I want to search for...
Permit #2022011130
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00210-0200 |
| Total Square Footage: 2728 sqft |
| Block: 00210 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 847-942-1764 |
| Location Address: 10 ROYAL LEAF LN |
| Type: RF - REROOF |
| Issue Date: 01/26/2022 |
| NOC: RECORDED |
| Applicant name: MATTHEW BREITENGROSS |
| Owner: JENSEN FRED J & ALICE M H&W |
|
Address 15 PRINCESS KIM LANE PALM COAST, FL 32164 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤15,000.00 |
| Job Description: REROOF |
| Type: CN |
Contractor
EXTREME WEATHER CONSULTING, LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2206 NW 39TH AVE CAPE CORAL, FL 33993 |
CCC1332204 (Exp: 08/22/2022) | 847-942-1764 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF FINAL | 04/07/2022 | FINAL APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION The gutter guards installed on the left and rear of the building are not allowing the eave shingles to adhere to the starter strips below. | |||
| ROOF FINAL | 03/18/2022 | Disapproved - NO FEE | JWALKER |
| Note: The gutter guards installed on the left and rear of the building are not allowing the eave shingles to adhere to the starter strips below. | |||
| ROOF AFFIDAVIT | 02/08/2022 | APPROVED | BBEMBRY |
| ROOF IN PROGRESS- MIDROOF | 02/03/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION First stop appx 8:30 roof not ready 2nd stop 12:15 Drip edge has not been nail as per code. The off ridge vent are being plywooded over and ridge vents being used. blocking was not added and the plywood is not nailed properly. Remove and install nailers. The plywood fix at the left front above bath window is not replaced properly. A 6" x 2" piece was used and a 1' x 2' piece and part of the rotted plywood was not removed. Plywood replace needs to be a minium of 2' wide and span minimum of two trusses. No shingles have been installed. | |||
| ROOF IN PROGRESS- MIDROOF | 02/02/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: First stop appx 8:30 roof not ready 2nd stop 12:15 Drip edge has not been nail as per code. The off ridge vent are being plywooded over and ridge vents being used. blocking was not added and the plywood is not nailed properly. Remove and install nailers. The plywood fix at the left front above bath window is not replaced properly. A 6" x 2" piece was used and a 1' x 2' piece and part of the rotted plywood was not removed. Plywood replace needs to be a minium of 2' wide and span minimum of two trusses. No shingles have been installed. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/18/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/26/2022 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/26/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/26/2022 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 01/26/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤134.00 |