Permit #2022021073
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-0390 |
| CONDITIONED SPACE: 2487 sqft |
| GARAGE: 433 sqft |
| OPENED PORCH (WITH ROOF) : 208 sqft |
| Total Square Footage: 3128 sqft |
| Block: 00000 |
| Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION |
| Job Phone: 863-647-5815 |
| Location Address: 78 DEL PALMA DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/04/2022 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: HOSEIN WARREN A & RACHAEL R AMAR-HOSEIN H&W |
|
Address 2565 SANDS WAY COOPER CITY, FL 33026 |
| Lot: 0390 |
| Contracted Stated Job Value: ¤378,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/24/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3/23/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 3-23-23 1. No cover on attic light. 2. No hot water in front bedroom bathroom sink. 3. Energy cals don't match equipment. 4. No breaker identifcation for air handler. 3-24-23 1. No breaker identifcation for air handler. | |||
| BLD - BUILDING FINAL | 03/24/2023 | FINAL APPROVED | BTAYLOR |
| Note: 3/24/2023 - PREVIOUS INSPECTION NOTES 3/23/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 3-23-23 1. No cover on attic light. 2. No hot water in front bedroom bathroom sink. 3. Energy cals don't match equipment. 4. No breaker identifcation for air handler. 3-24-23 1. No breaker identifcation for air handler. | |||
| BLD - BUILDING FINAL | 03/23/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3/15/2023 - PREVIOUS INSPECTION NOTES 3-23-23 1. No cover on attic light. 2. No hot water in front bedroom bathroom sink. 3. Energy cals don't match equipment. 4. No breaker identifcation for air handler. | |||
| BLD - BUILDING FINAL | 03/15/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| U-CROSS CONNECTION | 01/30/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/30/2023 | FINAL APPROVED | JHARDING |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/17/2023 | APPROVED | GBERTOLA |
| ROW - STORMWATER FINAL | 01/17/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 01/17/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/17/2023 | APPROVED | GBERTOLA |
| ROW- PAVER RESTRAINTS | 11/21/2022 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 11/15/2022 | APPROVED | RGROSS |
| Note: READY FOR PAVERS 10/20/2022 - PREVIOUS INSPECTION NOTES READY TO POUR CONCRETE FOR THE FOLLOWING 1. APRON 2. SIDEWALK 3. PAVER RESTRAINTS BEFORE THE NEXT PRE POUR THE BASE MUST BE DOWN AND COMPACTED WITH NO PAVERS LAYED IF ANY PAVERS ARE LAYED WILL MAKE YOU PULL SO WE CAN DO THE INSPECTION | |||
| ELECTRIC - EARLY POWER | 10/24/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: Inspector Notes from Inspection 2200 Re-entered inspection to add FPL Notification NOTIFICATION SENT TO FPL | |||
| ROW- PRE-APRON (PRE-POUR) | 10/20/2022 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR CONCRETE FOR THE FOLLOWING 1. APRON 2. SIDEWALK 3. PAVER RESTRAINTS BEFORE THE NEXT PRE POUR THE BASE MUST BE DOWN AND COMPACTED WITH NO PAVERS LAYED IF ANY PAVERS ARE LAYED WILL MAKE YOU PULL SO WE CAN DO THE INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 09/23/2022 | APPROVED | DCUSHING |
| INSULATION | 09/09/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2420 THIS IS A REINSPECTION THIS IS A REINSPECTION insulation was installed prior to all-rough. Need to remove foil paper where wires are coverec (I was able to see the tops of the exterior walls as the foil paper was pulled down at the tops), However there wer several areas where the wires need additional standoffs to maintain 1-1/4 inch from edge (check all). 9-6-22 Cancelled Per Mike 9/9/22 DO NOT INSULATE PRIOR TO ALL ROUGH INSPECTION, NEXT TIME THIS WILL RESULT IN ALL INSULATION REMOVED, THERE SEEMS TO BE A PATTERN OF THIS HAPPENING AND ALSO MOVING IN TO HOMES PRIOR TO GETTING YOUR FINALS. PLEASE FOLLOW THE CORRECT PROCEDURES 9-8-22 insulation was installed prior to all-rough. Need to remove foil paper where wires are coverec (I was able to see the tops of the exterior walls as the foil paper was pulled down at the tops), However there wer several areas where the wires need additional standoffs to maintain 1-1/4 inch from edge (check all). (WHEN I ARRIVED THE INSULATION CREW WAS HERE ATTACHING THE FOIL SHEETS PRIOR TO THE ALLROUGH PASSING AFTER HAVING FAILED PRIOR FOR WIRES TO CLOSE TO STRUCTURAL MEMBERS, (tTHE FIR WIRE I CHECKED IN THE FRONT RIGHT BEDROOM WAS TO CLOSE TO THE FURRING STRUP) (LOW VOLTAGE) INSPECTION STOPPED! 9-9-22 notes above resolved | |||
| INSULATION | 09/08/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspector Notes from Inspection 2420 THIS IS A REINSPECTION THIS IS A REINSPECTION insulation was installed prior to all-rough. Need to remove foil paper where wires are coverec (I was able to see the tops of the exterior walls as the foil paper was pulled down at the tops), However there wer several areas where the wires need additional standoffs to maintain 1-1/4 inch from edge (check all). 9-6-22 Cancelled Per Mike 9/9/22 DO NOT INSULATE PRIOR TO ALL ROUGH INSPECTION, NEXT TIME THIS WILL RESULT IN ALL INSULATION REMOVED, THERE SEEMS TO BE A PATTERN OF THIS HAPPENING AND ALSO MOVING IN TO HOMES PRIOR TO GETTING YOUR FINALS. PLEASE FOLLOW THE CORRECT PROCEDURES 9-8-22 insulation was installed prior to all-rough. Need to remove foil paper where wires are coverec (I was able to see the tops of the exterior walls as the foil paper was pulled down at the tops), However there wer several areas where the wires need additional standoffs to maintain 1-1/4 inch from edge (check all). (WHEN I ARRIVED THE INSULATION CREW WAS HERE ATTACHING THE FOIL SHEETS PRIOR TO THE ALLROUGH PASSING AFTER HAVING FAILED PRIOR FOR WIRES TO CLOSE TO STRUCTURAL MEMBERS, (tTHE FIR WIRE I CHECKED IN THE FRONT RIGHT BEDROOM WAS TO CLOSE TO THE FURRING STRUP) (LOW VOLTAGE) INSPECTION STOPPED! | |||
