damaged insulating jacket inside the wall above the lath. Once repaired it will also need a nail plate to protect from damage during drywall repair. 2/28/2023 - PREVIOUS INSPECTION NOTES 2/28/23: 1). Individual unsheathed conductors are outside of the Range outlet. Need to be fully into box or covered with conduit/sealtite. | |||
| ELECTRIC - EARLY POWER | 03/03/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 3/3/23: Range feed now has a damaged insulating jacket inside the wall above the lath. Once repaired it will also need a nail plate to protect from damage during drywall repair. 2/28/2023 - PREVIOUS INSPECTION NOTES 2/28/23: 1). Individual unsheathed conductors are outside of the Range outlet. Need to be fully into box or covered with conduit/sealtite. | |||
| ELECTRIC - EARLY POWER | 02/28/2023 | Disapproved - NO FEE | RSIMS |
| Note: 2/28/23: 1). Individual unsheathed conductors are outside of the Range outlet. Need to be fully into box or covered with conduit/sealtite. | |||
| GRAVITY SEWER TEST | 02/10/2023 | APPROVED | RSIMS |
| U - SEWER TIE IN | 02/10/2023 | APPROVED | RSIMS |
| PEP TANK INSTALLATION REQUEST | 01/06/2023 | APPROVED | CSTONE |
| INSULATION | 12/01/2022 | APPROVED | BTAYLOR |
| Note: 11/30/2022 - PREVIOUS INSPECTION NOTES 11/30/22 1. Garage wall insulation falling out 2. Large hole in upstairs floor decking must be sealed under tub 11/29/2022 - PREVIOUS INSPECTION NOTES 11-29-22 Workers just arrived. | |||
| INSULATION | 11/30/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 11/30/22 1. Garage wall insulation falling out 2. Large hole in upstairs floor decking must be sealed under tub 11/29/2022 - PREVIOUS INSPECTION NOTES 11-29-22 Workers just arrived. | |||
| INSULATION | 11/29/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: 11-29-22 Workers just arrived. | |||
| LATH/BRICK/ WATER BARRIER | 11/29/2022 | APPROVED | BTAYLOR |
| ALL ROUGH | 11/15/2022 | APPROVED | BTAYLOR |
| WINDOW NAILING | 11/15/2022 | APPROVED | BTAYLOR |
| Note: 11/3/2022 - PREVIOUS INSPECTION NOTES 11/3/2022: 1). 1st floor windows not installed per manufacturer's instructions. (Installation instructions not included with plans. / Looked up online as instructed on window sticker.) * 2nd floor flanged windows - Approved 11/1/2022 - PREVIOUS INSPECTION NOTES 11/1/2022: INSPECTION STOPPED. 1). No documents (installation instructions) in permit box. 2). Window trim (screw covers) still in place. Need to be removed for inspection. 3). broken inside window pane - 1st floor * R 107.3,1. Approved Documents need to be on site for inspection. | |||
| WINDOW NAILING | 11/03/2022 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/3/2022: 1). 1st floor windows not installed per manufacturer's instructions. (Installation instructions not included with plans. / Looked up online as instructed on window sticker.) (Please include installation instructions with plans or FPA sheet). * 2nd floor flanged windows - Approved 11/1/2022 - PREVIOUS INSPECTION NOTES 11/1/2022: INSPECTION STOPPED. 1). No documents (installation instructions) in permit box. 2). Window trim (screw covers) still in place. Need to be removed for inspection. 3). broken inside window pane - 1st floor * R 107.3,1. Approved Documents need to be on site for inspection. | |||
| WINDOW NAILING | 11/01/2022 | Disapproved - NO FEE | RSIMS |
| Note: 11/1/2022: INSPECTION STOPPED. 1). No documents (installation instructions) in permit box. 2). Window trim (screw covers) still in place. Need to be removed for inspection. 3). broken inside window pane - 1st floor * R 107.3,1. Approved Documents need to be on site for inspection. | |||
| ROOF VALLEY & METAL | 10/06/2022 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/22/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 6/29/22 F13 and the F-12 missing strapping per plan meta 18 are to be 24" o.c. Floor trusses to bearing wall connection are missing all HTS20 detail page 6.1 All bearing wall missing SP4 bottom and top. Mid way blocking not installed.Missing CS20 at headers. Missing all truss connectors. See detail Page 9.1 bearing wall. 2nd floor Header opening missing all MSTA anchors at the floor. also at the jack post 4 corners. Rods have not been installed at wall above LVL beam below please provide detail on beam to wall above connection. Due to multiple missing anchors THIS INSPECTION HAS BEEN STOPPED. Roof sheating was bumped checked and passed. Prints have been highlighted to assists contractor. 07/15/2022: Load bearing walls still missing SP4 and mid wall blocking per plans 7/19/22 LOAD BEARING WALLS STILL MISSING SP4 HIGHLIGHTED ON PLAN DO NOT RE-SCHEDULE UNTIL WORK IS DONE AND YOU WALK JOB TO VERIFY WORK IS DONE 2-20-22 note above not resolved 2-21-22 note above not resolved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/21/2022 | Disapproved - NO FEE | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 6/29/22 F13 and the F-12 missing strapping per plan meta 18 are to be 24" o.c. Floor trusses to bearing wall connection are missing all HTS20 detail page 6.1 All bearing wall missing SP4 bottom and top. Mid way blocking not installed.Missing CS20 at headers. Missing all truss connectors. See detail Page 9.1 bearing wall. 2nd floor Header opening missing all MSTA anchors at the floor. also at the jack post 4 corners. Rods have not been installed at wall above LVL beam below please provide detail on beam to wall above connection. Due to multiple missing anchors THIS INSPECTION HAS BEEN STOPPED. Roof sheating was bumped checked and passed. Prints have been highlighted to assists contractor. 