I want to search for...

Permit #2022020925

Permit Details

Status: COED

Parcel Id: 22-11-31-5902-00000-0550
GARAGE: 796 sqft
CONDITIONED SPACE: 2965 sqft
OPENED PORCH (WITH ROOF) : 56 sqft
SCREEN PORCH (SOLID ROOF) : 396 sqft
GARAGE: 133 sqft
Total Square Footage: 4346 sqft
Block: 00000
Subdivision: 1207 - VILLAGE H-1 AT GRAND HAVEN
Job Phone: 386-445-2012
Location Address: 62 OSPREY CIR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/03/2022
NOC: RECORDED
Applicant name: JOHN NICHOLAS CORDASCI
Owner: BLOOM MARC A

Address

1230 MAYFIELD MANOR DRIVE

ALPHARETTA, GA 30009

Lot: 0550
Contracted Stated Job Value: ¤595,798.00
Job Description: Single Family Residence
Type: CN

Contractor

SKYWAY BUILDERS INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 354786

PALM COAST, FL 32135

CBC1263769 (Exp: 08/31/2024) 386-445-2012

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
RICHARD GARY WILSON JR
Status Location Address Mailing Address State License Number Phone
ACTIVE

1504 OLD MOODY BLVD

BUNNELL, FL 32110

UNIT 6

BUNNELL, FL 32110

CAC1817645 (Exp: 08/31/2026) 386-586-6290
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
MARK B SOWERS
Status Location Address State License Number Phone
ACTIVE

