Permit #2022021470

Permit Details

Status: COED

Parcel Id: 16-11-31-1260-00000-0130
CONDITIONED SPACE: 2547 sqft
GARAGE: 764 sqft
SCREEN PORCH (SOLID ROOF) : 261 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
Total Square Footage: 3625 sqft
Block: 00000
Subdivision: 2081 - Creekside Village at Grand Haven
Job Phone: 386-931-1633
Location Address: 2 CREEKSIDE CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/07/2022
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: SHPERLING ALEXANDER & ANNA TARASOVA H&W

Address

578 DUHILL DRIVE

LAKE ZURICH, IL 60047

Lot: 0130
Contracted Stated Job Value: ¤416,700.00
Job Description: SINGLE FAMILY RESIDENTIAL
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/19/2023 FINAL APPROVED BTAYLOR
U-CROSS CONNECTION 05/18/2023 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 05/18/2023 APPROVED RGROSS
ROW - STORMWATER FINAL 05/18/2023 APPROVED - AS NOTED RGROSS
Note: Builder has graded a large berm across the back and left side of the property to prevent water from flowing onto the neighbors. The Berm directs water to the front sidewalk and street. The drainage easily meets the city mimimum standard for storm water drainage.
U -UTILITY RESIDENTIAL FINAL 05/18/2023 FINAL APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/08/2023 APPROVED PFLANAGAN
Note: Inspector Notes from Inspection 9270 PASSING AS NOTED DO IN THE COMMUNITY SIDEWALK ARE THE SAME READY FOR CONCRETE PLEASE PUT A 5" DECO DRAINAGE ON THE SIDEWALK WHERE THE DRAINAGE IS ON LEFT SIDE --------------------------------------------------------------------------------- 3/27/2023 - PREVIOUS INSPECTION NOTES ** 03/27/23 READY TO POUR DRIVEWAY AND SIDEWALK ON RIGHT SIDE AT THIS TIME ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** PRE-POUR INSPECTION WILL BE FINALIZED AFTER LEFT SIDE SIDEWALK HAS BEEN POURED
ROW FIELD SURVEY /GRADING CERTIFICATION 05/08/2023 APPROVED PFLANAGAN
ROW- PRE-APRON (PRE-POUR) 05/02/2023 APPROVED - AS NOTED PFLANAGAN
Note: PASSING AS NOTED DO IN THE COMMUNITY SIDEWALK ARE THE SAME READY FOR CONCRETE PLEASE PUT A 5" DECO DRAINAGE ON THE SIDEWALK WHERE THE DRAINAGE IS ON LEFT SIDE --------------------------------------------------------------------------------- 3/27/2023 - PREVIOUS INSPECTION NOTES ** 03/27/23 READY TO POUR DRIVEWAY AND SIDEWALK ON RIGHT SIDE AT THIS TIME ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** PRE-POUR INSPECTION WILL BE FINALIZED AFTER LEFT SIDE SIDEWALK HAS BEEN POURED
ROW- PROJECT STATUS 04/24/2023 APPROVED PFLANAGAN
Note: WENT OUT AND LOOK AT GRADEING OF THE LOT LOOKS GOOD AT THIS TIME. THE FINAL SURVEY WILL SHOW THE REAL PICTURE OF THE DRAINAGE.
ROW- PRE-APRON (PRE-POUR) 03/27/2023 PARTIALLY APPROVED EMADISON
Note: ** 03/27/23 READY TO POUR DRIVEWAY AND SIDEWALK ON RIGHT SIDE AT THIS TIME ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** PRE-POUR INSPECTION WILL BE FINALIZED AFTER LEFT SIDE SIDEWALK HAS BEEN POURED
ELECTRIC - EARLY POWER 03/16/2023 APPROVED - AS NOTED BTAYLOR
Note: 3-16-23 1. Emailed FPL at 11:19.
LATH/BRICK/ WATER BARRIER 01/10/2023 APPROVED BTAYLOR
INSULATION 01/10/2023 APPROVED BTAYLOR
Note: 12/27/2022 - PREVIOUS INSPECTION NOTES 12-27-2022 1. Gaps in coffered ceiling in great room, entry, and kitchen ceiling areas. Check all.
INSULATION 12/27/2022 Disapproved - NO FEE AGAETANO
Note: 12-27-2022 1. Gaps in coffered ceiling in great room, entry, and kitchen ceiling areas. Check all.
ALL ROUGH 12/20/2022 APPROVED LMILLER
ROW - DRAINAGE 12/20/2022 APPROVED PFLANAGAN
