I want to search for...
Permit #2022021172
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00100-0030 |
| CONDITIONED SPACE: 2712 sqft |
| GARAGE: 764 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| PATIO/DECK (NO ROOF) : 442 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00100 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 407-808-8155 |
| Location Address: 93 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/09/2022 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
NICHOLAS KEITH REX
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1408 HAMLIN UNIT B SAINT CLOUD, FL 34771 |
EC13006779 (Exp: 08/31/2026) | 407-873-2231 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/25/2023 | FINAL APPROVED | BTAYLOR |
| Note: 5/24/2023 - PREVIOUS INSPECTION NOTES 5-24-23 1. Sanitary drain backed up. | |||
| BLD - BUILDING FINAL | 05/24/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-24-23 1. Sanitary drain backed up. | |||
| U-CROSS CONNECTION | 05/22/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has re-claim irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 05/22/2023 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 05/22/2023 | APPROVED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 05/22/2023 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/12/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/12/2023 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 05/03/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 FPL notified at 10:28 5-3-23 1. Emailed FPL at 11:23. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/21/2023 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS -------------------------------------------------------------------------------- 4/13/2023 10:05:16 AM- PREVIOUS INSPECTION NOTES NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. READY TO POUR | |||
| ROW- PAVER RESTRAINTS | 04/13/2023 | APPROVED | GBERTOLA |
| Note: READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 04/13/2023 | PARTIALLY APPROVED | GBERTOLA |
| Note: NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. READY TO POUR | |||
| TIE BEAM / LINTEL | 03/27/2023 | APPROVED | BTAYLOR |
| GRAVITY SEWER TEST | 02/28/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 02/28/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 02/22/2023 | APPROVED | BTAYLOR |
| INSULATION | 01/24/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 01/17/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 11/04/2022 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/04/2022 | APPROVED | KSANDOE |
| Note: 10/27/2022 - PREVIOUS INSPECTION NOTES 10/21/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION THIS IS A REINSPECTION Roof Sheathing only per notes from contractor approved on 9-13-22 10-27-22 From the list above the first thing I checked was still defficient Please complete the prior list before recalling Wrong tie downs installed Inspection Stopped 10-21-22 1. Wrong tie downs installed. 2.Straps not nailed off. 3. Piggy backs not per detail. Engineering packet not on site. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 10/21/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION THIS IS A REINSPECTION Roof Sheathing only per notes from contractor approved on 9-13-22 10-21-22 1. Wrong tie downs installed. 2.Straps not nailed off. 3. Piggy backs not per detail. Engineering packet not on site. 10-27-22 From the list above the first thing I checked was still defficient Please complete the prior list before recalling Wrong tie downs installed Inspection Stopped | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/21/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Roof Sheathing only per notes from contractor approved on 9-13-22 10-21-22 1. Wrong tie downs installed. 2.Straps not nailed off. 3. Piggy backs not per detail. Engineering packet not on site. | |||
| ROOF VALLEY & METAL | 09/27/2022 | APPROVED | LMILLER |
| Note: roof sheathing approved 0n 9-13-22 Roof Valley Metal approved | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/13/2022 | PARTIALLY APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION Roof Sheathing only per notes from contractor approved on 9-13-22 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/08/2022 | CANCELLED BY APPLICANT | LMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 09/07/2022 | APPROVED | TBAKER |
| ELECTRIC-TUG | 06/27/2022 | APPROVED - AS NOTED | LMILLER |
| Note: FPL notified at 10:28 | |||
| TIE BEAM / LINTEL | 06/21/2022 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 05/03/2022 | APPROVED | RMARTIN |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/28/2022 | APPROVED | MGIBSON |
| FOOTER | 03/29/2022 | APPROVED | DCUSHING |
| WATER METER INSTALLATION REQUEST | 03/24/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/15/2023 | 03/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/07/2022 | 09/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/07/2022 | 09/07/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/02/2022 | 09/06/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/01/2022 | 08/01/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/05/2022 | 08/01/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/09/2022 | 03/09/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/09/2022 | 03/14/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/09/2022 | 03/09/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/01/2022 | 03/01/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/01/2022 | 03/01/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 02/23/2022 | 02/25/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | HOLD | 02/22/2022 | 02/22/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Review comments below applies if the gas fireplace in the living room would be installed. 1. Factory - built fireplace shall be listed and labeled and shall be installed in accordance with the conditions of the listing. It shall also be tested in accordance with UL 127 per FBCR 7th Ed. Sec. 1004.1. 2. Indicate on plan if gas would be supplied by others, otherwise provide gas contractor per F.S. 489 and gas riser diagram with signature and license number of gas contractor per FBC 7th Ed. Sec. 107.3. | |||
| CUSVC | COMPLETE | 02/22/2022 | 02/28/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 02/22/2022 | 02/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/22/2022 | 02/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/22/2022 | 02/23/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/22/2022 | 02/22/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/22/2022 | 02/28/2022 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/22/2022 | 02/23/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Banding must wrap around windows facing right of way |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 05/23/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 05/23/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/23/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/23/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/23/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/23/2023 |
| CONNECTION FEES | ¤25.00 | 03/09/2022 |
| METER - DEPOSIT | ¤60.00 | 03/09/2022 |
| WATER-METER | ¤467.09 | 03/09/2022 |
| WATER-METER | ¤388.04 | 03/09/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/09/2022 |
| INSPECTION - RESIDENTIAL | ¤973.50 | 03/09/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤276.12 | 03/09/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 03/09/2022 |
| IMPACT FEE FIRE | ¤388.65 | 03/09/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 03/09/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/09/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 03/09/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 03/09/2022 |
| SURCHARGE FS 533.721 | ¤13.43 | 03/09/2022 |
| SURCHARGE - FS 468.631 | ¤20.15 | 03/09/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/09/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/09/2022 |
| SW ENG PRE APRON | ¤30.00 | 03/09/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/09/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/09/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 03/09/2022 |
| SEWER INSPECTION | ¤25.00 | 03/09/2022 |
| SITE PLAN 30 | ¤30.00 | 03/09/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,371.58 |