609 FOURTH ST

BUNNELL, FL 32110

35616 (Exp: 08/31/2026) 386-225-1753

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/09/2024 FINAL APPROVED BTAYLOR
ROW - FINAL APRON (AFTER POUR) 12/22/2023 APPROVED RGROSS
Note: 12/11/2023 - PREVIOUS INSPECTION NOTES 12/11/23 PAVERS ON LEFT SIDE OF DRIVEWAY BEHIND SIDEWALK NOT GLUED DOWN ** SEE PHOTOS FOR REFERENCE Inspector Notes from Inspection 9465 12/8/23 ** WALKED PROPERTY AND IT APPEARS AT TIME OF INSPECTION THERE WILL BE NO ADVERSE IMPACT. WILL WORK AS INDICATED IN FINAL SURVEY. ** APPROVED AS NOTED PLEASE REMOVE PORTA JOHN FROM SIDEWALK
GAS ROUGH 12/18/2023 APPROVED MGIBSON
Note: 12/14/2023 - PREVIOUS INSPECTION NOTES
GAS FINAL 12/18/2023 APPROVED MGIBSON
Note: 12/14/2023 - PREVIOUS INSPECTION NOTES
GAS FINAL 12/14/2023 CANCELLED BY APPLICANT MGIBSON
GAS ROUGH 12/14/2023 CANCELLED BY APPLICANT MGIBSON
U -UTILITY RESIDENTIAL FINAL 12/14/2023 FINAL APPROVED LFITZGERALD
Note: 12/11/2023 - PREVIOUS INSPECTION NOTES lower sewer clean out at tap and little more at house-install caps on both
ROW - FINAL APRON (AFTER POUR) 12/11/2023 Disapproved -FEE REQUIRED TPOLACEK
Note: 12/11/23 PAVERS ON LEFT SIDE OF DRIVEWAY BEHIND SIDEWALK NOT GLUED DOWN ** SEE PHOTOS FOR REFERENCE Inspector Notes from Inspection 9465 12/8/23 ** WALKED PROPERTY AND IT APPEARS AT TIME OF INSPECTION THERE WILL BE NO ADVERSE IMPACT. WILL WORK AS INDICATED IN FINAL SURVEY. ** APPROVED AS NOTED PLEASE REMOVE PORTA JOHN FROM SIDEWALK
ROW - STORMWATER FINAL 12/11/2023 APPROVED TPOLACEK
Note: 12/11/23 **At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. Inspector Notes from Inspection 9465 12/8/23 ** WALKED PROPERTY AND IT APPEARS AT TIME OF INSPECTION THERE WILL BE NO ADVERSE IMPACT. WILL WORK AS INDICATED IN FINAL SURVEY. ** APPROVED AS NOTED PLEASE REMOVE PORTA JOHN FROM SIDEWALK
U -UTILITY RESIDENTIAL FINAL 12/11/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: lower sewer clean out at tap and little more at house-install caps on both
ROW FIELD SURVEY /GRADING CERTIFICATION 12/08/2023 APPROVED - AS NOTED TPOLACEK
Note: 12/8/23 ** WALKED PROPERTY AND IT APPEARS AT TIME OF INSPECTION THERE WILL BE NO ADVERSE IMPACT. WILL WORK AS INDICATED IN FINAL SURVEY. ** APPROVED AS NOTED PLEASE REMOVE PORTA JOHN FROM SIDEWALK
U-CROSS CONNECTION 12/08/2023 APPROVED - AS NOTED LFITZGERALD
Note: well irrigation-no cross connection
FINAL SURVEY (OFFICE USE ONLY) 12/08/2023 APPROVED TPOLACEK
ROW- PRE-APRON (PRE-POUR) 09/29/2023 APPROVED PFLANAGAN
Note: ALL CONCRETE NEEDS TO BE 3000PSI WITH FIBER OR WITH METAL MESH IN POURING AREA TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------------------------------------- 9/28/2023 - PREVIOUS INSPECTION NOTES NOT READY TO POUR
ROW- PRE-APRON (PRE-POUR) 09/28/2023 CANCELLED BY APPLICANT PFLANAGAN
Note: NOT READY TO POUR
U - SEWER TIE IN 08/29/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 08/29/2023 APPROVED MGIBSON
ELECTRIC-TUG 08/03/2023 APPROVED - AS NOTED TSTAUFFACHER
Note: 08/03/2023- Release to FPL at 09:30 AM- NOTE: SERVICE CABLE WAS HIT BY PLUMBER! THIS INSPECTION IS FOR NEW METER CAN ONLY-DO NOT SET METER PRIOR TO UNDERGROUND SERVICE REPAIR Inspector Notes from Inspection 2190 Inspector Notes from Inspection 2200 Ok --release to FPl 02/14/2023 2:25 PM 6-9-23 1. Emailed FPL at 10:30.
ELECTRIC - EARLY POWER 06/09/2023 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 Ok --release to FPl 02/14/2023 2:25 PM 6-9-23 1. Emailed FPL at 10:30.
LATH/BRICK/ WATER BARRIER 04/25/2023 APPROVED TSTAUFFACHER
INSULATION 03/29/2023 APPROVED BTAYLOR
Note: 3/28/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2420 03/23/2023: Check at insulation Electric panel needs to be phased out Front windows need to be covered Finish generator circuit 1/11/2023 - PREVIOUS INSPECTION NOTES 1-11-23 Looked over vent pipes and a/c duct work. House is going to be sprayed foamed. Once trades are done call in all rough. 1-12-23 looked at track bolts for slider only. the following notes were added prior and all-rough was not called in yet so I am trasnferring notes here... Looked over vent pipes and a/c duct work. House is going to be sprayed foamed. Once trades are done call in all rough.
INSULATION 03/28/2023 CANCELLED BY APPLICANT BTAYLOR
Note: Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2420 03/23/2023: Check at insulation Electric panel needs to be phased out Front windows need to be covered Finish generator circuit 1/11/2023 - PREVIOUS INSPECTION NOTES 1-11-23 Looked over vent pipes and a/c duct work. House is going to be sprayed foamed. Once trades are done call in all rough. 1-12-23 looked at track bolts for slider only. the following notes were added prior and all-rough was not called in yet so I am trasnferring notes here... Looked over vent pipes and a/c duct work. House is going to be sprayed foamed. Once trades are done call in all rough.
ALL ROUGH 03/23/2023 APPROVED - AS NOTED TSTAUFFACHER