Note: ALL SILT FENCE HAS BEEN FIXED -------------------------------------------------------------------------- 12/19/2022 - PREVIOUS INSPECTION NOTES THERE ARE STILL SOME OF THE SILT FENCE THAT IS FAILING NEED TO FIX ALL AREAS NEXT INSPECTION ON 12/20/22 YOU HAVE 4 MORE INSPECTION BEFORE A STOP WORK WILL BE PUT ON THIS CONSTRUCTION SITE ---------------------------------------------------------------------------------------------------------- 12/16/22 INSPECTOR CANCELLED WILL REINSPECT ON 12/19/22 12/12/22= Biulder need to re establish the silt fence. inspector be back 12/16/22= 12/12/22 - Resident called and said that part of the silt fence has failed and needs re-set. No need to make contact with any residence. 7/11/22 NEED TO PUT SILT FENCE ALL THE WAY TO CORNER TO KEEP SEDIMENT FROM WASHING OUT INTO ROAD AND CURBING. NEXT INSPECTION ON 7/13/22. YOU HAVE 4 MORE INSPECTION BEFORE YOU WILL HAVE A STOP WORK ORDER ON THIS CONSTRUCTION SITE IF THE CORRECTION ARE NOT MADE . ------------------------------------------------------------------------------------------------------------------------------- NOTE: Inspector's result for the Drainage inspection dated 7/5/22 was Incorrect. Inspector went to the wrong address. *Silt fence issue still needs addressed. Silt fence needs to be extended to the corner. *Sediment in the curb and street needs removed.
ROW - DRAINAGE 12/19/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: THERE ARE STILL SOME OF THE SILT FENCE THAT IS FAILING NEED TO FIX ALL AREAS NEXT INSPECTION ON 12/20/22 YOU HAVE 4 MORE INSPECTION BEFORE A STOP WORK WILL BE PUT ON THIS CONSTRUCTION SITE ---------------------------------------------------------------------------------------------------------- 12/16/22 INSPECTOR CANCELLED WILL REINSPECT ON 12/19/22 12/12/22= Biulder need to re establish the silt fence. inspector be back 12/16/22= 12/12/22 - Resident called and said that part of the silt fence has failed and needs re-set. No need to make contact with any residence. 7/11/22 NEED TO PUT SILT FENCE ALL THE WAY TO CORNER TO KEEP SEDIMENT FROM WASHING OUT INTO ROAD AND CURBING. NEXT INSPECTION ON 7/13/22. YOU HAVE 4 MORE INSPECTION BEFORE YOU WILL HAVE A STOP WORK ORDER ON THIS CONSTRUCTION SITE IF THE CORRECTION ARE NOT MADE . ------------------------------------------------------------------------------------------------------------------------------- NOTE: Inspector's result for the Drainage inspection dated 7/5/22 was Incorrect. Inspector went to the wrong address. *Silt fence issue still needs addressed. Silt fence needs to be extended to the corner. *Sediment in the curb and street needs removed.
ROW - DRAINAGE 12/16/2022 CANCELLED BY INSPECTOR EMADISON
Note: 12/12/2022 - PREVIOUS INSPECTION NOTES 12/12/22= Biulder need to re establish the silt fence. inspector be back 12/16/22= 12/12/22 - Resident called and said that part of the silt fence has failed and needs re-set. No need to make contact with any residence. 7/11/22 NEED TO PUT SILT FENCE ALL THE WAY TO CORNER TO KEEP SEDIMENT FROM WASHING OUT INTO ROAD AND CURBING. NEXT INSPECTION ON 7/13/22. YOU HAVE 4 MORE INSPECTION BEFORE YOU WILL HAVE A STOP WORK ORDER ON THIS CONSTRUCTION SITE IF THE CORRECTION ARE NOT MADE . ------------------------------------------------------------------------------------------------------------------------------- NOTE: Inspector's result for the Drainage inspection dated 7/5/22 was Incorrect. Inspector went to the wrong address. *Silt fence issue still needs addressed. Silt fence needs to be extended to the corner. *Sediment in the curb and street needs removed.
ROW - DRAINAGE 12/12/2022 Disapproved - NO FEE GBERTOLA
