I want to search for...

Permit #2022021503

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00100-0060
CONDITIONED SPACE: 2712 sqft
GARAGE: 764 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
PATIO/DECK (NO ROOF) : 442 sqft
Total Square Footage: 4009 sqft
Block: 00100
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 407-808-8155
Location Address: 99 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/07/2022
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0060
Contracted Stated Job Value: ¤300,000.00
Job Description: single family residence
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
NICHOLAS KEITH REX
Status Location Address State License Number Phone
ACTIVE

1408 HAMLIN UNIT B

SAINT CLOUD, FL 34771

EC13006779 (Exp: 08/31/2026) 407-873-2231

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/16/2023 FINAL APPROVED BTAYLOR
Note: 6/15/2023 - PREVIOUS INSPECTION NOTES 6-15-23 1. Master bath needs to be grouted.
BLD - BUILDING FINAL 06/15/2023 Disapproved - NO FEE BTAYLOR
Note: 6-15-23 1. Master bath needs to be grouted.
ROW - STORMWATER FINAL 06/15/2023 APPROVED GBERTOLA
Note: 6/15/23=At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/14/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN CURB AND GUTTER 2) THERE IS AN HIGH SPOT BY THE AC UNIT NEED TO LOWER SO WATER CAN FLOW TO THE FRONT 3) NEED TO CLEAN ALL DIRT OUT IN THE CATCH BASIN IN FRONT OF HOUSE ----------------------------------------------------------------------------------- 6/13/2023 - PREVIOUS INSPECTION NOTES TALK TO ONE OF CM THERE ARE THINGS NEED TO BE DONE BEFORE THE ROW FINAL AND AFTER POUR IS APPROVED
U -UTILITY RESIDENTIAL FINAL 06/14/2023 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 06/14/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO CLEAN CURB AND GUTTER 2) THERE IS AN HIGH SPOT BY THE AC UNIT NEED TO LOWER SO WATER CAN FLOW TO THE FRONT 3) NEED TO CLEAN ALL DIRT OUT IN THE CATCH BASIN IN FRONT OF HOUSE ----------------------------------------------------------------------------------- 6/13/2023 - PREVIOUS INSPECTION NOTES TALK TO ONE OF CM THERE ARE THINGS NEED TO BE DONE BEFORE THE ROW FINAL AND AFTER POUR IS APPROVED
ROW - FINAL APRON (AFTER POUR) 06/14/2023 APPROVED PFLANAGAN
Note: 6/13/2023 - PREVIOUS INSPECTION NOTES TALK TO ONE OF CM THERE ARE THINGS NEED TO BE DONE BEFORE THE ROW FINAL AND AFTER POUR IS APPROVED
ROW - FINAL APRON (AFTER POUR) 06/13/2023 CANCELLED BY APPLICANT PFLANAGAN
Note: TALK TO ONE OF CM THERE ARE THINGS NEED TO BE DONE BEFORE THE ROW FINAL AND AFTER POUR IS APPROVED
ROW - STORMWATER FINAL 06/13/2023 CANCELLED BY APPLICANT PFLANAGAN
Note: TALK TO ONE OF CM THERE ARE THINGS NEED TO BE DONE BEFORE THE ROW FINAL AND AFTER POUR IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/12/2023 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 06/12/2023 APPROVED PFLANAGAN
U-CROSS CONNECTION 06/08/2023 APPROVED - AS NOTED LFITZGERALD
Note: has reclaim irrigation-no cross connection
ELECTRIC - EARLY POWER 06/01/2023 APPROVED - AS NOTED BTAYLOR
Note: 5/26/2023 - PREVIOUS INSPECTION NOTES 5/23/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2200 Notification sent to FPL 5-23-23 1. Not ready. 6-1-23 1. Emailed FPL at 11:23.
ELECTRIC - EARLY POWER 05/26/2023 CANCELLED BY APPLICANT BTAYLOR
Note: 5/23/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2200 Notification sent to FPL 5-23-23 1. Not ready.
ELECTRIC - EARLY POWER 05/23/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: Inspector Notes from Inspection 2200 Notification sent to FPL 5-23-23 1. Not ready.
ROW- PRE-APRON (PRE-POUR) 05/17/2023 APPROVED RGROSS
Note: READY FOR PAVERS 5/12/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON, SIDEWALK AND PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT TIME OF THE INSPECTION.
ROW- PRE-APRON (PRE-POUR) 05/12/2023 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR APRON, SIDEWALK AND PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT TIME OF THE INSPECTION.
TIE BEAM / LINTEL 05/02/2023 APPROVED TSTAUFFACHER
GRAVITY SEWER TEST 02/01/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 02/01/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 01/26/2023 APPROVED TSTAUFFACHER
INSULATION 01/18/2023 APPROVED LMILLER
ALL ROUGH 01/11/2023 APPROVED BTAYLOR
TIE BEAM / LINTEL 01/10/2023 CANCELLED BY INSPECTOR LMILLER
Note: this was added by thd contractor to be able to call in the Tie Beam/Lintel for the pool when needed. It needs to be removed so the contractor can call in the All-Rough. Contractor must add the Tie Beam/Lintel when ready for pool Lintel wall.
WALL SHEATHING 08/31/2022 APPROVED RMARTIN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/27/2022 APPROVED DCUSHING
Note: THIS IS A REINSPECTION ADDED ON 7/15/2022 1:36:35 PM THIS IS A REINSPECTION ROOF SHEATHING ONLY 7/15/22 Roof sheathing passed
ROOF VALLEY & METAL 07/26/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/15/2022 PARTIALLY APPROVED KSANDOE
Note: THIS IS A REINSPECTION ROOF SHEATHING ONLY 7/15/22 Roof sheathing passed
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/08/2022 PARTIALLY APPROVED DCUSHING
Note: ROOF SHEATHING ONLY
FOUND SURVEY APPROVED (OFFICE) 07/07/2022 APPROVED TBAKER
ELECTRIC-TUG 06/29/2022 APPROVED - AS NOTED DCUSHING
Note: Notification sent to FPL
TIE BEAM / LINTEL 06/21/2022 APPROVED LMILLER
MONOLITHIC SLAB 05/24/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 05/20/2022 APPROVED MGIBSON
FOOTER 04/12/2022 APPROVED RMARTIN
WATER METER INSTALLATION REQUEST 03/08/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 04/12/2023 04/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 03/08/2023 03/08/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 03/06/2023 03/07/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition
ELEC COMPLETE 09/02/2022 09/06/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/07/2022 07/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/07/2022 07/07/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 07/06/2022 07/06/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NO FOUNDATION SURVEY ATTACHED.
BLD HOLD 07/05/2022 07/05/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM REVIEW COMMENTS: 1. Plans uploaded are for a different address. Please upload truss drawings for the correct address.
BLD COMPLETE 07/05/2022 07/05/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/21/2022 03/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 03/21/2022 03/28/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 03/21/2022 03/21/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 03/07/2022 03/07/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
ZON COMPLETE 03/07/2022 03/07/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
URB COMPLETE 03/01/2022 03/02/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD HOLD 02/28/2022 03/01/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM 1. Factory - built gas fireplace at family room shall be listed and labeled and shall be installed in accordance with the conditions of the listing and tested per UL 127 - FBCR 7th Ed. Sec. R1004. Indicate on plan the selected option either to be included on the permit or to be done later by ohers.
CUSVC COMPLETE 02/28/2022 03/04/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 02/28/2022 03/01/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/28/2022 03/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 02/28/2022 03/02/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 02/28/2022 03/01/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/28/2022 03/04/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON HOLD 02/28/2022 03/01/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad location should be shown on site plan/survey Banding must wrap around entire windows and doors facing right of way

