I want to search for...
Permit #2022020649
Permit Details
Status: COED
| Parcel Id: 29-10-31-5540-00000-0530 |
| GARAGE: 899 sqft |
| SCREEN PORCH (SOLID ROOF) : 862 sqft |
| CONDITIONED SPACE: 3545 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 209 sqft |
| Total Square Footage: 5515 sqft |
| Block: 00000 |
| Subdivision: 1005 - SANCTUARY SUBDIVISION |
| Job Phone: (386) 446-5850 |
| Location Address: 100 OLD OAK DR S |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/18/2022 |
| NOC: RECORDED |
| Applicant name: CHARLES DALLAS RINEK |
| Owner: BADKE BRADFORD J & SUSAN M H&W |
|
Address 38 TAMMYS LANE MUTTONTOWN, NY 11791 |
| Lot: 0530 |
| Contracted Stated Job Value: ¤850,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CHARLES RINEK CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 352502 Palm Coast, FL 32137 |
CGC046080 (Exp: 08/31/2026) | (386) 446-5850 | (386)445-9992 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ERIC FRANCO
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
840 DELTONA BLVD DELTONA, FL 32725 |
STE F2 DELTONA, FL 32725 |
CCC1327280 (Exp: 08/31/2026) | 386-575-4007 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
ROBERT J CATES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
400 NORTH US HIGHWAY 1 ORMOND BEACH, FL 32174 |
EC13003957 (Exp: 08/31/2026) | 386-672-8494 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/12/2024 | FINAL APPROVED | AGAETANO |
| Note: 1/10/2024 - PREVIOUS INSPECTION NOTES 01-10-2024 1. Mini Split breaker size does not match electrical panel. 2. Garage AHU#1 breaker size does not match. 3. Master bath tub rail not installed. 4. Gas line not bonded. | |||
| BLD - BUILDING FINAL | 01/10/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 01-10-2024 1. Mini Split breaker size does not match electrical panel. 2. Garage AHU#1 breaker size does not match. 3. Master bath tub rail not installed. 4. Gas line not bonded. | |||
| ROW - STORMWATER FINAL | 01/10/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE ---------------------------------------------------------------------------------------- 1/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO HAVE ALL BARE AREAS IN VACANT INCLUDING THE AREA BEHIND SWALE IN THE BACK WITH SEED AND STRAW ------------------------------------------------------------------------------------------- 1/5/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO FIX ALL WASH OUTS ALONG RIGHT SIDE OF PROPERTY LINE 2) NEED TO HAVE SEED AND STRAW OR SOD ON ALL BARE AREAS IN THE VACANT 3) AT RIGHT BACK CORNER AT COQUINA ROCK NEED TO HAVE A 5' BUFFER ALONG THE ENTIRE BACK NO MULCH 4) NEED TO HAVE ALL TRASH AND CONSTRUCTION MATERIALS PICKED UP | |||
| ROW - STORMWATER FINAL | 01/09/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO HAVE ALL BARE AREAS IN VACANT INCLUDING THE AREA BEHIND SWALE IN THE BACK WITH SEED AND STRAW ------------------------------------------------------------------------------------------- 1/5/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO FIX ALL WASH OUTS ALONG RIGHT SIDE OF PROPERTY LINE 2) NEED TO HAVE SEED AND STRAW OR SOD ON ALL BARE AREAS IN THE VACANT 3) AT RIGHT BACK CORNER AT COQUINA ROCK NEED TO HAVE A 5' BUFFER ALONG THE ENTIRE BACK NO MULCH 4) NEED TO HAVE ALL TRASH AND CONSTRUCTION MATERIALS PICKED UP | |||
| U -UTILITY RESIDENTIAL FINAL | 01/05/2024 | FINAL APPROVED | JHARDING |
| BLD - BUILDING FINAL | 01/05/2024 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 01/05/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 01/05/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO FIX ALL WASH OUTS ALONG RIGHT SIDE OF PROPERTY LINE 2) NEED TO HAVE SEED AND STRAW OR SOD ON ALL BARE AREAS IN THE VACANT 3) AT RIGHT BACK CORNER AT COQUINA ROCK NEED TO HAVE A 5' BUFFER ALONG THE ENTIRE BACK NO MULCH 4) NEED TO HAVE ALL TRASH AND CONSTRUCTION MATERIALS PICKED UP | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/04/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/04/2024 | APPROVED | EMADISON |
