Permit #2022011238
Permit Details
Status: COED
| Parcel Id: 07-11-31-7065-00400-0060 |
| CONDITIONED SPACE: 2000 sqft |
| GARAGE: 476 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| Total Square Footage: 2817 sqft |
| Block: 00400 |
| Subdivision: - |
| Job Phone: 321-501-4617 |
| Location Address: 53 KATHLEEN TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/11/2022 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNTIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤195,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/09/2023 | FINAL APPROVED | TSTAUFFACHER |
| U -UTILITY RESIDENTIAL FINAL | 02/09/2023 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 02/08/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/08/2023 | APPROVED | EMADISON |
| Note: **02/08/23 CORRECTIONS MADE ______________________________________________________________________________________________________________________ 2/2/2023 - PREVIOUS INSPECTION NOTES 02/02/23 A SOD ELEVATIONS NEXT THE STRUCTURE NEED TO BE A MINIMUM OF 4" BELOW FFE NO CHANGES MADE SINCE LAST FINAL SURVEY INSPECTION ___________________________________________________________________________________________________________________________ 1/27/2023 - PREVIOUS INSPECTION NOTES A SOD ELEVATIONS NEXT THE STRUCTURE NEED TO BE A MINIMUM OF 4" BELOW FFE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/08/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 02/08/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/02/2023 | Disapproved - NO FEE | EMADISON |
| Note: 02/02/23 A SOD ELEVATIONS NEXT THE STRUCTURE NEED TO BE A MINIMUM OF 4" BELOW FFE NO CHANGES MADE SINCE LAST FINAL SURVEY INSPECTION ___________________________________________________________________________________________________________________________ 1/27/2023 - PREVIOUS INSPECTION NOTES A SOD ELEVATIONS NEXT THE STRUCTURE NEED TO BE A MINIMUM OF 4" BELOW FFE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/02/2023 | CANCELLED BY INSPECTOR | EMADISON |
| Note: ** 02/02/23 THIS INSPECTION IS DONE AFTER THE FINAL SURVEY IS PASSED _____________________________________________________________________________________________________________________________ 1/12/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER THE FINAL SURVEY IS PASSED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/27/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: A SOD ELEVATIONS NEXT THE STRUCTURE NEED TO BE A MINIMUM OF 4" BELOW FFE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/12/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: THIS INSPECTION IS DONE AFTER THE FINAL SURVEY IS PASSED | |||
| U-CROSS CONNECTION | 01/12/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ELECTRIC - EARLY POWER | 12/19/2022 | APPROVED | RSIMS |
| ROW- PRE-APRON (PRE-POUR) | 12/06/2022 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR THE DRIVEWAY | |||
| U - SEWER TIE IN | 12/06/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 11/16/2022 | APPROVED | CSTONE |
| INSULATION | 11/14/2022 | APPROVED | BTAYLOR |
| ALL ROUGH | 10/19/2022 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/18/2022 | APPROVED | RSIMS |
| Note: 10/17/2022 - PREVIOUS INSPECTION NOTES 10/17/2022: CANCELLED VIA TEXT AT @ 08:58. 10/12/2022 - PREVIOUS INSPECTION NOTES 10/12/2022 - INSPECTION STOPPED Conventional framing missing collar ties as indicated on detail. Cannot verify 2"x8" bottom plate due to stucco covering it. AHU platform still not framed per details on print page 6. 10/11/2022 - PREVIOUS INSPECTION NOTES 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/2022: PREVIOUS INSPECTION NOTES NOT COMPLETE / INSPECTION STOPPED THIS IS A REINSPECTION 08/31/2022: INCOMPLETE INSPECTION/INSPECTION STOPPED 1. Gable ends missing bracing per Mitek engineering 2.Unable to determine door buck and window buck attachment due to windows and doors installed 3. Conventional framing not per details on pg/5/6- 2x8 nailed to trusses below missing clip from rafters to ridge 4. AC platform not built per plans pg 6/6 5. Front double girder short on mails for appropriate bonding per Mitek 6. No tie down specifics for multi-ply girder attachment to CMU wall INSPECTION STOPPED--TRUSS ENGINEERING NOT INSPECTED 10-11-22 1. Conventional framing not per details on pg/5/6- 2x8 nailed to trusses below missing clip from rafters to ridge 2. Missing H2.5's on rafters to ridge and sleepers Engineering completed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/17/2022 | CANCELLED BY APPLICANT | RSIMS |
