Permit #2022020999
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7007-00470-0610 |
| CONDITIONED SPACE: 1196 sqft |
| GARAGE: 985 sqft |
| Total Square Footage: 2181 sqft |
| Block: 00470 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 386-237-0328 |
| Location Address: 166 FRONTIER DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 07/25/2022 |
| NOC: RECORDED |
| Applicant name: JAMES JOSEPH ALBANO |
| Owner: BRUMIT LINDA S & JAMES C MILLER JTWROS |
|
Address 166 FRONTIER DRIVE PALM COAST, FL 32137 |
| Lot: 0610 |
| Contracted Stated Job Value: ¤125,000.00 |
| Job Description: Addition to existing single-family residence |
| Type: CN |
Contractor
ALBANO DESIGNS STUDIOS, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
82 LEE DR PALM COAST, FL 32137 |
CBC050078 (Exp: 08/31/2026) | 386-237-0328 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CRC1332537 (Exp: 08/31/2026) | 386-445-7945 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/30/2023 | FINAL APPROVED | AGAETANO |
| Note: 6/28/2023 - PREVIOUS INSPECTION NOTES 6/23/2023 - PREVIOUS INSPECTION NOTES 6/23/23: 1). Laundry sink hot water is on the wrong side. 2). Energy calcs do not match installed equipment. 3). AHU - small spaces at ceiling penetrations need to be fully sealed along with back of deck area. 4). Missing termite bond certificate. 5). Hosebibb in courtyard area is missing anti-siphon. 06-28-2023 Job Johnny on site. | |||
| BLD - BUILDING FINAL | 06/28/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 6/23/2023 - PREVIOUS INSPECTION NOTES 6/23/23: 1). Laundry sink hot water is on the wrong side. 2). Energy calcs do not match installed equipment. 3). AHU - small spaces at ceiling penetrations need to be fully sealed along with back of deck area. 4). Missing termite bond certificate. 5). Hosebibb in courtyard area is missing anti-siphon. 06-28-2023 Job Johnny on site. | |||
| BLD - BUILDING FINAL | 06/23/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 6/23/23: 1). Laundry sink hot water is on the wrong side. 2). Energy calcs do not match installed equipment. 3). AHU - small spaces at ceiling penetrations need to be fully sealed along with back of deck area. 4). Missing termite bond certificate. 5). Hosebibb in courtyard area is missing anti-siphon. | |||
| ROW - FINAL INSPECTION | 06/23/2023 | FINAL APPROVED | EMADISON |
| Note: ** 06/23/23 PROJECT MANAGER ON SITE EVERYTHING LOOKS GOOD AT THE TIME OF INSPECTION ________________________________________________________________________________________________________________I nspector Notes from Inspection 9270 Sidewalk on the left side goes only as far as the side garage door. An additional sidewalk was formed off the garage to a shed that was not on the site plan. Contractor on site said they would not pour anything more than what was on the site plan. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/23/2023 | FINAL APPROVED | JHARDING |
| ROW- PRE-APRON (PRE-POUR) | 05/18/2023 | APPROVED - AS NOTED | RGROSS |
| Note: Sidewalk on the left side goes only as far as the side garage door. An additional sidewalk was formed off the garage to a shed that was not on the site plan. Contractor on site said they would not pour anything more than what was on the site plan. | |||
| INSULATION | 02/16/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 2/15/2023 - PREVIOUS INSPECTION NOTES 02-15-2023 Dryer vent has been pushed out due to the fire foam spray. Shield plate also needed. Please address. 02-16- 2023 PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL | |||
| INSULATION | 02/16/2023 | APPROVED | PBUCKLEY |
| Note: 2/16/2023 - PREVIOUS INSPECTION NOTES 2/15/2023 - PREVIOUS INSPECTION NOTES 02-15-2023 Dryer vent has been pushed out due to the fire foam spray. Shield plate also needed. Please address. 02-16- 2023 PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL | |||
| INSULATION | 02/15/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 02-15-2023 Dryer vent has been pushed out due to the fire foam spray. Shield plate also needed. Please address. | |||
| ALL ROUGH | 02/03/2023 | APPROVED | AGAETANO |
| Note: 2/2/2023 - PREVIOUS INSPECTION NOTES 1/31/2023 - PREVIOUS INSPECTION NOTES 1/30/2023 - PREVIOUS INSPECTION NOTES 01-31-2023 1. Energy calcs not on site. 2. No head test and 0 pressure on gauge. 3. Shower vent not connected. 4. Job box is a mess. Please organize. Inspection stopped. 02-02-2023 Shower vent not connected. | |||
| ALL ROUGH | 02/02/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 1/31/2023 - PREVIOUS INSPECTION NOTES 1/30/2023 - PREVIOUS INSPECTION NOTES 01-31-2023 1. Energy calcs not on site. 2. No head test and 0 pressure on gauge. 3. Shower vent not connected. 4. Job box is a mess. Please organize. Inspection stopped. 02-02-2023 Shower vent not connected. | |||
