Permit #2022010949
Permit Details
Status: COED
| Parcel Id: 07-11-31-7031-00400-0060 |
| CONDITIONED SPACE: 2295 sqft |
| GARAGE: 538 sqft |
| OPENED PORCH (WITH ROOF) : 201 sqft |
| OPENED PORCH (WITH ROOF) : 229 sqft |
| Total Square Footage: 3263 sqft |
| Block: 00400 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: 321-501-4617 |
| Location Address: 25 RICHMOND DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/11/2022 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES, LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤215,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/14/2022 | FINAL APPROVED | JWALKER |
| Note: 12/13/2022 - PREVIOUS INSPECTION NOTES HVAC air handler, rear of AHU has been set tight to the wall no clearance. The right side of the handler does not have the required 3" clearance from the wall. M1305.1.1 Furnaces and air handlers | |||
| U -UTILITY RESIDENTIAL FINAL | 12/14/2022 | FINAL APPROVED | LFITZGERALD |
| Note: 12/13/2022 - PREVIOUS INSPECTION NOTES pep tank with no pump-utility informed | |||
| BLD - BUILDING FINAL | 12/13/2022 | Disapproved - NO FEE | JWALKER |
| Note: HVAC air handler, rear of AHU has been set tight to the wall no clearance. The right side of the handler does not have the required 3" clearance from the wall. M1305.1.1 Furnaces and air handlers | |||
| U -UTILITY RESIDENTIAL FINAL | 12/13/2022 | Disapproved - NO FEE | LFITZGERALD |
| Note: pep tank with no pump-utility informed | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/12/2022 | APPROVED | GBERTOLA |
| ROW - STORMWATER FINAL | 12/12/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 12/12/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/12/2022 | APPROVED | GBERTOLA |
| U-CROSS CONNECTION | 12/09/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ELECTRIC - EARLY POWER | 11/29/2022 | APPROVED | JMUNSON |
| U - SEWER TIE IN | 11/18/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 11/17/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| PEP TANK INSTALLATION REQUEST | 11/02/2022 | APPROVED | CSTONE |
| Note: 10/28/2022 3:31:26 PM- PREVIOUS INSPECTION NOTES dumpster needs to move | |||
| PEP TANK INSTALLATION REQUEST | 10/28/2022 | Disapproved - NO FEE | CSTONE |
| Note: dumpster needs to move | |||
| INSULATION | 10/24/2022 | APPROVED | JWALKER |
| Note: 10/20/2022 - PREVIOUS INSPECTION NOTES Meet with contractor . As listed prior the required blocking at the gable ends needs to be installed per MItek truss specs due to missing details in the job prints. | |||
| INSULATION | 10/20/2022 | Disapproved - NO FEE | JWALKER |
| Note: Meet with contractor . As listed prior the required blocking at the gable ends needs to be installed per MItek truss specs due to missing details in the job prints. | |||
| LATH/BRICK/ WATER BARRIER | 10/19/2022 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 | |||
| ALL ROUGH | 10/17/2022 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Garage bearing wall detail shows Sp2 or 4 at each stud top install missing anchors. Right side of wall. 2. Gable end detail minimum required MII sheet in the mitek truss packet. needs to be installed. Due to missing details on print. 2x blocking and bracing are to be 48" o.c.. Left the detail in the packet drawing circled. | |||
| ALL ROUGH | 10/12/2022 | Disapproved - NO FEE | JWALKER |
| Note: 1 Garage bearing wall detail shows Sp2 or 4 at each stud top and bottom install all missing anchors. 3 Gable end detail minimum required MII sheet in the mitek truss packet. needs to be installed. Due to missing details on print. 2x blocking and bracing are to be 48" o.c.. Left the detail in the packet drawing circled. Check for install at ALL ROUGH. Items listed above have not been corrected. 5' head test not installed. Missing nail plates. Garage wall PVC plumbing line, Master bath 1 1/2 pvc vent line. UFB wire kitchen wall and kneewall. The kitchen wall at the mirowave exhaust duct needs to be supported right side and install Nail plated at the duct top plate. | |||
| ROOF VALLEY & METAL | 06/24/2022 | APPROVED | JWALKER |
| ROOF SHEATHING | 06/22/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION The right and left side hip roofs. The vertically installed sheets are not staggered and run 3 rows high. R803.2.3 Installation. Wood structural panel used as roof sheathing shall be installed with joints staggered. | |||
| WALL SHEATHING | 06/22/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/22/2022 | APPROVED - AS NOTED | JWALKER |
| Note: 1 Garage bearing wall detail shows Sp2 or 4 at each stud top and bottom install all missing anchors. 3 Gable end detail minimum required MII sheet in the mitek truss packet. needs to be installed. Due to missing details on print. 2x blocking and bracing are to be 48" o.c.. Left the detail in the packet drawing circled. Check for install at ALL ROUGH. | |||
| ROOF SHEATHING | 06/16/2022 | Disapproved - NO FEE | JWALKER |
