Permit #2022020410

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-0670
CONDITIONED SPACE: 3732 sqft
GARAGE: 1040 sqft
SCREEN PORCH (SOLID ROOF) : 710 sqft
OPENED PORCH (WITH ROOF) : 63 sqft
GARAGE: 517 sqft
OPENED PORCH (WITH ROOF) : 89 sqft
Total Square Footage: 6151 sqft
Block: 00000
Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II
Job Phone: 386-445-2012
Location Address: 27 SCARLET OAK CIR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/03/2022
NOC: RECORDED
Applicant name: JOHN NICHOLAS CORDASCI
Owner: BROWN NEIL & SHARON KLEIN H&W

Address

86 RYAN DR

PALM COAST, FL 32164

Lot: 0670
Contracted Stated Job Value: ¤613,277.00
Job Description: single family residence
Type: CN

Contractor

SKYWAY BUILDERS INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 354786

PALM COAST, FL 32135

CBC1263769 (Exp: 08/31/2024) 386-445-2012

Sub Contractors

MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
RICHARD GARY WILSON JR
Status Location Address Mailing Address State License Number Phone
ACTIVE

1504 OLD MOODY BLVD

BUNNELL, FL 32110

UNIT 6

BUNNELL, FL 32110

CAC1817645 (Exp: 08/31/2026) 386-586-6290
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
MARK B SOWERS
Status Location Address State License Number Phone
ACTIVE