| U-CROSS CONNECTION | 12/27/2023 | APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 07/24/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 7/20/2023 - PREVIOUS INSPECTION NOTES 07-20-2023 Electrical panels not safe off. 07024-2023 FPL notified at 11:40 am | |||
| ELECTRIC - EARLY POWER | 07/20/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 07-20-2023 Electrical panels not safe off. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/14/2023 | APPROVED | GBERTOLA |
| Note: 7/14/23= READY FOR PAVERS ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/30/2023 - PREVIOUS INSPECTION NOTES 06/30/23= READY TO POUR NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. | |||
| ROW- PAVER RESTRAINTS | 06/30/2023 | APPROVED | GBERTOLA |
| Note: READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 06/30/2023 | PARTIALLY APPROVED | GBERTOLA |
| Note: 06/30/23= READY TO POUR NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/21/2023 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 06/21/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 06/21/2023 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 POOL BATH AT REAR OF HOME BY SUMMER KIT. NEEDS TO HAVE A SLEEVE 2X THE DIAMETER OR A RELIEVING ARCH WHERE IT PASSES THROUGH FOOTER WALL | |||
| ROW - DRAINAGE | 06/13/2023 | APPROVED | EMADISON |
| Note: ** 06/13/23 CORRECTIONS MADE IT IS THE BUILDERS RESPONSIBLILTY TO MAINTAIN THE EROSION CONTROL AND DRAINAGE OF YOUR SITE THROUGHOUT CONSTRUCTION ______________________________________________________________________________________________________________________ 6/8/2023 - PREVIOUS INSPECTION NOTES 6/8/2023 - PREVIOUS INSPECTION NOTES ** 06/07/23 BUILDER NEEDS TO REPAIR ALL SILT FENCE AROUND PROPERTY ** YOU WILL ALSO NEED TO REMOVE ALL MATERIAL THAT HAS BEEN PUSHED INTO THE DRAINAGE AREA AT THE REAR OF THE PROPERTY. ** FOLLOW UP INSPECTION 06/13/23 | |||
| ROW - DRAINAGE | 06/08/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: 6/8/2023 - PREVIOUS INSPECTION NOTES ** 06/07/23 BUILDER NEEDS TO REPAIR ALL SILT FENCE AROUND PROPERTY ** YOU WILL ALSO NEED TO REMOVE ALL MATERIAL THAT HAS BEEN PUSHED INTO THE DRAINAGE AREA AT THE REAR OF THE PROPERTY. ** FOLLOW UP INSPECTION 06/13/23 | |||
| WINDOW NAILING | 05/11/2023 | APPROVED | AGAETANO |
| Note: All entry doors. SGD approved. 03-10-2023 | |||
| LATH/BRICK/ WATER BARRIER | 04/28/2023 | APPROVED | AGAETANO |
| Note: 4/25/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2490 4/10/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 03/23/2023 Check at insulation: 1. screws at window over garage-transom 2. All screws for entry doors/sliders are approved 3. Electrical service on meter cans 3/10/2023 - PREVIOUS INSPECTION NOTES 03-10-2023 1. Head test failed. 2. Service not installed. Check at early power. 3. Master bath valve not installed. 4. Energy calcs, UFactor and SHGC do not match. 5. Add window nailing for all entry doors. 04-10-2023 1. Service not installed. Check at early power. 2. Back SGD and front entry not covered. 3. Insulation not complete in mulitple areas. Check all. 4. Head test failed. 04-11-2023 Service not installed. Check at early power. 04-25-2023 Left side of home has three cells that are not filled with concrete. Do not complete this area until the cells are filled and inspected. Entry and back doors are not installed. Approved to complete the other areas. Please schedule andother inspection for the areas that are not ready. | |||
| LATH/BRICK/ WATER BARRIER | 04/25/2023 | PARTIALLY APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2490 4/10/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 03/23/2023 Check at insulation: 1. screws at window over garage-transom 2. All screws for entry doors/sliders are approved 3. Electrical service on meter cans 3/10/2023 - PREVIOUS INSPECTION NOTES 03-10-2023 1. Head test failed. 2. Service not installed. Check at early power. 3. Master bath valve not installed. 4. Energy calcs, UFactor and SHGC do not match. 5. Add window nailing for all entry doors. 04-10-2023 1. Service not installed. Check at early power. 2. Back SGD and front entry not covered. 3. Insulation not complete in mulitple areas. Check all. 4. Head test failed. 04-11-2023 Service not installed. Check at early power. 04-25-2023 Left side of home has three cells that are not filled with concrete. Do not complete this area until the cells are filled and inspected. Entry and back doors are not installed. Approved to complete the other areas. Please schedule andother inspection for the areas that are not ready. | |||