| ALL ROUGH | 01/31/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 1/30/2023 - PREVIOUS INSPECTION NOTES 01-31-2023 1. Energy calcs not on site. 2. No head test and 0 pressure on gauge. 3. Shower vent not connected. 4. Job box is a mess. Please organize. Inspection stopped. | |||
| ALL ROUGH | 01/30/2023 | CANCELLED BY APPLICANT | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/27/2023 | APPROVED | AGAETANO |
| Note: 1/26/2023 - PREVIOUS INSPECTION NOTES 1/9/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 12-13-2022 Breezeway valley underlayment is not tied into existing roof. Contractor can proceed at own risk. 01-09-2023 1. Multiple framing members missed. Check all. 2. Please provide gable end wall details. 01/26/2023-Missing truss engineering the rest of the tie downs and decking are approved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/26/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: 1/9/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 12-13-2022 Breezeway valley underlayment is not tied into existing roof. Contractor can proceed at own risk. 01-09-2023 1. Multiple framing members missed. Check all. 2. Please provide gable end wall details. 01/26/2023-Missing truss engineering the rest of the tie downs and decking are approved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/09/2023 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2467 12-13-2022 Breezeway valley underlayment is not tied into existing roof. Contractor can proceed at own risk. 01-09-2023 1. Multiple framing members missed. Check all. 2. Please provide gable end wall details to the building department for review and have approved drawings on site for inspection. | |||
| ROOF VALLEY & METAL | 12/13/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 12-13-2022 Breezeway valley underlayment is not tied into existing roof. Contractor can proceed at own risk. | |||
| ROOF SHEATHING | 11/29/2022 | APPROVED | AGAETANO |
| TIE BEAM / LINTEL | 10/24/2022 | APPROVED | AGAETANO |
| MONOLITHIC SLAB | 09/27/2022 | APPROVED | AGAETANO |
| Note: 9/26/2022 - PREVIOUS INSPECTION NOTES 09-26-2022 Irrigation line cannot be under the slab. This was discussed with the plumbing inspector at an earlier time. | |||
| MONOLITHIC SLAB | 09/26/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 09-26-2022 Irrigation line cannot be under the slab. This was discussed with the plumbing inspector at an earlier time. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/20/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: REMOVE ALL IRRIGATION LINES FROM ALL FOOTERS BEFORE MONOLITHIC SLAB INSPECTION FOR PLACEMENT OF FOOTER STEEL AND CONCRETE |
Review History
| Department | Status | Date In | Date Out |
| MECH | HOLD | 06/27/2023 | 06/27/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy calcs need to be signed by the builder | |||
| MECH | COMPLETE | 06/27/2023 | 06/27/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/22/2023 | 06/22/2023 |
| Note: Marked INFORMATION By: TIANA BELGROVE - - TBELGROVE@PALMCOASTGOV.COM Document uploaded does not match the description. | |||
| BLD | COMPLETE | 01/19/2023 | 01/20/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/19/2022 | 10/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/19/2022 | 10/19/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/21/2022 | 07/22/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/20/2022 | 07/21/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Emailed copy of agreement for owners to sign and have notarized once original is turned in we can release the permit | |||
| ZON | HOLD | 07/13/2022 | 07/13/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please wait till you have both remaining Utility letters and then submit them together so that we can review. | |||
| ZON | HOLD | 07/07/2022 | 07/07/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please provide the utility letters in order to release permit | |||
| ZON | HOLD | 06/29/2022 | 06/29/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Please provide the termination of easement application paperwork and utility letters. We have to have this so we can create the agreement that the owners will sign and turn in to us for recording. We cannot release this permit without these documents and agreement completed to release easement | |||