Note: 12/12/22= Biulder need to re establish the silt fence. inspector be back 12/16/22= 12/12/22 - Resident called and said that part of the silt fence has failed and needs re-set. No need to make contact with any residence. 7/11/22 NEED TO PUT SILT FENCE ALL THE WAY TO CORNER TO KEEP SEDIMENT FROM WASHING OUT INTO ROAD AND CURBING. NEXT INSPECTION ON 7/13/22. YOU HAVE 4 MORE INSPECTION BEFORE YOU WILL HAVE A STOP WORK ORDER ON THIS CONSTRUCTION SITE IF THE CORRECTION ARE NOT MADE . ------------------------------------------------------------------------------------------------------------------------------- NOTE: Inspector's result for the Drainage inspection dated 7/5/22 was Incorrect. Inspector went to the wrong address. *Silt fence issue still needs addressed. Silt fence needs to be extended to the corner. *Sediment in the curb and street needs removed.
U - SEWER TIE IN 11/29/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 11/29/2022 APPROVED MGIBSON
ROOF VALLEY & METAL 10/24/2022 APPROVED AGAETANO
WALL SHEATHING 10/04/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/04/2022 APPROVED DCUSHING
FOUND SURVEY APPROVED (OFFICE) 09/27/2022 APPROVED TBAKER
TIE BEAM / LINTEL 08/25/2022 APPROVED LMILLER
MONOLITHIC SLAB 08/09/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION need compaction report 8-9-22 notes above resolved via video conference
MONOLITHIC SLAB 08/08/2022 Disapproved - NO FEE LMILLER
Note: need compaction report
MONOLITHIC SLAB 08/05/2022 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 07/15/2022 APPROVED AGAETANO
ROW - DRAINAGE 07/11/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 7/11/22 NEED TO PUT SILT FENCE ALL THE WAY TO CORNER TO KEEP SEDIMENT FROM WASHING OUT INTO ROAD AND CURBING. NEXT INSPECTION ON 7/13/22. YOU HAVE 4 MORE INSPECTION BEFORE YOU WILL HAVE A STOP WORK ORDER ON THIS CONSTRUCTION SITE IF THE CORRECTION ARE NOT MADE . ------------------------------------------------------------------------------------------------------------------------------- NOTE: Inspector's result for the Drainage inspection dated 7/5/22 was Incorrect. Inspector went to the wrong address. *Silt fence issue still needs addressed. Silt fence needs to be extended to the corner. *Sediment in the curb and street needs removed.
ROW - DRAINAGE 07/08/2022 Disapproved -FEE REQUIRED RGROSS
Note: NOTE: Inspector's result for the Drainage inspection dated 7/5/22 was Incorrect. Inspector went to the wrong address. *Silt fence issue still needs addressed. Silt fence needs to be extended to the corner. *Sediment in the curb and street needs removed. Next Inspection 7/12/22. Builder Notified and has Corrections scheduled for 7/9/22.
ROW - DRAINAGE 07/05/2022 PARTIALLY APPROVED RGROSS
Note: Nobody home. No issues observed. Rescheduled by inspector. Conrad Troha 7/8/22 Inspector went to the wrong address
ROW - DRAINAGE 06/28/2022 Disapproved -FEE REQUIRED CTROHA
Note: I inspected the property and found the silt from the pad and yard area on the Creekside Ct side has eroded into the road down to the storm drain and into the neighboring lot. 1) Remove silt from street, gutter, road, and drain. 2) install silt fencing to the corner. Re-inspection next Tuesday 7/5/22
ROW - DRAINAGE 04/19/2022 APPROVED - AS NOTED PFLANAGAN
Note: THIS IS A REINSPECTION NOTE TO INPSECTOR: 4 Creekside Ct. Please make contact about construction site sand and debre flowing onto their driveway. Spoke on phone but homeowner requesting a visit around 1:00 pm 4/12/22 (1) NEED TO PUT UP SILT FENCE AROUND THE ENTIRE LOT AND HAVE ONE ACCESS POINT TO HELP SEDIMENT FROM WASHING DOWN IN TO STORM DRAIN (2) NEED TO RESUMIT A NEW SITE PLAN THAT SHOWS LOT TO DRAIN FROM BACK TO FRONT NEXT INSPECTION ON 4/19/22 4/19/22 LOOKS GOOD ON THE SILT FENCE WILL BE BACK TO CHECK
ROW - DRAINAGE 04/12/2022 Disapproved - NO FEE PFLANAGAN
Note: NOTE TO INPSECTOR: 4 Creekside Ct. Please make contact about construction site sand and debre flowing onto their driveway. Spoke on phone but homeowner requesting a visit around 1:00 pm 4/12/22 (1) NEED TO PUT UP SILT FENCE AROUND THE ENTIRE LOT AND HAVE ONE ACCESS POINT TO HELP SEDIMENT FROM WASHING DOWN IN TO STORM DRAIN (2) NEED TO RESUMIT A NEW SITE PLAN THAT SHOWS LOT TO DRAIN FROM BACK TO FRONT NEXT INSPECTION ON 4/19/22