| INSULATION | 04/11/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 4/10/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 03/23/2023 Check at insulation: 1. screws at window over garage-transom 2. All screws for entry doors/sliders are approved 3. Electrical service on meter cans 3/10/2023 - PREVIOUS INSPECTION NOTES 03-10-2023 1. Head test failed. 2. Service not installed. Check at early power. 3. Master bath valve not installed. 4. Energy calcs, UFactor and SHGC do not match. 5. Add window nailing for all entry doors. 04-10-2023 1. Service not installed. Check at early power. 2. Back SGD and front entry not covered. 3. Insulation not complete in mulitple areas. Check all. 4. Head test failed. 04-11-2023 Service not installed. Check at early power. | |||
| INSULATION | 04/10/2023 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2420 03/23/2023 Check at insulation: 1. screws at window over garage-transom 2. All screws for entry doors/sliders are approved 3. Electrical service on meter cans 3/10/2023 - PREVIOUS INSPECTION NOTES 03-10-2023 1. Head test failed. 2. Service not installed. Check at early power. 3. Master bath valve not installed. 4. Energy calcs, UFactor and SHGC do not match. 5. Add window nailing for all entry doors. 04-10-2023 1. Service not installed. Check at early power. 2. Back SGD and front entry not covered. 3. Insulation not complete in mulitple areas. Check all. 4. Head test failed. | |||
| ALL ROUGH | 03/23/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: 03/23/2023 Check at insulation: 1. screws at window over garage-transom 2. All screws for entry doors/sliders are approved 3. Electrical service on meter cans 3/10/2023 - PREVIOUS INSPECTION NOTES 03-10-2023 1. Head test failed. 2. Service not installed. Check at early power. 3. Master bath valve not installed. 4. Energy calcs, UFactor and SHGC do not match. 5. Add window nailing for all entry doors. | |||
| ALL ROUGH | 03/10/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 03-10-2023 1. Head test failed. 2. Service not installed. Check at early power. 3. Master bath valve not installed. 4. Energy calcs, UFactor and SHGC do not match. 5. Add window nailing for all entry doors. | |||
| ROOF VALLEY & METAL | 01/23/2023 | APPROVED | AGAETANO |
| WALL SHEATHING | 01/23/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/02/2022 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2340 09-27-2022 Please remove all loose deris from job site prior to storm. | |||
| TIE BEAM / LINTEL | 09/27/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 09-27-2022 Please remove all loose deris from job site prior to storm. | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/20/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/23/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4. Right side of home and garage doors | |||
| MONOLITHIC SLAB | 06/22/2022 | Disapproved - NO FEE | AGAETANO |
| Note: CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4. Right side of home and garage doors | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/03/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: POOL BATH AT REAR OF HOME BY SUMMER KIT. NEEDS TO HAVE A SLEEVE 2X THE DIAMETER OR A RELIEVING ARCH WHERE IT PASSES THROUGH FOOTER WALL | |||
| WILDLIFE CHECK - ENVIRONMENTAL | 06/03/2022 | APPROVED | JMYERS |
| WATER METER INSTALLATION REQUEST | 06/02/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | CANCEL | 12/27/2023 | 12/27/2023 |
| BLD | CANCEL | 12/27/2023 | 12/27/2023 |
| SW1 | CANCEL | 12/27/2023 | 12/27/2023 |