Note: Inspector Notes from Inspection 2420 03/23/2023: Check at insulation Electric panel needs to be phased out Front windows need to be covered Finish generator circuit 1/11/2023 - PREVIOUS INSPECTION NOTES 1-11-23 Looked over vent pipes and a/c duct work. House is going to be sprayed foamed. Once trades are done call in all rough. 1-12-23 looked at track bolts for slider only. the following notes were added prior and all-rough was not called in yet so I am trasnferring notes here... Looked over vent pipes and a/c duct work. House is going to be sprayed foamed. Once trades are done call in all rough.
GAS ROUGH 03/23/2023 APPROVED MGIBSON
Note: 3/22/2023 - PREVIOUS INSPECTION NOTES 12/19/2022 - PREVIOUS INSPECTION NOTES SPOKE TO JOHN GUAGE NOT HOLDING 15 LBS OF PRESSURE, CHECK FOR LEAKS
GAS ROUGH 03/22/2023 Disapproved -FEE REQUIRED MGIBSON
Note: 12/19/2022 - PREVIOUS INSPECTION NOTES SPOKE TO JOHN GUAGE NOT HOLDING 15 LBS OF PRESSURE, CHECK FOR LEAKS
ELECTRIC-TUG 02/14/2023 APPROVED - AS NOTED TSTAUFFACHER
Note: Ok --release to FPl 02/14/2023 2:25 PM
ALL ROUGH 01/12/2023 APPROVED - AS NOTED LMILLER
Note: 1/11/2023 - PREVIOUS INSPECTION NOTES 1-11-23 Looked over vent pipes and a/c duct work. House is going to be sprayed foamed. Once trades are done call in all rough. 1-12-23 looked at track bolts for slider only. the following notes were added prior and all-rough was not called in yet so I am trasnferring notes here... Looked over vent pipes and a/c duct work. House is going to be sprayed foamed. Once trades are done call in all rough.
ALL ROUGH 01/11/2023 CANCELLED BY APPLICANT BTAYLOR
Note: 1-11-23 Looked over vent pipes and a/c duct work. House is going to be sprayed foamed. Once trades are done call in all rough.
GAS ROUGH 12/19/2022 CANCELLED BY APPLICANT MGIBSON
Note: SPOKE TO JOHN
GAS ROUGH 10/10/2022 CANCELLED BY APPLICANT WEB
WALL SHEATHING 08/03/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/03/2022 APPROVED DCUSHING
ROOF VALLEY & METAL 08/03/2022 APPROVED DCUSHING
TIE BEAM / LINTEL 07/01/2022 APPROVED DCUSHING
FOUND SURVEY APPROVED (OFFICE) 05/27/2022 APPROVED TBAKER
MONOLITHIC SLAB 05/06/2022 APPROVED LMILLER
PLUMBING 1ST ROUGH UNDERGROUND 04/29/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 03/16/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 12/12/2023 12/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 12/12/2023 12/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 12/07/2023 12/07/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
ENGIN1 COMPLETE 08/03/2023 08/03/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/03/2023 08/09/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 08/03/2023 08/03/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM from pavers to bands only
GAS COMPLETE 03/21/2023 03/21/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 01/11/2023 01/11/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
PLUM COMPLETE 09/21/2022 09/23/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/27/2022 05/27/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/27/2022 05/27/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 02/25/2022 02/25/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 02/16/2022 02/16/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Product approval FL 15215.9 for swinging door is non- impact but shows impact on specification sheet description. If impact would be needed similar to all exterior windows/doors, submit correct FL number per F.S. 553.842.
CUSVC COMPLETE 02/16/2022 02/24/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 02/16/2022 02/16/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/16/2022 02/16/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 02/16/2022 02/24/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 02/16/2022 02/16/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/16/2022 02/24/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON COMPLETE 02/16/2022 02/17/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 01/09/2024
PLAN REVIEW - REVISION ¤32.50 01/09/2024
PLAN REVIEW - REVISION ¤32.50 01/09/2024
PLAN REVIEW - REVISION ¤32.50 01/09/2024
PLAN REVIEW - REVISION ¤32.50 01/09/2024
REINSPECTION RESIDENTIAL ¤40.00 01/09/2024
REINSPECTION FEE ¤40.00 01/09/2024
SW ENG REINSPECTION 20 ¤20.00 01/09/2024
SW ENG - REVIEW 20 ¤20.00 03/03/2022
SW ENG RES REVIEW 200 ¤200.00 03/03/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 03/03/2022
SEWER INSPECTION ¤25.00 03/03/2022
SITE PLAN 30 ¤30.00 03/03/2022
SURCHARGE FS 533.721 ¤22.19 03/03/2022
SURCHARGE - FS 468.631 ¤33.29 03/03/2022
SW ENG - FOUNDATION SURVEY ¤20.00 03/03/2022
SW ENG INSPECTION 80 ¤80.00 03/03/2022
SW ENG PRE APRON ¤30.00 03/03/2022
CONNECTION FEES ¤25.00 03/03/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 03/03/2022
IMPACT FEE FIRE ¤388.65 03/03/2022
IMPACT FEE PARKS ¤1,455.13 03/03/2022
IMPACT FEE SCHOOL ¤3,600.00 03/03/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 03/03/2022
WATER -IRRIGATION INSPECTION ¤25.00 03/03/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 03/03/2022
METER - DEPOSIT ¤60.00 03/03/2022
METER - DEPOSIT ¤60.00 03/03/2022
WATER-METER ¤467.09 03/03/2022
WATER-METER ¤467.09 03/03/2022
WATER- TURN ON ¤25.00 03/03/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/03/2022
INSPECTION - RESIDENTIAL ¤1,639.00 03/03/2022
PLAN REVIEW - RESIDENTIAL ¤464.88 03/03/2022
Fees Total Due: ¤0.00 Total Paid: ¤12,489.29