WATER METER INSTALLATION REQUEST 03/30/2022 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
MECH COMPLETE 05/17/2023 05/18/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 05/15/2023 05/16/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 12/12/2022 12/19/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 12/12/2022 12/12/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/12/2022 12/12/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/27/2022 09/27/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/27/2022 09/27/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 09/16/2022 09/16/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/16/2022 09/16/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/16/2022 09/23/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/08/2022 09/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 09/08/2022 09/08/2022
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM House does not meet minimum front setback of 25'.
SW1 COMPLETE 06/29/2022 07/07/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 06/29/2022 06/29/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 06/29/2022 07/05/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
MECH COMPLETE 06/22/2022 06/22/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 06/03/2022 06/03/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/03/2022 06/03/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/03/2022 06/09/2022
Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM Revised plan meets the City's minimum requirements
BLD COMPLETE 02/28/2022 02/28/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 02/28/2022 03/04/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 02/28/2022 03/01/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/28/2022 03/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 02/28/2022 03/02/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 02/28/2022 02/28/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/28/2022 03/03/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON COMPLETE 02/28/2022 03/01/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 05/19/2023
CONTRACTOR CHANGE ¤40.00 05/19/2023
SW ENG - INSPECTION 20 ¤20.00 05/19/2023
SW ENG - INSPECTION 20 ¤20.00 05/19/2023
SW ENG - INSPECTION 20 ¤20.00 05/19/2023
SW ENG - INSPECTION 20 ¤20.00 05/19/2023
SW ENG - INSPECTION 20 ¤20.00 05/19/2023
SW ENG - INSPECTION 20 ¤20.00 05/19/2023
SW ENG - INSPECTION 20 ¤20.00 05/19/2023
SW ENG - INSPECTION 20 ¤20.00 05/19/2023
SW ENG - INSPECTION 20 ¤20.00 05/19/2023
SW ENG - INSPECTION 20 ¤20.00 05/19/2023
SW ENG REINSPECTION 20 ¤20.00 05/19/2023
PLAN REVIEW - REVISION ¤32.50 05/19/2023
PLAN REVIEW - REVISION ¤32.50 05/19/2023
CONNECTION FEES ¤25.00 03/07/2022
SW ENG - REVIEW 20 ¤20.00 03/07/2022
SW ENG RES REVIEW 200 ¤200.00 03/07/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 03/07/2022
SEWER INSPECTION ¤25.00 03/07/2022
SITE PLAN 30 ¤30.00 03/07/2022
METER - DEPOSIT ¤60.00 03/07/2022
WATER-METER ¤467.09 03/07/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/07/2022
INSPECTION - RESIDENTIAL ¤1,146.75 03/07/2022
PLAN REVIEW - RESIDENTIAL ¤325.26 03/07/2022
SW ENG INSPECTION 80 ¤80.00 03/07/2022
SW ENG PRE APRON ¤30.00 03/07/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 03/07/2022
IMPACT FEE FIRE ¤388.65 03/07/2022
IMPACT FEE PARKS ¤1,455.13 03/07/2022
IMPACT FEE SCHOOL ¤3,600.00 03/07/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 03/07/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 03/07/2022
SURCHARGE FS 533.721 ¤15.71 03/07/2022
SURCHARGE - FS 468.631 ¤23.57 03/07/2022
SW ENG - FOUNDATION SURVEY ¤20.00 03/07/2022
Fees Total Due: ¤0.00 Total Paid: ¤11,379.13