I want to search for...
Permit #2022020818
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00140-0200 |
| CONDITIONED SPACE: 1385 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 137 sqft |
| GARAGE: 450 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| CONDITIONED SPACE: 1385 sqft |
| GARAGE: 450 sqft |
| OPENED PORCH (WITH ROOF) : 137 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| Total Square Footage: 4088 sqft |
| Block: 00140 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 386-627-0430 |
| Location Address: 37 PONCE DELEON DR |
| Type: DU - DUPLEX |
| Issue Date: 03/28/2022 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: GOLDEN FOX PROPERTIES L L C |
|
Address 72 HERNANDEZ AVE PALM COAST, FL 32137 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/03/2023 | FINAL APPROVED | KSANDOE |
| ROW - FINAL INSPECTION | 01/11/2023 | APPROVED | GBERTOLA |
| Note: 01/11/23=AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD ____________________________________________________________________________________________________________ 1/10/2023 - PREVIOUS INSPECTION NOTES NEED TO REMOVEVE THE HDPE PLASTIC PIPE BY THE EMPTY LOT | |||
| U -UTILITY RESIDENTIAL FINAL | 01/10/2023 | FINAL APPROVED | LFITZGERALD |
| U-CROSS CONNECTION | 01/10/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW - FINAL INSPECTION | 01/10/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: NEED TO REMOVEVE THE HDPE PLASTIC PIPE BY THE EMPTY LOT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/04/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/04/2023 | APPROVED | PFLANAGAN |
| ROW - FINAL APRON (AFTER POUR) | 01/04/2023 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 11/29/2022 | APPROVED | GBERTOLA |
| Note: 11/29/22=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ---------------------------------------------------------------------------------------------------------------------------- 11/28/2022 - PREVIOUS INSPECTION NOTES 11/28/22= I CAN'T MAKE THE INSPECTION FPL WAS WORKING ON SITE, NEED TO ADD A INSPECTION FOR TOMORROW | |||
| ROW- PRE-APRON (PRE-POUR) | 11/28/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: 11/28/22= I CAN'T MAKE THE INSPECTION FPL WAS WORKING ON SITE, NEED TO ADD A INSPECTION FOR TOMORROW | |||
| ELECTRIC - EARLY POWER | 11/17/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1157. Release Power | |||
| GRAVITY SEWER TEST | 10/31/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 10/31/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 09/22/2022 | APPROVED | CSTONE |
| INSULATION | 09/19/2022 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 Unit A 5FT head test failed. Check window nailing on lanai at insulation. | |||
| ALL ROUGH | 08/31/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: Unit A 5FT head test failed. Check window nailing on lanai at insulation. | |||
| LATH/BRICK/ WATER BARRIER | 08/29/2022 | APPROVED | KSANDOE |
| FIREWALL FINAL | 08/11/2022 | APPROVED | KSANDOE |
| FIREWALL DRYWALL NAILING | 08/08/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION 8-5-22 1. Need to have approved plans on site | |||
| FIREWALL DRYWALL NAILING | 08/05/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: 8-5-22 1. Need to have approved plans on site | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/01/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION cancelled per Peter 7/25/22 Roof sheathing, down cell passed. Check all truss bracing and ties. Missing multiple truss straps throughout. 07/27/2022-- Truss T17 missing all bracing per truss plans Piggy back trusses missing plywood gussets per truss plans Circled on truss prints | |||
| ROOF VALLEY & METAL | 08/01/2022 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/27/2022 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION cancelled per Peter 7/25/22 Roof sheathing, down cell passed. Check all truss bracing and ties. Missing multiple truss straps throughout. 07/27/2022-- Truss T17 missing all bracing per truss plans Piggy back trusses missing plywood gussets per truss plans Circled on truss prints | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/25/2022 | Disapproved - NO FEE | KSANDOE |
| Note: THIS IS A REINSPECTION cancelled per Peter 7/25/22 Roof sheathing, down cell passed. Check all truss bracing and ties. Missing multiple truss straps throughout. | |||
| WALL SHEATHING | 07/25/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION cancelled per Peter | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/22/2022 | CANCELLED BY APPLICANT | LMILLER |
| Note: cancelled per Peter | |||
| WALL SHEATHING | 07/22/2022 | CANCELLED BY APPLICANT | LMILLER |
| Note: cancelled per Peter | |||
| TIE BEAM / LINTEL | 06/17/2022 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 06/08/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/12/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION plumbing was b roken and repaired, (needs to have 5fgt head test for mono slab approval). | |||
| MONOLITHIC SLAB | 05/11/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: plumbing was b roken and repaired, (needs to have 5fgt head test for mono slab approval). | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/02/2022 | APPROVED | MGIBSON |
| ROW - DRAINAGE | 04/12/2022 | APPROVED | GBERTOLA |
| Note: 04/12/22=CORRECTION WERE MADE BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 04/12/22 Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative | |||
| ROW - DRAINAGE | 04/04/2022 | Disapproved - NO FEE | GBERTOLA |
| Note: BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. INSPECTOR BE BACK ON 04/12/22 Section 105.7 Placement of permit. The building permit or copy shall be kept until the completion of the project. Section 107.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or a duly authorized representative | |||
| WATER METER INSTALLATION REQUEST | 03/30/2022 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/07/2022 | 06/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/07/2022 | 06/07/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/28/2022 | 04/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/27/2022 | 04/28/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Provide revision cloud showing the changes made to the Foundation. FBCR [A]107. | |||
| BLD | COMPLETE | 03/02/2022 | 03/02/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/15/2022 | 05/02/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/14/2022 | 02/16/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Product approval FL 11470 - R4 - for Wood connectors, Simpson MTS cannot be found on Approval Listing. Please verify the number per F.S. 553.842. | |||
| CUSVC | COMPLETE | 02/14/2022 | 02/23/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 02/14/2022 | 02/15/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/14/2022 | 02/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/14/2022 | 02/24/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/14/2022 | 02/15/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/14/2022 | 02/22/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/14/2022 | 02/15/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 02/03/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/03/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/03/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/03/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/03/2023 |
| CONNECTION FEES | ¤2,155.76 | 03/28/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/28/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/28/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 03/28/2022 |
| SEWER CREDIT | (¤1,300.00) | 03/28/2022 |
| SEWER INSPECTION | ¤25.00 | 03/28/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 03/28/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 03/28/2022 |
| SITE PLAN 30 | ¤30.00 | 03/28/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/28/2022 |
| SW ENG PRE APRON | ¤30.00 | 03/28/2022 |
| METER - DEPOSIT | ¤120.00 | 03/28/2022 |
| WATER- TURN ON | ¤50.00 | 03/28/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/28/2022 |
| INSPECTION - RESIDENTIAL | ¤1,003.75 | 03/28/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤284.70 | 03/28/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 03/28/2022 |
| IMPACT FEE FIRE | ¤777.30 | 03/28/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 03/28/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 03/28/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 03/28/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 03/28/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 03/28/2022 |
| SURCHARGE FS 533.721 | ¤13.83 | 03/28/2022 |
| SURCHARGE - FS 468.631 | ¤20.75 | 03/28/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/28/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤33,571.60 |