| Note: 10/17/2022: CANCELLED VIA TEXT AT @ 08:58. 10/12/2022 - PREVIOUS INSPECTION NOTES 10/12/2022 - INSPECTION STOPPED Conventional framing missing collar ties as indicated on detail. Cannot verify 2"x8" bottom plate due to stucco covering it. AHU platform still not framed per details on print page 6. 10/11/2022 - PREVIOUS INSPECTION NOTES 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/2022: PREVIOUS INSPECTION NOTES NOT COMPLETE / INSPECTION STOPPED THIS IS A REINSPECTION 08/31/2022: INCOMPLETE INSPECTION/INSPECTION STOPPED 1. Gable ends missing bracing per Mitek engineering 2.Unable to determine door buck and window buck attachment due to windows and doors installed 3. Conventional framing not per details on pg/5/6- 2x8 nailed to trusses below missing clip from rafters to ridge 4. AC platform not built per plans pg 6/6 5. Front double girder short on mails for appropriate bonding per Mitek 6. No tie down specifics for multi-ply girder attachment to CMU wall INSPECTION STOPPED--TRUSS ENGINEERING NOT INSPECTED 10-11-22 1. Conventional framing not per details on pg/5/6- 2x8 nailed to trusses below missing clip from rafters to ridge 2. Missing H2.5's on rafters to ridge and sleepers Engineering completed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/12/2022 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 10/12/2022 - INSPECTION STOPPED Conventional framing missing collar ties as indicated on detail. Cannot verify 2"x8" bottom plate due to stucco covering it. AHU platform still not framed per details on print page 6. 10/11/2022 - PREVIOUS INSPECTION NOTES 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/2022: PREVIOUS INSPECTION NOTES NOT COMPLETE / INSPECTION STOPPED THIS IS A REINSPECTION 08/31/2022: INCOMPLETE INSPECTION/INSPECTION STOPPED 1. Gable ends missing bracing per Mitek engineering 2.Unable to determine door buck and window buck attachment due to windows and doors installed 3. Conventional framing not per details on pg/5/6- 2x8 nailed to trusses below missing clip from rafters to ridge 4. AC platform not built per plans pg 6/6 5. Front double girder short on mails for appropriate bonding per Mitek 6. No tie down specifics for multi-ply girder attachment to CMU wall INSPECTION STOPPED--TRUSS ENGINEERING NOT INSPECTED 10-11-22 1. Conventional framing not per details on pg/5/6- 2x8 nailed to trusses below missing clip from rafters to ridge 2. Missing H2.5's on rafters to ridge and sleepers Engineering completed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/11/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/2022: PREVIOUS INSPECTION NOTES NOT COMPLETE / INSPECTION STOPPED THIS IS A REINSPECTION 08/31/2022: INCOMPLETE INSPECTION/INSPECTION STOPPED 1. Gable ends missing bracing per Mitek engineering 2.Unable to determine door buck and window buck attachment due to windows and doors installed 3. Conventional framing not per details on pg/5/6- 2x8 nailed to trusses below missing clip from rafters to ridge 4. AC platform not built per plans pg 6/6 5. Front double girder short on mails for appropriate bonding per Mitek 6. No tie down specifics for multi-ply girder attachment to CMU wall INSPECTION STOPPED--TRUSS ENGINEERING NOT INSPECTED 10-11-22 1. Conventional framing not per details on pg/5/6- 2x8 nailed to trusses below missing clip from rafters to ridge 2. Missing H2.5's on rafters to ridge and sleepers Engineering completed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/04/2022 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 10/04/2022: PREVIOUS INSPECTION NOTES NOT COMPLETE / INSPECTION STOPPED THIS IS A REINSPECTION 08/31/2022: INCOMPLETE INSPECTION/INSPECTION STOPPED 1. Gable ends missing bracing per Mitek engineering 2.Unable to determine door buck and window buck attachment due to windows and doors installed 3. Conventional framing not per details on pg/5/6- 2x8 nailed to trusses below missing clip from rafters to ridge 4. AC platform not built per plans pg 6/6 5. Front double girder short on mails for appropriate bonding per Mitek 6. No tie down specifics for multi-ply girder attachment to CMU wall INSPECTION STOPPED--TRUSS ENGINEERING NOT INSPECTED | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/31/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: 08/31/2022: INCOMPLETE INSPECTION/INSPECTION STOPPED 1. Gable ends missing bracing per Mitek engineering 2.Unable to determine door buck and window buck attachment due to windows and doors installed 3. Conventional framing not per details on pg/5/6- 2x8 nailed to trusses below missing clip from rafters to ridge 4. AC platform not built per plans pg 6/6 5. Front double girder short on mails for appropriate bonding per Mitek 6. No tie down specifics for multi-ply girder attachment to CMU wall INSPECTION STOPPED--TRUSS ENGINEERING NOT INSPECTED | |||
| LATH/BRICK/ WATER BARRIER | 06/17/2022 | APPROVED | LMILLER |
| ROOF VALLEY & METAL | 06/10/2022 | APPROVED | KSANDOE |
| WALL SHEATHING | 06/09/2022 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING | 06/02/2022 | APPROVED | KSANDOE |
| WALL SHEATHING | 06/02/2022 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 05/31/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/16/2022 | APPROVED | TSTAUFFACHER |