07/15/2022: Load bearing walls still missing SP4 and mid wall blocking per plans 7/19/22 LOAD BEARING WALLS STILL MISSING SP4 HIGHLIGHTED ON PLAN DO NOT RE-SCHEDULE UNTIL WORK IS DONE AND YOU WALK JOB TO VERIFY WORK IS DONE 2-20-22 note above not resolved 2-21-22 note above not resolved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/20/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 6/29/22 F13 and the F-12 missing strapping per plan meta 18 are to be 24" o.c. Floor trusses to bearing wall connection are missing all HTS20 detail page 6.1 All bearing wall missing SP4 bottom and top. Mid way blocking not installed.Missing CS20 at headers. Missing all truss connectors. See detail Page 9.1 bearing wall. 2nd floor Header opening missing all MSTA anchors at the floor. also at the jack post 4 corners. Rods have not been installed at wall above LVL beam below please provide detail on beam to wall above connection. Due to multiple missing anchors THIS INSPECTION HAS BEEN STOPPED. Roof sheating was bumped checked and passed. Prints have been highlighted to assists contractor. 07/15/2022: Load bearing walls still missing SP4 and mid wall blocking per plans 7/19/22 LOAD BEARING WALLS STILL MISSING SP4 HIGHLIGHTED ON PLAN DO NOT RE-SCHEDULE UNTIL WORK IS DONE AND YOU WALK JOB TO VERIFY WORK IS DONE 2-20-22 note above not resolved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/19/2022 | Disapproved - NO FEE | RMARTIN |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 6/29/22 F13 and the F-12 missing strapping per plan meta 18 are to be 24" o.c. Floor trusses to bearing wall connection are missing all HTS20 detail page 6.1 All bearing wall missing SP4 bottom and top. Mid way blocking not installed.Missing CS20 at headers. Missing all truss connectors. See detail Page 9.1 bearing wall. 2nd floor Header opening missing all MSTA anchors at the floor. also at the jack post 4 corners. Rods have not been installed at wall above LVL beam below please provide detail on beam to wall above connection. Due to multiple missing anchors THIS INSPECTION HAS BEEN STOPPED. Roof sheating was bumped checked and passed. Prints have been highlighted to assists contractor. 07/15/2022: Load bearing walls still missing SP4 and mid wall blocking per plans 7/19/22 LOAD BEARING WALLS STILL MISSING SP4 HIGHLIGHTED ON PLAN DO NOT RE-SCHEDULE UNTIL WORK IS DONE AND YOU WALK JOB TO VERIFY WORK IS DONE | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/18/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 6/29/22 F13 and the F-12 missing strapping per plan meta 18 are to be 24" o.c. Floor trusses to bearing wall connection are missing all HTS20 detail page 6.1 All bearing wall missing SP4 bottom and top. Mid way blocking not installed.Missing CS20 at headers. Missing all truss connectors. See detail Page 9.1 bearing wall. 2nd floor Header opening missing all MSTA anchors at the floor. also at the jack post 4 corners. Rods have not been installed at wall above LVL beam below please provide detail on beam to wall above connection. Due to multiple missing anchors THIS INSPECTION HAS BEEN STOPPED. Roof sheating was bumped checked and passed. Prints have been highlighted to assists contractor. 07/15/2022: Load bearing walls still missing SP4 and mid wall blocking per plans | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/15/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION 6/29/22 F13 and the F-12 missing strapping per plan meta 18 are to be 24" o.c. Floor trusses to bearing wall connection are missing all HTS20 detail page 6.1 All bearing wall missing SP4 bottom and top. Mid way blocking not installed.Missing CS20 at headers. Missing all truss connectors. See detail Page 9.1 bearing wall. 2nd floor Header opening missing all MSTA anchors at the floor. also at the jack post 4 corners. Rods have not been installed at wall above LVL beam below please provide detail on beam to wall above connection. Due to multiple missing anchors THIS INSPECTION HAS BEEN STOPPED. Roof sheating was bumped checked and passed. Prints have been highlighted to assists contractor. 