| BADMIN | INFORMATION | 12/27/2023 | 12/27/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Upon verification from the Building Official, a separate permit is requried for any accessory structures. Please submit for a separate permit under the permit type 'deck'. | |||
| MECH | COMPLETE | 11/27/2023 | 11/28/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/25/2023 | 10/25/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM NO IMPROVEMENTS WITHIN THE ICWW RIGHT OF WAY WITHOUT WRITTEN PERMISSION FROM THE UNITED STATES ARMY CORPS OF ENGINEERS AND THE FLORIDA INLAND NAVIGATCAL DISTRICT. Please remove the path from this area of the site plan until the appropriate approvals from the state agencies are received. | |||
| BLD | HOLD | 10/25/2023 | 11/02/2023 |
| Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM All Comments per FBC Residential 2020 7TH edition 1. PARTIAL REPEAT COMMENT: Provide guard construction details including guard construction materials (NOT PROVIDED), guard design loads for both the guard and guard in-fill components (NOT PROVIDED), guard height, guard top and bottom rails, guard in-fill components materials, maximum openings in guards (NOT PROVIDED DETAIL PROVIDED DOES NOT COMPLY WITH CODE), complete guard attachment details to landings (NOT PROVIDED). R301.5, Table R301.5, R312.1.2, R312.1.3 2. OK. 3. REPEAT COMMENT: LUMBER SPECIES AND GRADE NOT PROVIDED AS REQUESTED. Provide lumber species and grade for deck joists, beams, and posts. R502.1.1, R301.5, Table R301.5, R507.5, R 507.6 4. REPEAT COMMENT: INFORMATION NOT PROVIDED AS REQUESTED. Provide footing detail for posts including concrete strength and dimensions. R402, R403 5. OK. 6. REPEAT COMMENT. INFORMATION NOT PROVIDED AS REQUESTED. Provide details on landings and stairs/ ramps for both sides of walkway. 107.2.1 7. OK. 9. REPEAT COMMENT: INFORMATION NOT PROVIDED AS REQUESTED. Provide handrail detail and type (Type I or Type II) and mounting height and attachment detail. R311.7.8.1, R311.7.8.3. 10. REPEAT COMMENT: INFORMATION NOT PROVIDED AS REQUESTED. Provide live and dead loads for deck. R301.4 R301.5 Table R301.5 11. REPEAT COMMENT: INFORMATON NOT PROVIDED AS REQUESTED. Provide details on wood decking size and thickness 107.2.1 12. REPEAT COMMENT: INFORMATON NOT PROVIDED AS REQUESTED. Provide details on walkway. Part of walkway in an AE flood zone. 107.2.1 13. REPEAT COMMENT: SECOND PLAN SHEET NOT DIGITIALLY SIGNED AND SEALED. PLAN SHEETS MUST BE UPLOADED AS SEPARATE DOCUMENTS. Plans need to be digitally signed, sealed and verfiable per F.S. 471.025 14. REPEAT COMMENT: INFORMATION NOT PROVIDED AS REQUESTED. Proposed walkway encroaches into 100 year floodplain Zone AE. Engineer to provide statement the patios structural system has been designed, connected and anchored to resist flotation, collapse or permanent lateral movement due to structural loads and stresses from flooding equal to the design flood elevation. R322.1.2, R322.1.3. Exception is design according to ASCE 24. | |||
| ENGIN1 | COMPLETE | 10/25/2023 | 10/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 10/25/2023 | 11/03/2023 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Positive flow to front on left side (2nd elv on line), need elevations on aloining lot and if improved or vacant | |||
| BLD | HOLD | 09/27/2023 | 10/03/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All Comments per FBC Residential 2020 7Th edition 1. Provide guard construction details including guard construction materials, guard design loads for both the guard and guard in-fill components, guard height, guard top and bottom rails, guard in-fill components materials, maximum openings in guards, complete guard attachment details to landings. R301.5, Table R301.5, R312.1.2, R312.1.3 2. Provide fastening details for posts to deck, guard top and bottom rails to post and guard in-fill components to guard top and bottom rails and post height. R507 3. Provide lumber species and grade for deck joists, beams, and posts. R502.1.1, R301.5, Table R301.5, R507.5, R 507.6 4. Provide footing detail for posts including concrete strength and dimensions. R402, R403 5. Provide size of posts and attachment details to footing. R507.4.1 6. Provide details on landings and stairs/ ramps for both sides of walkway. 