| MONOLITHIC SLAB | 04/18/2022 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/14/2022 | APPROVED | TSTAUFFACHER |
| GRAVITY SEWER TEST | 04/14/2022 | APPROVED | TSTAUFFACHER |
| WATER METER INSTALLATION REQUEST | 03/22/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/13/2023 | 01/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/31/2022 | 05/31/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/31/2022 | 05/31/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/29/2022 | 03/29/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/29/2022 | 04/05/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/03/2022 | 03/04/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/24/2022 | 02/25/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Second Request 1. Floor plan shows cast crete lintels are being used, if power box lintel would also be used as alternate, provide product approval per F.S.553.842 and Schedule with designation mark and for safe/uplift capacity per FBCR 7th Ed. Sec.608.8.2. If not applicable, delete or cross out. | |||
| ZON | COMPLETE | 02/24/2022 | 02/24/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/24/2022 | 03/02/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/24/2022 | 02/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/27/2022 | 01/27/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM 1. Provide missing engineered truss/roof framing layout that should have been submitted during the permit application. A request on letter head should be submitted for deferred submittal as provided on Ciy's Website. Truss package may be submitted at the job site. 2. Provide Components and Cladding of Pressure Zones per FBC - Residential Figure R301.2(7). 3. Sheet 4 of 6 - Foundation Plan: a. Referenced Mark, 3/F between garage and driveway is incorrect based on footer detail shown on Sheet 5 of 6. Also, provide applicable footer details on foundation plan to include rear porch for clarity per FBC 7th Ed. Sec. 107.3. 4. Floor plan shows cast crete lintels are being used, if power box lintel would also be used as alternate, provide product approval per F.S.553.842 and Schedule with designation mark and for safe/uplift capacity per FBCR 7th Ed. Sec.608.8.2. If not applicable, delete or cross out. | |||
| CUSVC | COMPLETE | 01/27/2022 | 02/01/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 01/27/2022 | 01/31/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/27/2022 | 01/27/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/27/2022 | 01/28/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/27/2022 | 01/27/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/27/2022 | 02/02/2022 |
| Note: Held By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) I.Land Development Code Technical Manual, Section 300, Drawing 300.D, Culvert material and size to be depicted. Typical is 17X13 CMP (L) L.Land Development Code Technical Manual, Section 300, Drawing 300.E, Note 5 | |||
| ZON | HOLD | 01/27/2022 | 01/28/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Banding around Windows and doors Banding is required on windows and doors facing the right of way (right elevation). | |||
| SWALE | COMPLETE | 01/27/2022 | 04/05/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/09/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/09/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/09/2023 |
| CONNECTION FEES | ¤1,077.88 | 03/11/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 03/11/2022 |
| IMPACT FEE FIRE | ¤388.65 | 03/11/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 03/11/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/11/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 03/11/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/11/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 03/11/2022 |
| SURCHARGE FS 533.721 | ¤9.85 | 03/11/2022 |
| SURCHARGE - FS 468.631 | ¤14.77 | 03/11/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/11/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/11/2022 |
| SW ENG PRE APRON | ¤30.00 | 03/11/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/11/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/11/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 03/11/2022 |
| SEWER CREDIT | (¤850.00) | 03/11/2022 |
| SEWER INSPECTION | ¤25.00 | 03/11/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 03/11/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 03/11/2022 |
| SITE PLAN 30 | ¤30.00 | 03/11/2022 |
| METER - DEPOSIT | ¤60.00 | 03/11/2022 |
| WATER- TURN ON | ¤25.00 | 03/11/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/11/2022 |
| INSPECTION - RESIDENTIAL | ¤701.25 | 03/11/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤198.90 | 03/11/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,475.96 |