I want to search for...
Permit #2022020393
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-1180 |
| CONDITIONED SPACE: 2773 sqft |
| OPENED PORCH (WITH ROOF) : 334 sqft |
| GARAGE: 649 sqft |
| Total Square Footage: 3756 sqft |
| Block: 00000 |
| Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION |
| Job Phone: 863-647-5815 |
| Location Address: 3 MENORCA WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/24/2022 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: CULLIFER HOY T & SANDRA G H&W |
|
Address 92 BRESSLER LANE PALM COAST, FL 32137 |
| Lot: 1180 |
| Contracted Stated Job Value: ¤51,500.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
JOSEPH DEREK CARTWRIGHT
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
151 RODEO ROAD ORMOND BEACH, FL 32174 |
CCC1327493 (Exp: 08/31/2026) | 386-310-7962 | (386)615-3713 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/03/2023 | FINAL APPROVED | BTAYLOR |
| Note: 8/1/2023 - PREVIOUS INSPECTION NOTES 7/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2270 12/20/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 11-28-22 1. Front window over garage missing. 2. Front door missing. 12-20-22 1. No plans on site. 12/22/22 footer is 10"x10" with 2- #5 rebar can pour at own risk will need detail for footer from engineer by next inspection | |||
| BLD - BUILDING FINAL | 08/01/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: 7/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2270 12/20/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 11-28-22 1. Front window over garage missing. 2. Front door missing. 12-20-22 1. No plans on site. 12/22/22 footer is 10"x10" with 2- #5 rebar can pour at own risk will need detail for footer from engineer by next inspection | |||
| BLD - BUILDING FINAL | 07/27/2023 | CANCELLED BY APPLICANT | TSTAUFFACHER |
| Note: Inspector Notes from Inspection 2270 12/20/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 11-28-22 1. Front window over garage missing. 2. Front door missing. 12-20-22 1. No plans on site. 12/22/22 footer is 10"x10" with 2- #5 rebar can pour at own risk will need detail for footer from engineer by next inspection | |||
| ROW - STORMWATER FINAL | 07/27/2023 | APPROVED - AS NOTED | PFLANAGAN |
| Note: TALKED TO CONTRACTOR HE HAS TOLD ME WHEN THEY ARE DONE WITH THE PALLET OF STONE THEY WILL REMOVE PASSING AS NOTED ----------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO PICK THE PALLET ON LEFT SIDE UP WITH BUILDING MATERIALS ON IT ------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS 2) NEED TO CLEAN CURB AND GUTTER FROM RIO VISTA DR. TO RERSIDENT#7 MENORCA WAY 3) THERE ARE STILL WAS OUT WHERE DOWN SPOUTS ARE NEED TO FIX TRIPING HAZARD. ------------------------------------------------------------------------------------- 6/26/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE DUMPSTER AND PORTER JOHN 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS IN VACANTS AND YOUR LOT 3) NEED CLEAN ALL SAND AND DIRT FROM CURB AND GUTTER TO RIO VISTA AND TO RESIDENT #7 4) NEED TO RE-ESTABLISH GRASS BUFFER ON BOTH VACANTS ADJACENT TO YOUR LOT NEED TO BE BAHIA SOD WITH 5' OFF THE BACK OF CURB AND GUTTER 5) NEED TO FIX WAH OUT ON RIGHT SIDE OF HOUSE WHERE DOWN SPOUT IS 6) NEED TO HAVE SOD BEHIND THE MULCH BED IN BACK PROPERTY LINE. | |||
| ROW - STORMWATER FINAL | 07/26/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO PICK THE PALLET ON LEFT SIDE UP WITH BUILDING MATERIALS ON IT ------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS 2) NEED TO CLEAN CURB AND GUTTER FROM RIO VISTA DR. TO RERSIDENT#7 MENORCA WAY 3) THERE ARE STILL WAS OUT WHERE DOWN SPOUTS ARE NEED TO FIX TRIPING HAZARD. ------------------------------------------------------------------------------------- 6/26/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE DUMPSTER AND PORTER JOHN 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS IN VACANTS AND YOUR LOT 3) NEED CLEAN ALL SAND AND DIRT FROM CURB AND GUTTER TO RIO VISTA AND TO RESIDENT #7 4) NEED TO RE-ESTABLISH GRASS BUFFER ON BOTH VACANTS ADJACENT TO YOUR LOT NEED TO BE BAHIA SOD WITH 5' OFF THE BACK OF CURB AND GUTTER 5) NEED TO FIX WAH OUT ON RIGHT SIDE OF HOUSE WHERE DOWN SPOUT IS 6) NEED TO HAVE SOD BEHIND THE MULCH BED IN BACK PROPERTY LINE. | |||