07/15/2022: Load bearing walls still missing SP4 and mid wall blocking per plans | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/29/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 6/29/22 F13 and the F-12 missing strapping per plan meta 18 are to be 24" o.c. Floor trusses to bearing wall connection are missing all HTS20 detail page 6.1 All bearing wall missing SP4 bottom and top. Mid way blocking not installed.Missing CS20 at headers. Missing all truss connectors. See detail Page 9.1 bearing wall. 2nd floor Header opening missing all MSTA anchors at the floor. also at the jack post 4 corners. Rods have not been installed at wall above LVL beam below please provide detail on beam to wall above connection. Due to multiple missing anchors THIS INSPECTION HAS BEEN STOPPED. Roof sheating was bumped checked and passed. Prints have been highlighted to assists contractor. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/24/2022 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: THIS IS A REINSPECTION Missing anchor bolts at bearing wall at stairs Missing SP4s at base of header at bottom of stairs Loose threaded rod Cannot verify strapping at LVL on right side F13 missing strapping per plans INSPECTION STOPPED/VERIFY DETAILS PRIOR TO CALLING IN FOR INSPECTION Some items addressed, anchor bolt nuts are only hand tight, check all | |||
| WALL SHEATHING | 06/16/2022 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/16/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Missing anchor bolts at bearing wall at stairs Missing SP4s at base of header at bottom of stairs Loose threaded rod Cannot verify strapping at LVL on right side F13 missing strapping per plans INSPECTION STOPPED/VERIFY DETAILS PRIOR TO CALLING IN FOR INSPECTION | |||
| TIE BEAM / LINTEL | 05/11/2022 | APPROVED | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Several down rods too short to meet 25" min. lap, not visible @ 2nd course of cmu above slab, check allL 05/10/2022: Added bar left of front door in wrong cell and not tied Back right side/additional bar added not tied | |||
| TIE BEAM / LINTEL | 05/10/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION Several down rods too short to meet 25" min. lap, not visible @ 2nd course of cmu above slab, check allL 05/10/2022: Added bar left of front door in wrong cell and not tied Back right side/additional bar added not tied | |||
| TIE BEAM / LINTEL | 05/03/2022 | Disapproved - NO FEE | DCUSHING |
| Note: Several down rods too short to meet 25" min. lap, not visible @ 2nd course of cmu above slab, check all | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/25/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/07/2022 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/05/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/10/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/10/2023 | 02/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/01/2022 | 08/02/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/07/2022 | 07/08/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/25/2022 | 04/25/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/25/2022 | 04/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/19/2022 | 03/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/18/2022 | 01/19/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/18/2022 | 01/24/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 01/18/2022 | 01/19/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/18/2022 | 01/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/18/2022 | 01/21/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/18/2022 | 01/19/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/18/2022 | 01/24/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/18/2022 | 01/20/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 05/19/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/19/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/19/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/19/2023 |
| CONNECTION FEES | ¤1,077.88 | 01/25/2022 |
| METER - DEPOSIT | ¤60.00 | 01/25/2022 |
| WATER- TURN ON | ¤25.00 | 01/25/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/25/2022 |
| INSPECTION - RESIDENTIAL | ¤1,064.25 | 01/25/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤301.86 | 01/25/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 01/25/2022 |
| IMPACT FEE FIRE | ¤388.65 | 01/25/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 01/25/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/25/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/25/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/25/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 01/25/2022 |
| SURCHARGE FS 533.721 | ¤14.63 | 01/25/2022 |
| SURCHARGE - FS 468.631 | ¤21.94 | 01/25/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/25/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/25/2022 |
| SW ENG PRE APRON | ¤30.00 | 01/25/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/25/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/25/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 01/25/2022 |
| SEWER CREDIT | (¤1,147.00) | 01/25/2022 |
| SEWER INSPECTION | ¤25.00 | 01/25/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 01/25/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 01/25/2022 |
| SITE PLAN 30 | ¤30.00 | 01/25/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,921.87 |