609 FOURTH ST

BUNNELL, FL 32110

35616 (Exp: 08/31/2026) 386-225-1753

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/13/2023 FINAL APPROVED BTAYLOR
U -UTILITY RESIDENTIAL FINAL 09/13/2023 FINAL APPROVED LFITZGERALD
ELEVATION CERTIFICATE-FINAL APPROVAL 09/12/2023 APPROVED JMYERS
GAS ROUGH 09/07/2023 APPROVED MGIBSON
GAS FINAL 09/07/2023 APPROVED MGIBSON
Note: 9/6/2023 - PREVIOUS INSPECTION NOTES 9/5/2023 - PREVIOUS INSPECTION NOTES ALL APPLIANCES TOBE HOOKED UP BEFORE GAS FINAL 9-6-23 1. Regulator is not vented properly. 2. Need clearifcation on piping to equiptment. 3. Pool heater has no regulator.
GAS FINAL 09/06/2023 Disapproved - NO FEE BTAYLOR
Note: 9/5/2023 - PREVIOUS INSPECTION NOTES ALL APPLIANCES TOBE HOOKED UP BEFORE GAS FINAL 9-6-23 1. Regulator is not vented properly. 2. Need clearifcation on piping to equiptment. 3. Pool heater has no regulator.
GAS FINAL 09/05/2023 Disapproved - NO FEE MGIBSON
Note: ALL APPLIANCES TOBE HOOKED UP BEFORE GAS FINAL
GAS ROUGH 09/05/2023 APPROVED MGIBSON
U-CROSS CONNECTION 08/31/2023 APPROVED DHANEY
Note: 8/29/2023 3:41:38 PM- PREVIOUS INSPECTION NOTES City Hall will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed.
U-CROSS CONNECTION 08/30/2023 CANCELLED BY APPLICANT BBEMBRY
Note: City Hall will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed.
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/29/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------ 8/28/2023 - PREVIOUS INSPECTION NOTES Sec 300.01 D2 . All undeveloped properties must be properly identified on the site plan and Final Survey vacant or improved.
ROW FIELD SURVEY /GRADING CERTIFICATION 08/29/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 08/29/2023 FINAL APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - FINAL APRON (AFTER POUR) 08/29/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/28/2023 Disapproved - NO FEE PFLANAGAN
Note: Sec 300.01 D2 . All undeveloped properties must be properly identified on the site plan and Final Survey vacant or improved.
U - SEWER TIE IN 07/07/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 07/07/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 07/06/2023 APPROVED PFLANAGAN
Note: ALL CORRECTIONS MADE READY FOR PAVERS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------------------- 7/5/2023 - PREVIOUS INSPECTION NOTES THERE ARE AREAS ON LEFT SIDE OF DRIVEWAY THAT DONT HAVE THE MINIMUM OF PAVER BASE ------------------------------------------------------------------------------------------------- 6/30/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE PAVER BASE ON LEFT SIDE OF CIRCLE AND FROM GARAGE TO THE STREET ALL BASE NEEDS TO BE COMPACTED MORE LIKE UP AGAINST THE GARAGE IS. --------------------------------------------------------------------------------------------------- READY TO POUR PAVER RESTRAINTS ONLY . BEFORE YOU PUT ANY PAVERS DOWN NEED TO CALL IN FOR THE PRE POUR INSPECTIONS WITH ALL PAVER BASE SPREAD AND COMPACTED TO THE CITYS STANDARTS. CAN NOT POUR ANY OTHER CONCRETE AT THIS TIME.
ROW- PRE-APRON (PRE-POUR) 07/05/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: THERE ARE AREAS ON LEFT SIDE OF DRIVEWAY THAT DONT HAVE THE MINIMUM OF PAVER BASE ------------------------------------------------------------------------------------------------- 6/30/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE MORE PAVER BASE ON LEFT SIDE OF CIRCLE AND FROM GARAGE TO THE STREET ALL BASE NEEDS TO BE COMPACTED MORE LIKE UP AGAINST THE GARAGE IS. --------------------------------------------------------------------------------------------------- READY TO POUR PAVER RESTRAINTS ONLY . BEFORE YOU PUT ANY PAVERS DOWN NEED TO CALL IN FOR THE PRE POUR INSPECTIONS WITH ALL PAVER BASE SPREAD AND COMPACTED TO THE CITYS STANDARTS. CAN NOT POUR ANY OTHER CONCRETE AT THIS TIME.
ROW- PRE-APRON (PRE-POUR) 06/29/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO HAVE MORE PAVER BASE ON LEFT SIDE OF CIRCLE AND FROM GARAGE TO THE STREET ALL BASE NEEDS TO BE COMPACTED MORE LIKE UP AGAINST THE GARAGE IS. --------------------------------------------------------------------------------------------------- READY TO POUR PAVER RESTRAINTS ONLY . BEFORE YOU PUT ANY PAVERS DOWN NEED TO CALL IN FOR THE PRE POUR INSPECTIONS WITH ALL PAVER BASE SPREAD AND COMPACTED TO THE CITYS STANDARTS. CAN NOT POUR ANY OTHER CONCRETE AT THIS TIME.
ROW- PAVER RESTRAINTS 04/24/2023 APPROVED - AS NOTED PFLANAGAN
Note: READY TO POUR PAVER RESTRAINTS ONLY . BEFORE YOU PUT ANY PAVERS DOWN NEED TO CALL IN FOR THE PRE POUR INSPECTIONS WITH ALL PAVER BASE SPREAD AND COMPACTED TO THE CITYS STANDARTS. CAN NOT POUR ANY OTHER CONCRETE AT THIS TIME.
ELECTRIC - EARLY POWER 04/14/2023 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 Notification sent to FPL 4-14-23 1. Emailed FPL at 9:16.
GAS ROUGH 01/18/2023 APPROVED MGIBSON
INSULATION 01/18/2023 APPROVED AGAETANO
LATH/BRICK/ WATER BARRIER 01/12/2023 APPROVED LMILLER
ALL ROUGH 01/06/2023 APPROVED RMARTIN
Note: New inspection due to canceled inspection 11/16/2022 - PREVIOUS INSPECTION NOTES
ALL ROUGH 01/05/2023 CANCELLED BY APPLICANT WEB
Note: 11/16/2022 - PREVIOUS INSPECTION NOTES
ALL ROUGH 11/16/2022 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2420 Above top plate in order to spray foam insulate - still needs below top plate
ALL ROUGH 11/16/2022 CANCELLED BY APPLICANT AGAETANO
WINDOW NAILING 11/16/2022 APPROVED AGAETANO
Note: SGD frame install approved
ELECTRIC-TUG 10/07/2022 APPROVED - AS NOTED DCUSHING
Note: Notification sent to FPL
ALL ROUGH 08/31/2022 APPROVED - AS NOTED DCUSHING
Note: Above top plate in order to spray foam insulate - still needs below top plate
ELECTRIC-TUG 08/16/2022 APPROVED AGAETANO
WALL SHEATHING 07/26/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/26/2022 APPROVED DCUSHING
ROOF VALLEY & METAL 07/26/2022 APPROVED DCUSHING
ELEV CERT-FOUNDATION APPROVAL 07/25/2022 APPROVED JMYERS
FOUND SURVEY APPROVED (OFFICE) 06/28/2022 APPROVED TBAKER
TIE BEAM / LINTEL 05/19/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION 1. Please submit a revision to the building department for the entry door that was added to the right of the aSGD at the back of the lanai. 2. Missing dowel at the left of the toilet window. Noted on drawings. 3. Cracked mortor joint at the same lintel.
TIE BEAM / LINTEL 05/12/2022 Disapproved - NO FEE AGAETANO
Note: 1. Please submit a revision to the building department for the entry door that was added to the right of the aSGD at the back of the lanai. 2. Missing dowel at the left of the toilet window. Noted on drawings. 3. Cracked mortor joint at the same lintel.
MONOLITHIC SLAB 04/04/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 04/01/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 03/04/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
PLFM COMPLETE 09/12/2023 09/12/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM HOLD 09/06/2023 09/11/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM On the foundation elevation certificate, A7 had diagram 1A, now it is 1B please revise or explain change. Per new elevation certificate instructions, for A8 a-f if there are no openings put N/A. C2 b and c need to have N/A if there are no elevations. C2 f and g need to have a box checked for either Natural or Finished grade.
PLFM HOLD 09/05/2023 09/05/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A new elevation certificate has been release by FEMA and must be used as well as new instructions on how to fill it out. The LAG and HAG in C2 f and g appear to be incorrect. I do not see any elevations adjacent to the building at 11.2', and there are higher elevations than 11.5' adjacent to the building. Please revise. There does not appear to be a seal in the required box in Section D, please make sure seal is visible and in the correct location.
GAS COMPLETE 08/29/2023 09/05/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 08/28/2023 08/29/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 08/28/2023 08/29/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 01/17/2023 01/18/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
PLUM COMPLETE 01/17/2023 01/18/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
PLFM COMPLETE 07/25/2022 07/25/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The foundation elevation certificate has been approved. Please provide final prior to receiving CO.
PLFM HOLD 07/20/2022 07/20/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM A8 a, b, c need to be N/A not 0. A9 b, c need to be N/A not 0. Section D, the seal needs to be shaded if it is raised so it can be seen, the surveyor needs to sign and date on top of the seal.
ENGIN1 COMPLETE 06/28/2022 06/28/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/28/2022 06/28/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 05/17/2022 05/17/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ELEC COMPLETE 05/17/2022 05/17/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 02/24/2022 02/24/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLFM COMPLETE 02/24/2022 02/24/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved. However, at foundation there needs to be a date on top of the seal as well as the signature.
ENGIN1 COMPLETE 02/24/2022 02/25/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 02/24/2022 03/02/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON HOLD 02/15/2022 02/15/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM This lot lies in three flood zones. Please make sure they are all listed on site plan/survey It is AE, X and 0.2%
BLD COMPLETE 02/15/2022 02/15/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
PLFM HOLD 02/15/2022 02/15/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The following comments are in regards to the Elevation Certificate: A4 needs to have a use noted. A9 b and c need to be N/A. B1 needs to say City of Palm Coast. Section D, surveyor needs to sign and date on top of the seal.
ENGIN1 COMPLETE 02/15/2022 02/15/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 02/15/2022 02/23/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
PLFM HOLD 02/08/2022 02/08/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM This property falls within AE and X zone. Please correct site plan and survey to reflect the correct flood zones. If the structure falls within the Special Flood Hazard Area, elevation certificates will be required at construction, foundation, and final.
BLD HOLD 02/07/2022 02/08/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide product approval of truss plates on specification sheet per F.S. 553.842.
CUSVC COMPLETE 02/07/2022 02/14/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 02/07/2022 02/08/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/07/2022 02/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 02/07/2022 02/08/2022
Note: Released By: TONI CHURCHILL - -
MECH COMPLETE 02/07/2022 02/08/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/07/2022 02/14/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON HOLD 02/07/2022 02/08/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan/Survey has incorrect flood information