| Note: The right and left side hip roofs. The vertically installed sheets are not staggered and run 3 rows high. R803.2.3 Installation. Wood structural panel used as roof sheathing shall be installed with joints staggered. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/16/2022 | Disapproved - NO FEE | JWALKER |
| Note: 1 Garage bearing wall detail shows Sp2 or 4 at each stud top and bottom install all missing anchors. 2 Truss TGO1 girder calls for HTU26 truss hanges for the 3 T15 trusses. Marked the engineering packet. 3 Gable end detail minimum required MII sheet in the mitek truss packet. needs to be installed. Due to missing details on print. 2x blocking and bracing are to be 48" o.c.. Left the detail in the packet drawing circled. 4 The right and left side hip roofs. The vertically installed sheets are not staggered and run 3 rows high. R803.2.3 Installation. Wood structural panel used as roof sheathing shall be installed with joints staggered. | |||
| WALL SHEATHING | 06/16/2022 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 06/15/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/31/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please have a full set of approved prints onsite for inspections. 5/27/22 Down cells have been plywooded up. Unabe to see dowels Remove all plywood from down cells for inspection. | |||
| TIE BEAM / LINTEL | 05/27/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: THIS IS A REINSPECTION Please have a full set of approved prints onsite for inspections. 5/27/22 Down cells have been plywooded up. Unabe to see dowels Remove all plywood from down cells for inspection. | |||
| TIE BEAM / LINTEL | 05/26/2022 | Disapproved - NO FEE | JWALKER |
| Note: Please have a full set of approved prints onsite for inspections. | |||
| MONOLITHIC SLAB | 05/02/2022 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/28/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 04/28/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 04/01/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/15/2022 | 06/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/15/2022 | 06/15/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/13/2022 | 06/13/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM rename to foundation survey.pdf only | |||
| ELEC | COMPLETE | 03/03/2022 | 03/03/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/24/2022 | 02/24/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/24/2022 | 02/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 02/24/2022 | 02/24/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlet by A/C NEC 2017 210.63. Outlet on the plan says 220 volt it has to be a 120 volt. 2nd REQUEST | |||
| SW1 | COMPLETE | 02/24/2022 | 03/02/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/21/2022 | 01/24/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Provide design pressures for windows and doors per R301.2 | |||
| CUSVC | COMPLETE | 01/21/2022 | 01/26/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 01/21/2022 | 01/24/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlet by A/C NEC 2017 210.63 | |||
| ENGIN1 | COMPLETE | 01/21/2022 | 01/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/21/2022 | 01/24/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/21/2022 | 01/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/21/2022 | 01/28/2022 |
| Note: Held By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/21/2022 | 01/24/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM entrance walk way is missing on siteplan. Also include the dimenisons | |||
| SWALE | COMPLETE | 01/21/2022 | 03/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/14/2022 |
| CONNECTION FEES | ¤1,077.88 | 03/11/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 03/11/2022 |
| IMPACT FEE FIRE | ¤388.65 | 03/11/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 03/11/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/11/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 03/11/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/11/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 03/11/2022 |
| SURCHARGE FS 533.721 | ¤11.26 | 03/11/2022 |
| SURCHARGE - FS 468.631 | ¤16.89 | 03/11/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/11/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/11/2022 |
| SW ENG PRE APRON | ¤30.00 | 03/11/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/11/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/11/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 03/11/2022 |
| SEWER CREDIT | (¤2,129.67) | 03/11/2022 |
| SEWER INSPECTION | ¤25.00 | 03/11/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 03/11/2022 |
| WATER CREDIT | (¤463.43) | 03/11/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 03/11/2022 |
| SITE PLAN 30 | ¤30.00 | 03/11/2022 |
| METER - DEPOSIT | ¤60.00 | 03/11/2022 |
| WATER- TURN ON | ¤25.00 | 03/11/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/11/2022 |
| INSPECTION - RESIDENTIAL | ¤808.50 | 03/11/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤229.32 | 03/11/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,801.56 |