I want to search for...

Permit #2022020818

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00140-0200
CONDITIONED SPACE: 1385 sqft
ENCLOSE EXISTING PORCH TO LIVING : 137 sqft
GARAGE: 450 sqft
OPENED PORCH (WITH ROOF) : 72 sqft
CONDITIONED SPACE: 1385 sqft
GARAGE: 450 sqft
OPENED PORCH (WITH ROOF) : 137 sqft
OPENED PORCH (WITH ROOF) : 72 sqft
Total Square Footage: 4088 sqft
Block: 00140
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: 386-627-0430
Location Address: 37 PONCE DELEON DR
Type: DU - DUPLEX
Issue Date: 03/28/2022
NOC: RECORDED
Applicant name: ANNA WIKTORIA LISOWSKI
Owner: GOLDEN FOX PROPERTIES L L C

Address

72 HERNANDEZ AVE

PALM COAST, FL 32137

Lot: 0200
Contracted Stated Job Value: ¤300,000.00
Job Description: Duplex
Type: CN

Contractor

GOLDEN FOX HOME REMODELING, INC
Status Location Address State License Number Phone
ACTIVE

72 HERNANDEZ AVE

PALM COAST, FL 32137

CBC1259266 (Exp: 08/31/2026) 386-627-0430

Sub Contractors

DANIEL J LUSINSKI
Status Location Address Mailing Address State License Number Phone
ACTIVE

389 PALM COAST PARKWAY SW

PALM COAST, FL 32137

#4

PALM COAST, FL 32137

CCC1330133 (Exp: 08/31/2026) 386-338-7926
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
WILLIAM TODD SIKES
Status Location Address State License Number Phone
ACTIVE