| ALL ROUGH | 09/07/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION insulation was installed prior to all-rough. Need to remove foil paper where wires are coverec (I was able to see the tops of the exterior walls as the foil paper was pulled down at the tops), However there wer several areas where the wires need additional standoffs to maintain 1-1/4 inch from edge (check all). 9-6-22 Cancelled Per Mike 9/9/22 DO NOT INSULATE PRIOR TO ALL ROUGH INSPECTION, NEXT TIME THIS WILL RESULT IN ALL INSULATION REMOVED, THERE SEEMS TO BE A PATTERN OF THIS HAPPENING AND ALSO MOVING IN TO HOMES PRIOR TO GETTING YOUR FINALS. PLEASE FOLLOW THE CORRECT PROCEDURES | |||
| ALL ROUGH | 09/06/2022 | CANCELLED BY APPLICANT | LMILLER |
| Note: THIS IS A REINSPECTION insulation was installed prior to all-rough. Need to remove foil paper where wires are coverec (I was able to see the tops of the exterior walls as the foil paper was pulled down at the tops), However there wer several areas where the wires need additional standoffs to maintain 1-1/4 inch from edge (check all). 9-6-22 Cancelled Per Mike | |||
| ALL ROUGH | 09/01/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: insulation was installed prior to all-rough. Need to remove foil paper where wires are coverec (I was able to see the tops of the exterior walls as the foil paper was pulled down at the tops), However there wer several areas where the wires need additional standoffs to maintain 1-1/4 inch from edge (check all). | |||
| ROOF VALLEY & METAL | 07/06/2022 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/29/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION Need approved signed sealed letter from truss engineer for altered/cut trusses (C03) (drop legs and webbing were cut and trusses were altered, no alterations or cutting of trusses allowed per truss engineering). | |||
| ROOF SHEATHING | 06/27/2022 | APPROVED | LMILLER |
| WALL SHEATHING | 06/27/2022 | APPROVED | LMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/27/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Need approved signed sealed letter from truss engineer for altered/cut trusses (C03) (drop legs and webbing were cut and trusses were altered, no alterations or cutting of trusses allowed per truss engineering). | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/23/2022 | APPROVED | TBAKER |
| ELECTRIC-TUG | 06/14/2022 | APPROVED | DCUSHING |
| Note: OK to call FPL | |||
| ELECTRIC-TUG | 06/14/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: Re-entered inspection to add FPL Notification | |||
| TIE BEAM / LINTEL | 06/13/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION need documents on site for inspection | |||
| TIE BEAM / LINTEL | 06/10/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: need documents on site for inspection | |||
| MONOLITHIC SLAB | 04/22/2022 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/30/2022 | APPROVED | LMILLER |
| GRAVITY SEWER TEST | 03/30/2022 | APPROVED | LMILLER |
| U - SEWER TIE IN | 03/30/2022 | APPROVED | LMILLER |
| WATER METER INSTALLATION REQUEST | 03/09/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/24/2023 | 03/24/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/23/2022 | 06/23/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/23/2022 | 06/23/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/01/2022 | 03/01/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/01/2022 | 03/01/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/18/2022 | 02/18/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM 1. Roofing Worksheet is incorrectly filled -in. Product approval (FL No.) for roofing tile and underlayment are both the same. Revise and also coordinate witn Product approval specification sheet for clarity per F.S. 553.842. | |||
| CUSVC | COMPLETE | 02/18/2022 | 02/25/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 02/18/2022 | 02/18/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/18/2022 | 02/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/18/2022 | 02/28/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/18/2022 | 02/18/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Design location on Heatload needs to match Energy Calcs (Daytona Beach) | |||
| SW1 | COMPLETE | 02/18/2022 | 02/25/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/18/2022 | 02/18/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 02/18/2022 | 02/25/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/28/2023 |
| CONNECTION FEES | ¤25.00 | 03/04/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 03/04/2022 |
| IMPACT FEE FIRE | ¤388.65 | 03/04/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 03/04/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/04/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 03/04/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 03/04/2022 |
| SURCHARGE FS 533.721 | ¤14.30 | 03/04/2022 |
| SURCHARGE - FS 468.631 | ¤21.45 | 03/04/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/04/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/04/2022 |
| SW ENG PRE APRON | ¤30.00 | 03/04/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/04/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/04/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 03/04/2022 |
| SEWER INSPECTION | ¤25.00 | 03/04/2022 |
| SEWER CAPITAL FACILITY | ¤2,607.06 | 03/04/2022 |
| WATER CAPITAL FACILITY FEE | ¤2,436.75 | 03/04/2022 |
| SITE PLAN 30 | ¤30.00 | 03/04/2022 |
| METER - DEPOSIT | ¤60.00 | 03/04/2022 |
| WATER-METER | ¤467.09 | 03/04/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/04/2022 |
| INSPECTION - RESIDENTIAL | ¤1,039.50 | 03/04/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤294.84 | 03/04/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,109.24 |