| SW1 | COMPLETE | 06/29/2022 | 07/07/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/21/2022 | 06/21/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM New site plan submitted missing rear setback REPEAT COMMENT: Please provide the termination of easement application paperwork and utility letters. We have to have this so we can create the agreement that the owners will sign and turn in to us for recording. | |||
| SW1 | HOLD | 06/21/2022 | 06/27/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ELEVATION ON THE LEFT SIDE DONT LET THE WATER DRAIN AROUND THE ADDITION | |||
| SW1 | COMPLETE | 06/07/2022 | 06/07/2022 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/01/2022 | 06/01/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Please provide the termination of easement application paperwork and utility letters. We have to have this so we can create the agreement that the owners will sign and turn in to us for recording. | |||
| SW1 | HOLD | 06/01/2022 | 06/09/2022 |
| Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM NEED TO REVIEW STORMWATER CHECK LIST | |||
| ZON | HOLD | 05/17/2022 | 05/17/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Please provide the termination of easement application paperwork and utility letters. We have to have this so we can create the agreement that the owners will sign and turn in to us for recording. | |||
| SW1 | HOLD | 05/17/2022 | 05/24/2022 |
| Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. | |||
| ELEC | COMPLETE | 04/18/2022 | 04/19/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/18/2022 | 04/19/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/18/2022 | 04/19/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/18/2022 | 04/25/2022 |
| Note: Held By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM NEED TO LOOK AT STORMWATER CHECKLIST FOR REQUIREMENTS | |||
| ENGIN1 | COMPLETE | 04/18/2022 | 04/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/18/2022 | 04/19/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide the termination of easement application paperwork and utility letters. We have to have this so we can create the agreement that the owners will sign and turn in to us for recording. | |||
| BLD | HOLD | 02/17/2022 | 02/17/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1.Provide Product Approval Wood Connectors, Wood Anchors and Truss Plates. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| ELEC | HOLD | 02/17/2022 | 02/17/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in gallery room. NEC 2017 210.52 2. Need smoke alarm inside and outside of bedroom. FRC 2020 314 & 315 3. Submit electric load calcs, show existing service size and prove the existing service can accommmondate the addition. 4. Need note on plan that the light above the tub will meet the requirements of NEC 2017 410.10 (A) and (D) | |||
| MECH | HOLD | 02/17/2022 | 02/18/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1 Energy Calcs need to be signed by the builder per 107.1 FBC Residential 2020 7th edition 2. Revise plans to show unvented soffit to match Energy calcs 3. Provide duct layout signed by AC contractor | |||
| PLUM | COMPLETE | 02/17/2022 | 02/17/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/17/2022 | 02/25/2022 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM you will need to look at the sample site plan and resubmit a site plan with elevations and drainage features for stormwater drainage it will be in the informational and look at the sample site plan | |||
| ZON | HOLD | 02/17/2022 | 02/17/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a landscape plan for review Please provide the termination of easement application paperwork and utility letters. We have to have this so we can create the agreement that the owners will sign and turn in to us for recording. Please provide a survey/site plan showing all platted easements. We need this to be able to show the easement that will be released for the addition to cross over the easements located on both properties. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/27/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/27/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/22/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/22/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/22/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/25/2022 |
| INSPECTION - RESIDENTIAL | ¤478.50 | 07/25/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤135.72 | 07/25/2022 |
| RECORDING FEE REIMBURSE DOC | ¤35.50 | 07/25/2022 |
| SURCHARGE FS 533.721 | ¤5.52 | 07/25/2022 |
| SURCHARGE - FS 468.631 | ¤8.29 | 07/25/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/25/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/25/2022 |
| SITE PLAN 30 | ¤30.00 | 07/25/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤948.53 |