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 09/06/2023
PLAN REVIEW - REVISION ¤32.50 09/06/2023
PLAN REVIEW - REVISION ¤32.50 09/06/2023
PLAN REVIEW - REVISION ¤32.50 09/06/2023
CONTRACTOR CHANGE ¤20.00 09/06/2023
SW ENG REINSPECTION 30 ¤30.00 09/06/2023
SW ENG REINSPECTION 30 ¤30.00 09/06/2023
SW ENG - REVIEW 20 ¤20.00 03/03/2022
SW ENG RES REVIEW 200 ¤200.00 03/03/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 03/03/2022
SEWER INSPECTION ¤25.00 03/03/2022
SITE PLAN 30 ¤30.00 03/03/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 03/03/2022
IMPACT FEE FIRE ¤388.65 03/03/2022
IMPACT FEE PARKS ¤1,455.13 03/03/2022
IMPACT FEE SCHOOL ¤3,600.00 03/03/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 03/03/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 03/03/2022
SURCHARGE FS 533.721 ¤22.85 03/03/2022
SURCHARGE - FS 468.631 ¤34.27 03/03/2022
SW ENG - FOUNDATION SURVEY ¤20.00 03/03/2022
SW ENG INSPECTION 80 ¤80.00 03/03/2022
SW ENG PRE APRON ¤30.00 03/03/2022
CONNECTION FEES ¤25.00 03/03/2022
METER - DEPOSIT ¤60.00 03/03/2022
WATER-METER ¤467.09 03/03/2022
WATER-METER ¤388.04 03/03/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/03/2022
INSPECTION - RESIDENTIAL ¤1,688.50 03/03/2022
PLAN REVIEW - RESIDENTIAL ¤478.92 03/03/2022
Fees Total Due: ¤0.00 Total Paid: ¤12,325.42