I want to search for...
Permit #2022020642
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00210-0260 |
| GARAGE: 683 sqft |
| OPENED PORCH (WITH ROOF) : 406 sqft |
| CONDITIONED SPACE: 2161 sqft |
| Total Square Footage: 3250 sqft |
| Block: 00210 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: (386)446-5161 |
| Location Address: 2 FALLS PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/23/2022 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: IDEAL HOMES AT PALM COAST INC |
|
Address PO BOX 353639 PALM COAST, FL 32135 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/14/2023 | FINAL APPROVED | AGAETANO |
| Note: 4/11/2023 - PREVIOUS INSPECTION NOTES 04-11-2023 1. AC(4TWR5042) and energy calcs (4TWR6042) do not match. 2. Outdoor kitchen plumbing lines need proper caps not test caps. | |||
| ROW - STORMWATER FINAL | 04/12/2023 | FINAL APPROVED | EMADISON |
| Note: ** 04/12/23 CORRECTIONS MADE _______________________________________________________________________________________________________________________ 4/11/2023 - PREVIOUS INSPECTION NOTES ** 04/10/23 NEED TO REPAIR AND SOD SWALE WHERE PORTA-JOHN WAS LACATED | |||
| U -UTILITY RESIDENTIAL FINAL | 04/11/2023 | FINAL APPROVED | DHANEY |
| BLD - BUILDING FINAL | 04/11/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 04-11-2023 1. AC(4TWR5042) and energy calcs (4TWR6042) do not match. 2. Outdoor kitchen plumbing lines need proper caps not test caps. | |||
| ROW - STORMWATER FINAL | 04/11/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 04/10/23 NEED TO REPAIR AND SOD SWALE WHERE PORTA-JOHN WAS LACATED | |||
| U-CROSS CONNECTION | 04/11/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 04/10/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/10/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/10/2023 | APPROVED | EMADISON |
| ROW- PRE-APRON (PRE-POUR) | 02/21/2023 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR DRIVEWAY | |||
| ELECTRIC - EARLY POWER | 02/14/2023 | APPROVED | AGAETANO |
| Note: 02-14-2023 FPL notified at 10:35 am | |||
| GRAVITY SEWER TEST | 12/20/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 12/20/2022 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 12/14/2022 | APPROVED | AGAETANO |
| ROOF VALLEY & METAL | 12/02/2022 | APPROVED | AGAETANO |
| INSULATION | 12/02/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 11/15/2022 | APPROVED | AGAETANO |
| Note: 11/14/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 10-27-2022 Contractor will need to request another roof valley metal when the battons are installed. Contractor indicated the roof tile are on back order and did not want the interior to get wet while all rough trades are working. 11-14-2022 1. Mechanical layout not on site. : NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. 2. Master bath corner tub drain not sealed at slab. | |||
| ALL ROUGH | 11/14/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2467 10-27-2022 Contractor will need to request another roof valley metal when the battons are installed. Contractor indicated the roof tile are on back order and did not want the interior to get wet while all rough trades are working. 11-14-2022 1. Mechanical layout not on site. : NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. 2. Master bath corner tub drain not sealed at slab. | |||
| ROOF VALLEY & METAL | 10/27/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 10-27-2022 Contractor will need to request another roof valley metal when the battons are installed. Contractor indicated the roof tile are on back order and did not want the interior to get wet while all rough trades are working. | |||
| ROOF VALLEY & METAL | 10/25/2022 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2460 09-27-2022 Please remove battons from roof and secure job Johnny/dumpster. | |||
| WALL SHEATHING | 10/25/2022 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2460 09-27-2022 Please remove battons from roof and secure job Johnny/dumpster. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/27/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 09-27-2022 Please remove battons from roof and secure job Johnny/dumpster. | |||
| ELECTRIC-TUG | 09/22/2022 | APPROVED | AGAETANO |
| TIE BEAM / LINTEL | 08/15/2022 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 06/29/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/07/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION depth of footing at front of house does not meet the minimum per plans (see highlighted) 6-7-22 notes above resolved | |||
| LATH/BRICK/ WATER BARRIER | 06/03/2022 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 06/03/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: depth of footing at front of house does not meet the minimum per plans (see highlighted) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/04/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 03/29/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/13/2023 | 04/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/29/2022 | 06/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/29/2022 | 06/29/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/24/2022 | 05/25/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/17/2022 | 02/17/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/17/2022 | 02/17/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/11/2022 | 04/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/10/2022 | 02/15/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/10/2022 | 02/16/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | HOLD | 02/10/2022 | 02/14/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs | |||
| ENGIN1 | COMPLETE | 02/10/2022 | 02/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/10/2022 | 02/15/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/10/2022 | 02/11/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Orientation of Energy calcs does not match the site plan. Revise to match. 2. Plans show R30 insulation in attic and R4.1 on block walls. Energy Calcs say R20 with unvented attic and R5 on block walls. Revise to match. 3. If energy calcs are correct. Revise vented soffit on plans to show non vented. | |||
| SW1 | COMPLETE | 02/10/2022 | 02/14/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/10/2022 | 02/11/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/14/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/14/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/14/2023 |
| CONNECTION FEES | ¤1,077.88 | 02/23/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 02/23/2022 |
| IMPACT FEE FIRE | ¤388.65 | 02/23/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 02/23/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/23/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 02/23/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/23/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 02/23/2022 |
| SURCHARGE FS 533.721 | ¤15.10 | 02/23/2022 |
| SURCHARGE - FS 468.631 | ¤22.65 | 02/23/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/23/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/23/2022 |
| SW ENG PRE APRON | ¤30.00 | 02/23/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/23/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/23/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 02/23/2022 |
| SEWER CREDIT | (¤2,540.35) | 02/23/2022 |
| SEWER INSPECTION | ¤25.00 | 02/23/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 02/23/2022 |
| WATER CREDIT | (¤105.60) | 02/23/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 02/23/2022 |
| SITE PLAN 30 | ¤30.00 | 02/23/2022 |
| METER - DEPOSIT | ¤60.00 | 02/23/2022 |
| WATER- TURN ON | ¤25.00 | 02/23/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/23/2022 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 02/23/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 02/23/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,197.49 |