107.2.1 7. Provide construction details, material specs and fasteners on deck support beams and spacing. R507.5.1 9. Provide handrail detail and type (Type I or Type II) and mounting height and attachment detail. R311.7.8.1, R311.7.8.3. 10. Provide live and dead loads for deck. R301.4 R301.5 Table R301.5 11. Provide details on wood decking size and thickness 107.2.1 12. Provide details on walkway. Part of walkway in an AE flood zone. 107.2.1 13. Plans need to be digitally signed, sealed and verfiable per F.S. 471.025 14. Proposed walkway encroaches into 100 year floodplain Zone AE. Engineer to provide statement the patios structural system has been designed, connected and anchored to resist flotation, collapse or permanent lateral movement due to structural loads and stresses from flooding equal to the design flood elevation. R322.1.2, R322.1.3. Exception is design according to ASCE 24. | |||
| ENGIN1 | COMPLETE | 09/27/2023 | 09/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/27/2023 | 09/28/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/27/2023 | 09/27/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. Please provide engineered plans for the proposed "walkover" - which includes material and dimensions. 2. Please provide dimensions and material for proposed "walkover" on site plan. 3. If you are adding the proposed "path" from the owner's property through the Westerly Line of the ICW to the ICW, please add the width and material to the site plan and also the following is required: NO IMPROVEMENTS WITHIN THE ICWW RIGHT OF WAY WITHOUT WRITTEN PERMISSION FROM THE UNITED STATES ARMY CORPS OF ENGINEERS AND THE FLORIDA INLAND NAVIGATCAL DISTRICT. | |||
| BADMIN | INFORMATION | 09/22/2023 | 09/22/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM 1. plans should be submitted under the 'plans' document type (not informational). 2. plans submitted online must be digitally signed and sealed and verifiable. | |||
| BADMIN | INFORMATION | 09/15/2023 | 09/15/2023 |
| Note: Marked INFORMATION By: TIANA BELGROVE - (386)986-3780 - TBELGROVE@PALMCOASTGOV.COM files need to be named what they are. For example NOC would be named NOC | |||
| SW1 | COMPLETE | 06/14/2023 | 06/14/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/09/2023 | 06/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/20/2023 | 03/21/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/16/2023 | 03/16/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition | |||
| BLD | COMPLETE | 09/28/2022 | 09/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 09/23/2022 | 09/23/2022 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) complete revision sheet info | |||
| BADMIN | INFORMATION | 09/23/2022 | 09/23/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM PLANS OR ENGINEERING LETTER HAS TO BE DIGITALLY SIGN. | |||
| ENGIN1 | COMPLETE | 07/19/2022 | 07/20/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/19/2022 | 07/19/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 03/01/2022 | 03/01/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Approved After Action Report has been accepted. | |||
| MECH | COMPLETE | 03/01/2022 | 03/01/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/01/2022 | 03/01/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/25/2022 | 02/25/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Minisplit still shows on Plan A2. Not on Energy Calc. Revise to match 2. AHRI page submitted with Energy Calcs does not match the heatload. Revise to match | |||
| ELEC | COMPLETE | 02/25/2022 | 02/25/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENV | HOLD | 02/25/2022 | 02/25/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Please provide the email from FWC that states they have accepted the after action report. Staff has emailed an example of this to the job email listed on the permit. | |||
