Permit #2022011349

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1650
CONDITIONED SPACE: 2250 sqft
GARAGE: 558 sqft
OPENED PORCH (WITH ROOF) : 331 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
Total Square Footage: 3199 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-447-4400
Location Address: 349 HIBISCUS WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/01/2022
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: MARICIC FRANK ANTHONY & CYNTHIA MARIA H&W

Address

147 RT 100

KATONAH, NY 10536

Lot: 1650
Contracted Stated Job Value: ¤491,000.00
Job Description: Single Family Home
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007
CHARLES K DAVIS
Status Location Address State License Number Phone
ACTIVE

3000 E MOODY BLVD BLDG 2

BUNNELL , FL 32110

EC13004270 (Exp: 08/31/2026) 386-931-6614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/28/2023 FINAL APPROVED AGAETANO
U-CROSS CONNECTION 09/26/2023 APPROVED DHANEY
U -UTILITY RESIDENTIAL FINAL 09/26/2023 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 09/25/2023 APPROVED RGROSS
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/25/2023 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 09/25/2023 APPROVED RGROSS
ROW - STORMWATER FINAL 09/25/2023 APPROVED RGROSS
ELECTRIC - EARLY POWER 04/27/2023 APPROVED - AS NOTED AGAETANO
Note: 4/10/2023 - PREVIOUS INSPECTION NOTES 04-27-2023 FPL notified at 9:22 am. Blank covers will be installed at a few locations today.
ROW- PRE-APRON (PRE-POUR) 04/20/2023 APPROVED EMADISON
Note: ** 04/20/23 READY TO SET PAVERS ____________________________________________________________________________________________________________________ 4/12/2023 - PREVIOUS INSPECTION NOTES ** 04/12/23 CORRECTIONS MADE READY TO POUR PAVER RESTRAINTS AND APRON ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPRESAD SND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED __________________________________________________________________________________________________________________________ 4/11/2023 - PREVIOUS INSPECTION NOTES ** 04/11/23 NEED TO CHIP AWAY THE OVER POUR OF CONCRETE AT THE GARAGE OPENING ** REMOVE PORTA-JOHN FROM THE APRON POUR AREA.
ROW- PRE-APRON (PRE-POUR) 04/12/2023 PARTIALLY APPROVED EMADISON
Note: ** 04/12/23 CORRECTIONS MADE READY TO POUR PAVER RESTRAINTS AND APRON ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPRESAD SND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED __________________________________________________________________________________________________________________________ 4/11/2023 - PREVIOUS INSPECTION NOTES ** 04/11/23 NEED TO CHIP AWAY THE OVER POUR OF CONCRETE AT THE GARAGE OPENING ** REMOVE PORTA-JOHN FROM THE APRON POUR AREA.
ROW- PAVER RESTRAINTS 04/11/2023 APPROVED EMADISON
Note: **** 04/11/23 READY TO POUR PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 04/11/2023 Disapproved - NO FEE EMADISON
Note: ** 04/11/23 NEED TO CHIP AWAY THE OVER POUR OF CONCRETE AT THE GARAGE OPENING ** REMOVE PORTA-JOHN FROM THE APRON POUR AREA.
ELECTRIC - EARLY POWER 04/10/2023 CANCELLED BY APPLICANT RMARTIN
GRAVITY SEWER TEST 02/15/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 02/15/2023 APPROVED AGAETANO
U - SEWER TIE IN 02/15/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 01/30/2023 APPROVED AGAETANO
ELECTRIC-TUG 01/30/2023 APPROVED AGAETANO
ALL ROUGH 01/19/2023 APPROVED AGAETANO
WALL SHEATHING 01/18/2023 APPROVED AGAETANO
ROOF VALLEY & METAL 11/22/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/04/2022 APPROVED AGAETANO
Note: 11/2/2022 - PREVIOUS INSPECTION NOTES 11-02-2022 Drawings not on site. NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/02/2022 Disapproved - NO FEE AGAETANO
Note: 11-02-2022 Drawings not on site. NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1.
TIE BEAM / LINTEL 07/15/2022 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 05/05/2022 APPROVED TBAKER
MONOLITHIC SLAB 04/21/2022 APPROVED - AS NOTED AGAETANO
Note: Contractor installing the last couple pieces of rebar in the footing. Superintendent on site.
PLUMBING 1ST ROUGH UNDERGROUND 04/12/2022 APPROVED AGAETANO
WATER METER INSTALLATION REQUEST 03/14/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 09/28/2023 10/02/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 09/25/2023 09/26/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 08/17/2023 08/21/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/04/2022 05/05/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/04/2022 05/04/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 03/11/2022 03/14/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
MECH COMPLETE 02/10/2022 02/10/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 02/07/2022 02/07/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
URB COMPLETE 01/31/2022 02/01/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD HOLD 01/30/2022 01/31/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide the required design pressures in psf of exterior windows and doors including garage door per FBC- Residential, Figure R301.2 (7) - component and cladding pressure zones.
CUSVC COMPLETE 01/30/2022 02/01/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 01/30/2022 01/31/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/30/2022 01/31/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 01/30/2022 02/02/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 01/30/2022 01/31/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs and EPL card need to be signed by the builder
SW1 COMPLETE 01/30/2022 02/02/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 01/30/2022 01/31/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 09/27/2023
PLAN REVIEW - REVISION ¤32.50 08/23/2023
CONTRACTOR CHANGE ¤20.00 08/23/2023
3% FIRE IMPACT FEE CREDIT (¤11.66) 03/01/2022
IMPACT FEE FIRE ¤388.65 03/01/2022
IMPACT FEE PARKS ¤1,455.13 03/01/2022
IMPACT FEE SCHOOL ¤3,600.00 03/01/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 03/01/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 03/01/2022
SURCHARGE FS 533.721 ¤18.39 03/01/2022
SURCHARGE - FS 468.631 ¤27.59 03/01/2022
SW ENG - FOUNDATION SURVEY ¤20.00 03/01/2022
SW ENG INSPECTION 80 ¤80.00 03/01/2022
SW ENG PRE APRON ¤30.00 03/01/2022
SW ENG - REVIEW 20 ¤20.00 03/01/2022
SW ENG RES REVIEW 200 ¤200.00 03/01/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 03/01/2022
SEWER INSPECTION ¤25.00 03/01/2022
SITE PLAN 30 ¤30.00 03/01/2022
CONNECTION FEES ¤25.00 03/01/2022
CONTRACTOR CHANGE ¤40.00 03/01/2022
METER - DEPOSIT ¤60.00 03/01/2022
WATER-METER ¤467.09 03/01/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/01/2022
INSPECTION - RESIDENTIAL ¤1,350.25 03/01/2022
PLAN REVIEW - RESIDENTIAL ¤382.98 03/01/2022
Fees Total Due: ¤0.00 Total Paid: ¤11,407.05