I want to search for...
Permit #2022020072
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00100-0070 |
| CONDITIONED SPACE: 2085 sqft |
| GARAGE: 595 sqft |
| OPENED PORCH (WITH ROOF) : 175 sqft |
| Total Square Footage: 2855 sqft |
| Block: 00100 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 321-271-9033 |
| Location Address: 7 FIELDING LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/24/2022 |
| NOC: RECORDED |
| Applicant name: KEITH E TANNER |
| Owner: LS-VEH 2, LLC |
|
Address 4885 N WICKHAM ROAD MELBOURNE, FL 32940 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES PREMIER HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
4885 N WICKHAM RD MELBOURNE, FL 32940 |
STE 101 MELBOURNE, FL 32940 |
CGC1516602 (Exp: 08/31/2024) | 321-610-3924 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/06/2022 | FINAL APPROVED | AGAETANO |
| ROW - STORMWATER FINAL | 12/02/2022 | FINAL APPROVED | EMADISON |
| Note: New inspection due to canceled inspection ** 12/02/22 CORRECTIONS MADE 11/29/2022 - PREVIOUS INSPECTION NOTES ** 11/29/22 REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE AND LEFT SIDE VACANT ** REMOVE DUMPSTER FROM SWALE AND REPAIR AND SOD TO MATCH EXISTING GRADE ** SEE NOTES LEFT IN FIELD SURVEY | |||
| ROW - STORMWATER FINAL | 11/30/2022 | CANCELLED BY APPLICANT | WEB |
| Note: 11/29/2022 - PREVIOUS INSPECTION NOTES ** 11/29/22 REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE AND LEFT SIDE VACANT ** REMOVE DUMPSTER FROM SWALE AND REPAIR AND SOD TO MATCH EXISTING GRADE ** SEE NOTES LEFT IN FIELD SURVEY | |||
| U -UTILITY RESIDENTIAL FINAL | 11/29/2022 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 11/29/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/29/22 REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE AND LEFT SIDE VACANT ** REMOVE DUMPSTER FROM SWALE AND REPAIR AND SOD TO MATCH EXISTING GRADE ** SEE NOTES LEFT IN FIELD SURVEY | |||
| U-CROSS CONNECTION | 11/29/2022 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 11/28/2022 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/28/2022 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/28/2022 | APPROVED | EMADISON |
| Note: ** 11/28/22 REMOVE ALL TTRASH AND CONSTRUCTION DEBRIS FROM SITE AND LEFT SIDE VACANT ** REMOVE DUMPSTER FROM SWALE AND REPAIR AND SOD TO MATCH EXISTING GRADE | |||
| U - SEWER TIE IN | 11/18/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 11/09/2022 | APPROVED | EMADISON |
| Note: ** 11/09/22 MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** IN THE EVENT OF RAIN BUILDER NEEDS TO RECHECK CULVERT ELEVATION AND MATERIAL COMPACTION 11/7/2022 - PREVIOUS INSPECTION NOTES ** 11/08/22 NO FORM BOARD IN PLACE ACROSS FRONT EDGE OF ROADWAY, ALSO LARGE CHUNKS OF ASPHALT BREAKING AWAY FROM EDGE OF ROAD INTO POUR AREA. ** TOO MUCH STONE ABOVE CULVERT LEFT A STRINGLINE IN PLACE A MINIMUM OF 4 INCHES OF CONCRETE NEEDS TO BE IN DRIVEWAY. ** SITE IS NOT READY 10/27/2022 - PREVIOUS INSPECTION NOTES ** 10/27/22 NOT ENOUGH COMPACTION OF MATERIAL IN THE "ROW" FOOT SINKS INTO SOFT MATERIAL APPROXIMATELY 5 INCHES. ** MATERIAL NEEDS TO BECOMPACTED HALFWAY UP ENTIRE LENGTH OF CULVERT | |||
| ELECTRIC - EARLY POWER | 11/08/2022 | APPROVED | JMUNSON |
| ROW- PRE-APRON (PRE-POUR) | 11/07/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/08/22 NO FORM BOARD IN PLACE ACROSS FRONT EDGE OF ROADWAY, ALSO LARGE CHUNKS OF ASPHALT BREAKING AWAY FROM EDGE OF ROAD INTO POUR AREA. ** TOO MUCH STONE ABOVE CULVERT LEFT A STRINGLINE IN PLACE A MINIMUM OF 4 INCHES OF CONCRETE NEEDS TO BE IN DRIVEWAY. ** SITE IS NOT READY 10/27/2022 - PREVIOUS INSPECTION NOTES ** 10/27/22 NOT ENOUGH COMPACTION OF MATERIAL IN THE "ROW" FOOT SINKS INTO SOFT MATERIAL APPROXIMATELY 5 INCHES. ** MATERIAL NEEDS TO BECOMPACTED HALFWAY UP ENTIRE LENGTH OF CULVERT | |||
| ROW- PRE-APRON (PRE-POUR) | 10/27/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/27/22 NOT ENOUGH COMPACTION OF MATERIAL IN THE "ROW" FOOT SINKS INTO SOFT MATERIAL APPROXIMATELY 5 INCHES. ** MATERIAL NEEDS TO BECOMPACTED HALFWAY UP ENTIRE LENGTH OF CULVERT | |||
| INSULATION | 09/09/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION No insulation installed. 09-02-2022 - No insulation installed. | |||
| INSULATION | 09/02/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION No insulation installed. 09-02-2022 - No insulation installed. | |||
| INSULATION | 08/30/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: No insulation installed. | |||
| ALL ROUGH | 08/17/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Wires not phased out in electrical panel. 2. Approved drawings not on site. 3. Return air ducts not installed or indicated, drawings not on site. | |||
| ALL ROUGH | 08/17/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION 1. Wires not phased out in electrical panel. 2. Approved drawings not on site. 3. Return air ducts not installed or indicated, drawings not on site. | |||