| ROW - STORMWATER FINAL | 07/24/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) STILL NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS 2) NEED TO CLEAN CURB AND GUTTER FROM RIO VISTA DR. TO RERSIDENT#7 MENORCA WAY 3) THERE ARE STILL WAS OUT WHERE DOWN SPOUTS ARE NEED TO FIX TRIPING HAZARD. ------------------------------------------------------------------------------------- 6/26/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE DUMPSTER AND PORTER JOHN 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS IN VACANTS AND YOUR LOT 3) NEED CLEAN ALL SAND AND DIRT FROM CURB AND GUTTER TO RIO VISTA AND TO RESIDENT #7 4) NEED TO RE-ESTABLISH GRASS BUFFER ON BOTH VACANTS ADJACENT TO YOUR LOT NEED TO BE BAHIA SOD WITH 5' OFF THE BACK OF CURB AND GUTTER 5) NEED TO FIX WAH OUT ON RIGHT SIDE OF HOUSE WHERE DOWN SPOUT IS 6) NEED TO HAVE SOD BEHIND THE MULCH BED IN BACK PROPERTY LINE. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/26/2023 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 06/26/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO REMOVE DUMPSTER AND PORTER JOHN 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS IN VACANTS AND YOUR LOT 3) NEED CLEAN ALL SAND AND DIRT FROM CURB AND GUTTER TO RIO VISTA AND TO RESIDENT #7 4) NEED TO RE-ESTABLISH GRASS BUFFER ON BOTH VACANTS ADJACENT TO YOUR LOT NEED TO BE BAHIA SOD WITH 5' OFF THE BACK OF CURB AND GUTTER 5) NEED TO FIX WAH OUT ON RIGHT SIDE OF HOUSE WHERE DOWN SPOUT IS 6) NEED TO HAVE SOD BEHIND THE MULCH BED IN BACK PROPERTY LINE. | |||
| U-CROSS CONNECTION | 06/20/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ELECTRIC - EARLY POWER | 05/03/2023 | APPROVED | RSIMS |
| Note: 5/3/23: Resolved interior kitchen island anti-shorts. Waiting for exterior kitchen virtual confirmation. Received virtual confirmation at @ 10:14. 5/2/2023 - PREVIOUS INSPECTION NOTES 5/2/23: Waiting for virtual verification of Anti-shorts in MC cable over romex in Lanai Island (on left). Not resolved. Call back in for tomorrow. 4/26/2023 - PREVIOUS INSPECTION NOTES 4-26-23 1. Not ready. | |||
| ELECTRIC - EARLY POWER | 05/02/2023 | Disapproved - NO FEE | RSIMS |
| Note: 5/2/23: Waiting for virtual verification of Anti-shorts in MC cable over romex in Lanai Island (on left). Not resolved. Call back in for tomorrow. 4/26/2023 - PREVIOUS INSPECTION NOTES 4-26-23 1. Not ready. | |||
| ELECTRIC - EARLY POWER | 04/26/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 4-26-23 1. Not ready. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/08/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/08/2023 | APPROVED | EMADISON |
| Note: ** 03/08/23 ACROSS REAR PROPERTY LINE BACK SIDE OF MULCH NEED TO HAVE A 4:1 SLOPE AND PIN SOD ** SOD NEEDED AROUND PATIO PAVERS ON BOTH SIDES OF HOUSE | |||
| ROW - FINAL APRON (AFTER POUR) | 03/08/2023 | FINAL APPROVED | EMADISON |
| ROW- PRE-APRON (PRE-POUR) | 01/13/2023 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS ---------------------------------------------------------------- 12/20/2022 - PREVIOUS INSPECTION NOTES READY TO POUR THE CONCRETE FOR THE DRIVEWAY, SIDEWALK, AND PAVER RESTRAINTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO SPREAD AND COMPACTED WITH NO PAVERS LAID. | |||
| FOOTER | 12/22/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: 12/20/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 11-28-22 1. Front window over garage missing. 2. Front door missing. 12-20-22 1. No plans on site. 12/22/22 footer is 10"x10" with 2- #5 rebar can pour at own risk will need detail for footer from engineer by next inspection | |||
| FOOTER | 12/20/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2320 11-28-22 1. Front window over garage missing. 2. Front door missing. 12-20-22 1. No plans on site. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/20/2022 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR THE CONCRETE FOR THE DRIVEWAY, SIDEWALK, AND PAVER RESTRAINTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO SPREAD AND COMPACTED WITH NO PAVERS LAID. | |||
| U - SEWER TIE IN | 12/09/2022 | APPROVED | DCUSHING |
| GRAVITY SEWER TEST | 12/09/2022 | APPROVED | DCUSHING |
| LATH/BRICK/ WATER BARRIER | 11/28/2022 | APPROVED - AS NOTED | BTAYLOR |
| Note: 11-28-22 1. Front window over garage missing. 2. Front door missing. | |||
| INSULATION | 11/17/2022 | APPROVED | DCUSHING |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2420 New inspection due to canceled inspection 10/27/2022 - PREVIOUS INSPECTION NOTES 1. Grounding Ufer Protection, NEC 250.64 (1) (needs to be protected from physical damage 2. Nail Plates needed on electric Top on Panel box out NEC 300.4 a 1 3. Need pan for A/C M1411.3.1 (1) Inspection stopped Nothing further looked at. 11-2-22 1. Front window not installed. 2. Front door not installed. | |||
| INSULATION | 11/09/2022 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2420 New inspection due to canceled inspection 10/27/2022 - PREVIOUS INSPECTION NOTES 1. Grounding Ufer Protection, NEC 250.64 (1) (needs to be protected from physical damage 2. Nail Plates needed on electric Top on Panel box out NEC 300.4 a 1 3. Need pan for A/C M1411.3.1 (1) Inspection stopped Nothing further looked at. 11-2-22 1. Front window not installed. 2. Front door not installed. | |||
