I want to search for...
Permit #2022011291
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7012-00150-0140 |
| CONDITIONED SPACE: 1705 sqft |
| GARAGE: 464 sqft |
| OPENED PORCH (WITH ROOF) : 47 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| Total Square Footage: 2360 sqft |
| Block: 00150 |
| Subdivision: 2187 - SECTION 12-BELLE TERRE |
| Job Phone: 321-501-4617 |
| Location Address: 27 BARRINGTON DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/21/2022 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤170,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/04/2023 | FINAL APPROVED | JSTEWART |
| ROW - STORMWATER FINAL | 04/27/2023 | APPROVED | GBERTOLA |
| Note: 4/27/23= CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U -UTILITY RESIDENTIAL FINAL | 04/14/2023 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 04/13/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/13/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/13/2023 | APPROVED | EMADISON |
| Note: ** 04/13/23 RIGHT SIDE REMOVE HIGH SPOT FROM SWALE AND YOU NEED TO CONTINUE SOD UP TO THE SPILLWAY TO THE CITY DITCH LINE TO ALLOW WATER TO FLOW AS CURRENTLY BEING HELD AND PONDING ** CLEAN CULVERT ENDS OF ALL DEBRIS AND OVER POUR ** RIGHT SIDE ALONG PROPERTY LINE AND CITY EASEMENT NEED TO SOD ALL BARE EARTH AREAS ALL AREAS IN NEED OF REPAIR AND SOD ARE HIGH LIGHTED WITH PINK PAINT. | |||
| U-CROSS CONNECTION | 04/04/2023 | APPROVED | DHANEY |
| U - SEWER TIE IN | 03/23/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 03/01/2023 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POUR THE CONCRETE FOR DRIVEWAY. | |||
| ELECTRIC - EARLY POWER | 02/08/2023 | APPROVED | JSTEWART |
| Note: 2/7/2023 - PREVIOUS INSPECTION NOTES Address not visible from road per FBC 319.1,n inspection passed but unable to release power untill address is fixed | |||
| ELECTRIC - EARLY POWER | 02/07/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Address not visible from road per FBC 319.1,n inspection passed but unable to release power untill address is fixed | |||
| INSULATION | 12/27/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 12/20/2022 | APPROVED | KSANDOE |
| Note: 12/14/2022 - PREVIOUS INSPECTION NOTES 1. Exhaust fans need to be strapped every 4' 2. Anchor missing in window in living room near kitchen 3. Window does not open properly in master bedroom | |||
| LATH/BRICK/ WATER BARRIER | 12/20/2022 | APPROVED | KSANDOE |
| Note: 12/19/2022 - PREVIOUS INSPECTION NOTES NEED WEATHER RESISTANT BARRIER (TYVEC/TAPE/etc.) AT WOOD TO BLOCK INTERSECTION PER MANUFACTURER SPECS AND ASTM SPECS (RAW WOOD AT BACK SLIDER) | |||
| LATH/BRICK/ WATER BARRIER | 12/19/2022 | Disapproved - NO FEE | LMILLER |
| Note: NEED WEATHER RESISTANT BARRIER (TYVEC/TAPE/etc.) AT WOOD TO BLOCK INTERSECTION PER MANUFACTURER SPECS AND ASTM SPECS (RAW WOOD AT BACK SLIDER) | |||
| ALL ROUGH | 12/14/2022 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Exhaust fans need to be strapped every 4' 2. Anchor missing in window in living room near kitchen 3. Window does not open properly in master bedroom | |||
| ROOF VALLEY & METAL | 08/08/2022 | APPROVED | RMARTIN |
| WALL SHEATHING | 07/29/2022 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/29/2022 | APPROVED | FWILLIS |
| ROOF SHEATHING | 07/29/2022 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 07/08/2022 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 07/05/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/23/2022 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION PROOF OF COMPACTION NOT IN BOX. FBC 1804.6, 1803.5 | |||
| MONOLITHIC SLAB | 06/22/2022 | Disapproved - NO FEE | FWILLIS |
| Note: PROOF OF COMPACTION NOT IN BOX. FBC 1804.6, 1803.5 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/17/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 06/17/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 05/23/2022 | APPROVED | CSTONE |
| ROW - DRAINAGE | 05/12/2022 | APPROVED - AS NOTED | EMADISON |
| Note: * CORRECTIONS HAVE BEEN MADE * EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION. EM Drainage across the front needs to be open for storm water to reach the spillway throughout the entire construction project. 5/6/22 - Drainage still blocked. Next inspection 5/12/22. | |||
| ROW - DRAINAGE | 05/06/2022 | Disapproved -FEE REQUIRED | RGROSS |
| Note: THIS IS A REINSPECTION Drainage across the front needs to be open for storm water to reach the spillway throughout the entire construction project. 5/6/22 - Drainage still blocked. Next inspection 5/12/22. | |||
| WATER METER INSTALLATION REQUEST | 05/02/2022 | APPROVED | CSTONE |
| ROW - DRAINAGE | 05/02/2022 | Disapproved - NO FEE | RGROSS |
| Note: Drainage across the front needs to be open for storm water to reach the spillway throughout the entire construction project. Next Inspection 5/6/22. Per Contact, Temporary Culvert ordered and will be installed within the next day or 2. |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 07/05/2022 | 07/05/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/05/2022 | 07/05/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/19/2022 | 04/19/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/19/2022 | 04/19/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/06/2022 | 04/07/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder. (Second Request) | |||
| BLD | HOLD | 04/06/2022 | 04/07/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Corrections: changed address and plans. All corrected plans shall have verifiable, digital signature of an engineer of record per F.S. 471.025 and F.A.C. 61G15-23.001. | |||
| MECH | HOLD | 04/01/2022 | 04/01/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder | |||
| ZON | COMPLETE | 04/01/2022 | 04/01/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/01/2022 | 04/01/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/01/2022 | 04/01/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM All submitted plans dated 3-28-22/4-1-22 show incorrect address. Resubmit to match with the permit application for clarification per FBC 7th Ed. Sec. 107.3. | |||
| ZON | HOLD | 01/31/2022 | 01/31/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/28/2022 | 01/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/28/2022 | 02/01/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 01/28/2022 | 01/31/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM electric load calcs do not match the square footage of the house. | |||
| ENGIN1 | COMPLETE | 01/28/2022 | 01/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/28/2022 | 01/31/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/28/2022 | 01/31/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Square footage on plans does not match the enegy calcs. 2. Duct layout needs to show garage left to match plans | |||
| SW1 | COMPLETE | 01/28/2022 | 02/03/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/28/2022 | 04/05/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤25.00 | 04/21/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/21/2022 |
| INSPECTION - RESIDENTIAL | ¤594.00 | 04/21/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤168.48 | 04/21/2022 |
| CONNECTION FEES | ¤1,077.88 | 04/21/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 04/21/2022 |
| IMPACT FEE FIRE | ¤388.65 | 04/21/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 04/21/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/21/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 04/21/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/21/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 04/21/2022 |
| SURCHARGE FS 533.721 | ¤8.44 | 04/21/2022 |
| SURCHARGE - FS 468.631 | ¤12.65 | 04/21/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/21/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/21/2022 |
| SW ENG PRE APRON | ¤30.00 | 04/21/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/21/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/21/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 04/21/2022 |
| SEWER CREDIT | (¤1,466.00) | 04/21/2022 |
| SEWER INSPECTION | ¤25.00 | 04/21/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 04/21/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 04/21/2022 |
| SITE PLAN 30 | ¤30.00 | 04/21/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| Fees | Total Due: ¤60.00 | Total Paid: ¤16,546.26 |