83 PORT ROYAL DR

ST AUGUSTINE, FL 32084

EC0002726 (Exp: 08/31/2026) 904-762-8762

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/03/2023 FINAL APPROVED KSANDOE
ROW - FINAL INSPECTION 01/11/2023 APPROVED GBERTOLA
Note: 01/11/23=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD ____________________________________________________________________________________________________________ 1/10/2023 - PREVIOUS INSPECTION NOTES NEED TO REMOVEVE THE HDPE PLASTIC PIPE BY THE EMPTY LOT
U -UTILITY RESIDENTIAL FINAL 01/10/2023 FINAL APPROVED LFITZGERALD
U-CROSS CONNECTION 01/10/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW - FINAL INSPECTION 01/10/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: NEED TO REMOVEVE THE HDPE PLASTIC PIPE BY THE EMPTY LOT
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/04/2023 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 01/04/2023 APPROVED PFLANAGAN
ROW - FINAL APRON (AFTER POUR) 01/04/2023 APPROVED PFLANAGAN
ROW- PRE-APRON (PRE-POUR) 11/29/2022 APPROVED GBERTOLA
Note: 11/29/22=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ---------------------------------------------------------------------------------------------------------------------------- 11/28/2022 - PREVIOUS INSPECTION NOTES 11/28/22= I CAN'T MAKE THE INSPECTION FPL WAS WORKING ON SITE, NEED TO ADD A INSPECTION FOR TOMORROW
ROW- PRE-APRON (PRE-POUR) 11/28/2022 Disapproved - NO FEE GBERTOLA
Note: 11/28/22= I CAN'T MAKE THE INSPECTION FPL WAS WORKING ON SITE, NEED TO ADD A INSPECTION FOR TOMORROW
ELECTRIC - EARLY POWER 11/17/2022 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 1157. Release Power
GRAVITY SEWER TEST 10/31/2022 APPROVED MGIBSON
U - SEWER TIE IN 10/31/2022 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 09/22/2022 APPROVED CSTONE
INSULATION 09/19/2022 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2420 Unit A 5FT head test failed. Check window nailing on lanai at insulation.
ALL ROUGH 08/31/2022 APPROVED - AS NOTED KSANDOE
Note: Unit A 5FT head test failed. Check window nailing on lanai at insulation.
LATH/BRICK/ WATER BARRIER 08/29/2022 APPROVED KSANDOE
FIREWALL FINAL 08/11/2022 APPROVED KSANDOE
FIREWALL DRYWALL NAILING 08/08/2022 APPROVED KSANDOE
Note: THIS IS A REINSPECTION 8-5-22 1. Need to have approved plans on site
FIREWALL DRYWALL NAILING 08/05/2022 Disapproved - NO FEE BTAYLOR
Note: 8-5-22 1. Need to have approved plans on site
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/01/2022 APPROVED KSANDOE
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION cancelled per Peter 7/25/22 Roof sheathing, down cell passed. Check all truss bracing and ties. Missing multiple truss straps throughout. 07/27/2022-- Truss T17 missing all bracing per truss plans Piggy back trusses missing plywood gussets per truss plans Circled on truss prints
ROOF VALLEY & METAL 08/01/2022 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/27/2022 Disapproved - NO FEE TSTAUFFACHER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION cancelled per Peter 7/25/22 Roof sheathing, down cell passed. Check all truss bracing and ties. Missing multiple truss straps throughout. 07/27/2022-- Truss T17 missing all bracing per truss plans Piggy back trusses missing plywood gussets per truss plans Circled on truss prints
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/25/2022 Disapproved - NO FEE KSANDOE
Note: THIS IS A REINSPECTION cancelled per Peter 7/25/22 Roof sheathing, down cell passed. Check all truss bracing and ties. Missing multiple truss straps throughout.
WALL SHEATHING 07/25/2022 APPROVED KSANDOE
Note: THIS IS A REINSPECTION cancelled per Peter
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/22/2022 CANCELLED BY APPLICANT LMILLER
Note: cancelled per Peter
WALL SHEATHING 07/22/2022 CANCELLED BY APPLICANT LMILLER
Note: cancelled per Peter
TIE BEAM / LINTEL 06/17/2022 APPROVED KSANDOE
FOUND SURVEY APPROVED (OFFICE) 06/08/2022 APPROVED TBAKER
MONOLITHIC SLAB 05/12/2022 APPROVED KSANDOE
Note: THIS IS A REINSPECTION plumbing was b roken and repaired, (needs to have 5fgt head test for mono slab approval).
MONOLITHIC SLAB 05/11/2022 Disapproved -FEE REQUIRED LMILLER
Note: plumbing was b roken and repaired, (needs to have 5fgt head test for mono slab approval).
PLUMBING 1ST ROUGH UNDERGROUND 05/02/2022 APPROVED MGIBSON
ROW - DRAINAGE 04/12/2022 APPROVED GBERTOLA
Note: 04/12/22=CORRECTION WERE MADE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 04/12/22 Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative
ROW - DRAINAGE 04/04/2022 Disapproved - NO FEE GBERTOLA
Note: BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 04/12/22 Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative
WATER METER INSTALLATION REQUEST 03/30/2022 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 06/07/2022 06/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/07/2022 06/07/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 04/28/2022 04/28/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 04/27/2022 04/28/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Provide revision cloud showing the changes made to the Foundation. FBCR [A]107.
BLD COMPLETE 03/02/2022 03/02/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SWALE COMPLETE 02/15/2022 05/02/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 02/14/2022 02/16/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Product approval FL 11470 - R4 - for Wood connectors, Simpson MTS cannot be found on Approval Listing. Please verify the number per F.S. 553.842.
CUSVC COMPLETE 02/14/2022 02/23/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 02/14/2022 02/15/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/14/2022 02/15/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 02/14/2022 02/24/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 02/14/2022 02/15/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/14/2022 02/22/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 02/14/2022 02/15/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 02/03/2023
SW ENG - INSPECTION 20 ¤20.00 02/03/2023
SW ENG - INSPECTION 20 ¤20.00 02/03/2023
SW ENG REINSPECTION 20 ¤20.00 02/03/2023
PLAN REVIEW - REVISION ¤32.50 02/03/2023
REINSPECTION RESIDENTIAL ¤40.00 02/03/2023
CONNECTION FEES ¤2,155.76 03/28/2022
SW ENG - REVIEW 20 ¤20.00 03/28/2022
SW ENG RES REVIEW 200 ¤200.00 03/28/2022
3% TRANS IMPACT FEE CREDIT (¤82.14) 03/28/2022
SEWER CREDIT (¤1,300.00) 03/28/2022
SEWER INSPECTION ¤25.00 03/28/2022
SEWER CAPITAL FACILITY ¤9,879.52 03/28/2022
WATER CAPITAL FACILITY FEE ¤7,253.00 03/28/2022
SITE PLAN 30 ¤30.00 03/28/2022
SW ENG INSPECTION 80 ¤80.00 03/28/2022
SW ENG PRE APRON ¤30.00 03/28/2022
METER - DEPOSIT ¤120.00 03/28/2022
WATER- TURN ON ¤50.00 03/28/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/28/2022
INSPECTION - RESIDENTIAL ¤1,003.75 03/28/2022
PLAN REVIEW - RESIDENTIAL ¤284.70 03/28/2022
3% FIRE IMPACT FEE CREDIT (¤23.32) 03/28/2022
IMPACT FEE FIRE ¤777.30 03/28/2022
IMPACT FEE PARKS ¤2,910.26 03/28/2022
IMPACT FEE SCHOOL ¤7,200.00 03/28/2022
IMPACT FEE TRANSPORTATION ¤2,738.00 03/28/2022
WATER -IRRIGATION INSPECTION ¤50.00 03/28/2022
3% PARKS IMPACT FEE CREDIT (¤87.31) 03/28/2022
SURCHARGE FS 533.721 ¤13.83 03/28/2022
SURCHARGE - FS 468.631 ¤20.75 03/28/2022
SW ENG - FOUNDATION SURVEY ¤20.00 03/28/2022
Fees Total Due: ¤0.00 Total Paid: ¤33,571.60