| ALL ROUGH | 11/02/2022 | APPROVED - AS NOTED | BTAYLOR |
| Note: New inspection due to canceled inspection 10/27/2022 - PREVIOUS INSPECTION NOTES 1. Grounding Ufer Protection, NEC 250.64 (1) (needs to be protected from physical damage 2. Nail Plates needed on electric Top on Panel box out NEC 300.4 a 1 3. Need pan for A/C M1411.3.1 (1) Inspection stopped Nothing further looked at. 11-2-22 1. Front window not installed. 2. Front door not installed. | |||
| ALL ROUGH | 11/01/2022 | CANCELLED BY APPLICANT | WEB |
| Note: 10/27/2022 - PREVIOUS INSPECTION NOTES 1. Grounding Ufer Protection, NEC 250.64 (1) (needs to be protected from physical damage 2. Nail Plates needed on electric Top on Panel box out NEC 300.4 a 1 3. Need pan for A/C M1411.3.1 (1) Inspection stopped Nothing further looked at. | |||
| ALL ROUGH | 10/27/2022 | Disapproved - NO FEE | LMILLER |
| Note: 1. Grounding Ufer Protection, NEC 250.64 (1) (needs to be protected from physical damage 2. Nail Plates needed on electric Top on Panel box out NEC 300.4 a 1 3. Need pan for A/C M1411.3.1 (1) Inspection stopped Nothing further looked at. | |||
| ROOF VALLEY & METAL | 08/24/2022 | APPROVED | DCUSHING |
| WALL SHEATHING | 08/16/2022 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/16/2022 | APPROVED | DCUSHING |
| FOOTER | 08/05/2022 | APPROVED | BTAYLOR |
| ROOF SHEATHING | 07/29/2022 | APPROVED | LMILLER |
| ELECTRIC-TUG | 06/10/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 1:00 | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/16/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/09/2022 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 04/08/2022 | APPROVED | LMILLER |
| WATER METER INSTALLATION REQUEST | 03/29/2022 | APPROVED | CSTONE |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/23/2022 | APPROVED | TSTAUFFACHER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/08/2022 | 08/09/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/16/2022 | 05/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/16/2022 | 05/16/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/14/2022 | 02/15/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/14/2022 | 02/15/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/14/2022 | 02/18/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/14/2022 | 02/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 02/08/2022 | 02/10/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | COMPLETE | 02/07/2022 | 02/09/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/07/2022 | 02/11/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | HOLD | 02/07/2022 | 02/08/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need to have correct outlet spacing on second floor. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 02/07/2022 | 02/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/07/2022 | 02/08/2022 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 02/07/2022 | 02/07/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/07/2022 | 02/14/2022 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM no proposed flow arrows on site plan | |||
| ZON | HOLD | 02/07/2022 | 02/08/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Site Plan States 1 story please correct that |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/03/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 03/07/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/07/2023 |
| CONNECTION FEES | ¤25.00 | 02/24/2022 |
| METER - DEPOSIT | ¤60.00 | 02/24/2022 |
| WATER-METER | ¤467.09 | 02/24/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/24/2022 |
| INSPECTION - RESIDENTIAL | ¤957.00 | 02/24/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤271.44 | 02/24/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 02/24/2022 |
| IMPACT FEE FIRE | ¤388.65 | 02/24/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 02/24/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/24/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 02/24/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 02/24/2022 |
| SURCHARGE FS 533.721 | ¤13.21 | 02/24/2022 |
| SURCHARGE - FS 468.631 | ¤19.82 | 02/24/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/24/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/24/2022 |
| SW ENG PRE APRON | ¤30.00 | 02/24/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/24/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/24/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 02/24/2022 |
| SEWER INSPECTION | ¤25.00 | 02/24/2022 |
| SEWER CAPITAL FACILITY | ¤2,607.06 | 02/24/2022 |
| WATER CAPITAL FACILITY FEE | ¤2,436.75 | 02/24/2022 |
| SITE PLAN 30 | ¤30.00 | 02/24/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,920.62 |