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 06/15/2023
PLAN REVIEW - REVISION ¤32.50 05/25/2023
PLAN REVIEW - REVISION ¤32.50 05/25/2023
REINSPECTION RESIDENTIAL ¤40.00 05/25/2023
CONTRACTOR CHANGE ¤40.00 05/25/2023
CONTRACTOR CHANGE ¤20.00 05/25/2023
3% FIRE IMPACT FEE CREDIT (¤11.66) 03/07/2022
IMPACT FEE FIRE ¤388.65 03/07/2022
IMPACT FEE PARKS ¤1,455.13 03/07/2022
IMPACT FEE SCHOOL ¤3,600.00 03/07/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 03/07/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 03/07/2022
SURCHARGE FS 533.721 ¤13.43 03/07/2022
SURCHARGE - FS 468.631 ¤20.15 03/07/2022
SW ENG - FOUNDATION SURVEY ¤20.00 03/07/2022
SW ENG INSPECTION 80 ¤80.00 03/07/2022
SW ENG PRE APRON ¤30.00 03/07/2022
CONNECTION FEES ¤25.00 03/07/2022
METER - DEPOSIT ¤60.00 03/07/2022
WATER-METER ¤467.09 03/07/2022
WATER-METER ¤388.04 03/07/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/07/2022
INSPECTION - RESIDENTIAL ¤973.50 03/07/2022
PLAN REVIEW - RESIDENTIAL ¤276.12 03/07/2022
SW ENG - REVIEW 20 ¤20.00 03/07/2022
SW ENG RES REVIEW 200 ¤200.00 03/07/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 03/07/2022
SEWER INSPECTION ¤25.00 03/07/2022
SITE PLAN 30 ¤30.00 03/07/2022
Fees Total Due: ¤0.00 Total Paid: ¤11,359.08