Permit #2022010980
Permit Details
Status: COED
| Parcel Id: 07-11-31-7031-00120-0010 |
| CONDITIONED SPACE: 2000 sqft |
| GARAGE: 476 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| Total Square Footage: 2817 sqft |
| Block: 00120 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: 321-501-4617 |
| Location Address: 54 RIDDLE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/04/2022 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤195,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/19/2022 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Energy calculations need to be onsite for final AHU heat accessory label not affixed to AHU panel and marked off. RBC M-1303 Seal the ceiling in the AHU closet where the thermostat wire passes through. R-302.9 The outdoor A/C unit is to be set 3" above surrounding ground. RBC M-1305.1.4.1 | |||
| ROW - STORMWATER FINAL | 09/14/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION 9/12/22 NEED TO CLEAN CULVERT PIPE BETTER need to clean the culvert pipe both end | |||
| U -UTILITY RESIDENTIAL FINAL | 09/12/2022 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 09/12/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 9/12/22 NEED TO CLEAN CULVERT PIPE BETTER need to clean the culvert pipe both end | |||
| BLD - BUILDING FINAL | 09/12/2022 | Disapproved - NO FEE | JWALKER |
| Note: Energy calculations need to be onsite for final AHU heat accessory label not affixed to AHU panel and marked off. RBC M-1303 Seal the ceiling in the AHU closet where the thermostat wire passes through. R-302.9 The outdoor A/C unit is to be set 3" above surrounding ground. RBC M-1305.1.4.1 | |||
| ROW - FINAL APRON (AFTER POUR) | 09/09/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/09/2022 | APPROVED | GBERTOLA |
| Note: 09/09/22=correction were made INEEDTHE NEW ELEAVATION ADD ON THE FINAL SURVEY AFTERTHE FINISH RE GRADING THE SWALE ON RICKENBACKER DR | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/09/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/31/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: INEEDTHE NEW ELEAVATION ADD ON THE FINAL SURVEY AFTERTHE FINISH RE GRADING THE SWALE ON RICKENBACKER DR | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/30/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: CHECK FINAL SURVEY . FOR DETAIL= LOW SPOT ON THE RIGHT SIDE BY THE PROPERTY LINE MARK BY A RED SQUARE SWALE IS GOING FROM 25.95 TO 26.00- 26.15 WATER IS NOT GOING TO FLOW THAT WAY | |||
| U-CROSS CONNECTION | 08/29/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ELECTRIC - EARLY POWER | 08/05/2022 | Disapproved - NO FEE | JMUNSON |
| Note: Top of the meter can needs to be sealed | |||
| ELECTRIC - EARLY POWER | 08/05/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Top of the meter can needs to be sealed Emailed FPL at 12:43 pm | |||
| U - SEWER TIE IN | 07/27/2022 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 07/26/2022 | APPROVED - AS NOTED | RGROSS |
| Note: Heavy rain in the forecast. Builder should double check elevations before pouring. | |||
| PEP TANK INSTALLATION REQUEST | 06/28/2022 | APPROVED | CSTONE |
| INSULATION | 06/16/2022 | APPROVED | JWALKER |
| ALL ROUGH | 06/14/2022 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 05/25/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 05/24/2022 | CANCELLED BY APPLICANT | JWALKER |
| ROOF VALLEY & METAL | 05/20/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/12/2022 | APPROVED - AS NOTED | JWALKER |
| Note: 5/12/22 Install anchor bolts at each side of the garage door opening bottom plate. Missing H 2.5 hold down anchors at rear porch, valley over framing. Truss T-09 missed engineering. Marked the packet for location. | |||
| ROOF SHEATHING | 05/10/2022 | APPROVED | JWALKER |
| WALL SHEATHING | 05/05/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/05/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Missing engineering packet. Workers were in the process of coveing the roof with underlayment. Stopped the work. The roof sheating has not been nailed as per details. on page 5 of 6 of the prints. 4" o.c. at the the edges and 6" o.c. in the field. Remove all underlayment and nail roof sheating as per details. A quick walk through of the site. The bearing wall ends are not properly installed. P.T. 2x4 will need to be installed and fastened tightly against the CMU. Check all hold down anchors before reinspection to avoid further fees. | |||
| TIE BEAM / LINTEL | 04/22/2022 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 04/21/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/06/2022 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 03/31/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION Roots in the footing in 2 areas. Marked the drawing for the locations. Stumps and roots shall be removed from the soil to a depth of not less than 12 inches (305 mm) below the surface of the ground in the area to be occupied by the building. FBR 3304. The slab depth is to be a minimum of 3 1/2 " left sting lines in place dig out and tamp shallow areas. | |||
| MONOLITHIC SLAB | 03/30/2022 | Disapproved - NO FEE | JWALKER |
| Note: Roots in the footing in 2 areas. Marked the drawing for the locations. Stumps and roots shall be removed from the soil to a depth of not less than 12 inches (305 mm) below the surface of the ground in the area to be occupied by the building. FBR 3304. The slab depth is to be a minimum of 3 1/2 " left sting lines in place dig out and tamp shallow areas. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/28/2022 | APPROVED | JWALKER |
| GRAVITY SEWER TEST | 03/28/2022 | APPROVED | JWALKER |
| WATER METER INSTALLATION REQUEST | 02/23/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/21/2022 | 04/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/21/2022 | 04/21/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/03/2022 | 03/03/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/03/2022 | 03/08/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/03/2022 | 03/03/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/22/2022 | 02/23/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/22/2022 | 02/23/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/22/2022 | 02/28/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/24/2022 | 03/23/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/21/2022 | 01/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/21/2022 | 01/26/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 01/21/2022 | 01/24/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/21/2022 | 01/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/21/2022 | 01/24/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/21/2022 | 01/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/21/2022 | 01/26/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/21/2022 | 01/24/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/19/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/19/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/04/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/04/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 02/04/2022 |
| SEWER CREDIT | (¤2,016.00) | 02/04/2022 |
| SEWER INSPECTION | ¤25.00 | 02/04/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 02/04/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 02/04/2022 |
| SITE PLAN 30 | ¤30.00 | 02/04/2022 |
| CONNECTION FEES | ¤1,077.88 | 02/04/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 02/04/2022 |
| IMPACT FEE FIRE | ¤388.65 | 02/04/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 02/04/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/04/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 02/04/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/04/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 02/04/2022 |
| SURCHARGE FS 533.721 | ¤9.85 | 02/04/2022 |
| SURCHARGE - FS 468.631 | ¤14.77 | 02/04/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/04/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/04/2022 |
| SW ENG PRE APRON | ¤30.00 | 02/04/2022 |
| METER - DEPOSIT | ¤60.00 | 02/04/2022 |
| WATER- TURN ON | ¤25.00 | 02/04/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/04/2022 |
| INSPECTION - RESIDENTIAL | ¤701.25 | 02/04/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤198.90 | 02/04/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,257.46 |