| BLD | HOLD | 02/25/2022 | 02/25/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: Second Request 1. Product Approval Specification Sheet per F.S. 553.842: A. Provide product approvals for the proposed wood anchors, wood connectors and truss plates. | |||
| BADMIN | INFORMATION | 02/24/2022 | 02/24/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM YOU HAVE OTHER HOLDS THEY ALL NEED TO BE SEND AT THE SAME TIME NOT JUST THE ELECTRICAL CORRECTION. | |||
| ELEC | HOLD | 02/14/2022 | 02/14/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs | |||
| PLFM | COMPLETE | 02/11/2022 | 02/11/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the site plan submitted on 2/11/22, the structure will not fall within the Special Flood Hazard Area. No elevation certificates will be required. | |||
| PLENV | HOLD | 02/11/2022 | 02/14/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Please provide the Approved After Action Report. The document submitted was just a release of tortoise reservations. | |||
| BLD | HOLD | 02/10/2022 | 02/15/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Product Approval Specification Sheet per F.S. 553.842: A. Provide product approvals for the proposed wood anchors and truss plates. | |||
| CUSVC | COMPLETE | 02/10/2022 | 02/23/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 02/10/2022 | 02/14/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/10/2022 | 02/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/10/2022 | 02/15/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/10/2022 | 02/11/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide duct layout signed by ac contractor 2. Energy code C101.4.2..4 is for commercial provisions. Not able to use is residential. Revise energy calcs without comment and remove AHRI document from packet or count the space as conditioned and provide energy calculations to include space and minisplit 3. Revise floor plan to remove minisplit or revise calcs | |||
| SW1 | COMPLETE | 02/10/2022 | 02/14/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/10/2022 | 02/11/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM on Site plan the Generator pad is encroaching in the 10' setback Please provide a Right of way agreement for the pavered driveway signed and noterized by all homeowers of property. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/12/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/12/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/12/2024 |
| CONTRACTOR CHANGE | ¤40.00 | 01/12/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/12/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/12/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/12/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/18/2022 |
| SW ENG PRE APRON | ¤30.00 | 03/18/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/18/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/18/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 03/18/2022 |
| SEWER INSPECTION | ¤25.00 | 03/18/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 03/18/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 03/18/2022 |
| SITE PLAN 30 | ¤30.00 | 03/18/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 03/18/2022 |
| IMPACT FEE FIRE | ¤388.65 | 03/18/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 03/18/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/18/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 03/18/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 03/18/2022 |
| SURCHARGE FS 533.721 | ¤31.39 | 03/18/2022 |
| SURCHARGE - FS 468.631 | ¤47.09 | 03/18/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/18/2022 |
| CONNECTION FEES | ¤25.00 | 03/18/2022 |
| METER - DEPOSIT | ¤60.00 | 03/18/2022 |
| WATER-METER | ¤467.09 | 03/18/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/18/2022 |
| INSPECTION - RESIDENTIAL | ¤2,337.50 | 03/18/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤663.00 | 03/18/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,345.58 |