| LATH/BRICK/ WATER BARRIER | 06/28/2022 | APPROVED | LMILLER |
| ROOF VALLEY & METAL | 06/16/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/14/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION General notes drawings Detail 1501S indicate straps and clips needed at valley framing at entry way. Please install as per drawings. | |||
| WALL SHEATHING | 06/09/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/09/2022 | Disapproved - NO FEE | AGAETANO |
| Note: General notes drawings Detail 1501S indicate starps and clips needed at valley framing at entry way. Please install as per drawings. | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/08/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/23/2022 | APPROVED | AGAETANO |
| MONOLITHIC SLAB | 05/11/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: Need port-o-let on site | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/06/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED PORTABLE BATHROOM BEFORE SCHEDULING MONOLITHIC SLAB INSPECTION | |||
| GRAVITY SEWER TEST | 05/06/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 05/04/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/23/2022 | 11/23/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/21/2022 | 07/22/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to match the Energy Calc. (St. Augustine) | |||
| BADMIN | INFORMATION | 06/15/2022 | 06/15/2022 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Need to submit permit application as a supporting document along with your revision form. | |||
| ENGIN1 | COMPLETE | 06/08/2022 | 06/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/08/2022 | 06/08/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/16/2022 | 03/16/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/16/2022 | 02/17/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM Provide FL No. for wood anchors. The Nos. submitted are all for wood connectors but lindicated on incorrect space (wood anchor). Please revise for clarity. | |||
| SWALE | COMPLETE | 02/02/2022 | 04/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/01/2022 | 02/03/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Product approval per F.S. 553.842:. 1. Provide specific FL Nos. for garage doors (Small and Big) as there are several models to choose from and at different design pressures to comply with the required design pressures. 2. Provide FL No. for wood anchors. The Nos. submitted are all for wood connectors but lindicated on incorrect space (wood anchor). Please revise for clarity. | |||
| CUSVC | COMPLETE | 02/01/2022 | 02/07/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 02/01/2022 | 02/02/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/01/2022 | 02/02/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/01/2022 | 02/03/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/01/2022 | 02/02/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/01/2022 | 02/07/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/01/2022 | 02/02/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 12/06/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/06/2022 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/06/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 12/06/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 12/06/2022 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/06/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/06/2022 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/06/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/24/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/24/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 03/24/2022 |
| SEWER INSPECTION | ¤25.00 | 03/24/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 03/24/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 03/24/2022 |
| SITE PLAN 30 | ¤30.00 | 03/24/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 03/24/2022 |
| IMPACT FEE FIRE | ¤388.65 | 03/24/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 03/24/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/24/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 03/24/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/24/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 03/24/2022 |
| SURCHARGE FS 533.721 | ¤10.14 | 03/24/2022 |
| SURCHARGE - FS 468.631 | ¤15.21 | 03/24/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/24/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/24/2022 |
| SW ENG PRE APRON | ¤30.00 | 03/24/2022 |
| CONNECTION FEES | ¤1,077.88 | 03/24/2022 |
| METER - DEPOSIT | ¤60.00 | 03/24/2022 |
| WATER- TURN ON | ¤25.00 | 03/24/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/24/2022 |
| INSPECTION - RESIDENTIAL | ¤723.25 | 03/24/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤205.14 | 03/24/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,514.93 |