I want to search for...

Permit #2022021504

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00100-0050
CONDITIONED SPACE: 2376 sqft
GARAGE: 776 sqft
OPENED PORCH (WITH ROOF) : 76 sqft
PATIO/DECK (NO ROOF) : 474 sqft
SCREEN PORCH (SOLID ROOF) : 162 sqft
Total Square Footage: 3864 sqft
Block: 00100
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 407-808-8155
Location Address: 97 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/27/2022
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0050
Contracted Stated Job Value: ¤300,000.00
Job Description: single family residence
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
NICHOLAS KEITH REX
Status Location Address State License Number Phone
ACTIVE

1408 HAMLIN UNIT B

SAINT CLOUD, FL 34771

EC13006779 (Exp: 08/31/2026) 407-873-2231

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/15/2023 FINAL APPROVED BTAYLOR
U -UTILITY RESIDENTIAL FINAL 06/13/2023 FINAL APPROVED LFITZGERALD
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/12/2023 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 06/12/2023 APPROVED PFLANAGAN
ROW - STORMWATER FINAL 06/12/2023 FINAL APPROVED PFLANAGAN
Note: LOOKS GOOD AT THE TIME OF INSPECTION
ROW - FINAL APRON (AFTER POUR) 06/12/2023 APPROVED PFLANAGAN
U-CROSS CONNECTION 06/08/2023 APPROVED - AS NOTED LFITZGERALD
Note: has reclaim irrigation-no cross connection
ELECTRIC - EARLY POWER 06/01/2023 APPROVED - AS NOTED BTAYLOR
Note: 5/26/2023 - PREVIOUS INSPECTION NOTES 6-1-23 1. Emailed FPL at 11:22.
ELECTRIC - EARLY POWER 05/26/2023 CANCELLED BY APPLICANT BTAYLOR
ROW- PRE-APRON (PRE-POUR) 05/17/2023 APPROVED RGROSS
Note: READY FOR PAVERS 5/15/2023 - PREVIOUS INSPECTION NOTES 5/15/23= READY TO POUR NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/12/2023 - PREVIOUS INSPECTION NOTES THERE ARE AREAS IN THE APRON AND SIDEWALK THAT DONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE
ROW- PAVER RESTRAINTS 05/15/2023 APPROVED GBERTOLA
Note: READY TO POUR
ROW- PRE-APRON (PRE-POUR) 05/15/2023 PARTIALLY APPROVED GBERTOLA
Note: 5/15/23= READY TO POUR NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/12/2023 - PREVIOUS INSPECTION NOTES THERE ARE AREAS IN THE APRON AND SIDEWALK THAT DONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE
ROW- PRE-APRON (PRE-POUR) 05/12/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: THERE ARE AREAS IN THE APRON AND SIDEWALK THAT DONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE
WATER METER INSTALLATION REQUEST 05/12/2023 APPROVED CSTONE
TIE BEAM / LINTEL 05/05/2023 APPROVED RSIMS
LATH/BRICK/ WATER BARRIER 02/23/2023 APPROVED BTAYLOR
GRAVITY SEWER TEST 02/09/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 02/09/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 01/27/2023 APPROVED TSTAUFFACHER
ALL ROUGH 01/23/2023 APPROVED TSTAUFFACHER
ELECTRIC-TUG 10/13/2022 APPROVED JMUNSON
WALL SHEATHING 08/31/2022 APPROVED RMARTIN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/23/2022 APPROVED DCUSHING
Note: THIS IS A REINSPECTION Roof sheathing passed. Not ready for inspection. Stopped inspection
ROOF VALLEY & METAL 08/23/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/09/2022 PARTIALLY APPROVED KSANDOE
Note: Roof sheathing passed. Not ready for inspection. Stopped inspection
TIE BEAM / LINTEL 07/12/2022 APPROVED DCUSHING
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 07/11/2022 CANCELLED BY APPLICANT KSANDOE
FOUND SURVEY APPROVED (OFFICE) 07/07/2022 APPROVED TBAKER
MONOLITHIC SLAB 06/16/2022 APPROVED - AS NOTED AGAETANO
Note: Down cell missing on right side of building. Noted on drawings. Superintendent on site and will install cell.
PLUMBING 1ST ROUGH UNDERGROUND 06/15/2022 APPROVED MGIBSON
FOOTER 05/24/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION R318.6.2 The foundation and the area encompassed within 1 foot (305mm) therein shall have all vegetation, stumps, dead roots, and foreign material removed and the fill material shall be free of vegetation and foreign material. The fill shall be compacted to assure adequate support of the foundation. Clearance on rebar from earth 3” FBC R404.1.3.3.7.4 Clear all roots, trash, and debris from footer area. Ensure all rebar is supported and clearances are 3" min throughout
FOOTER 05/20/2022 Disapproved - NO FEE KSANDOE
Note: R318.6.2 The foundation and the area encompassed within 1 foot (305mm) therein shall have all vegetation, stumps, dead roots, and foreign material removed and the fill material shall be free of vegetation and foreign material. The fill shall be compacted to assure adequate support of the foundation. Clearance on rebar from earth 3” FBC R404.1.3.3.7.4 Clear all roots, trash, and debris from footer area. Ensure all rebar is supported and clearances are 3" min throughout

Review History

Department Status Date In Date Out
MECH COMPLETE 04/12/2023 04/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 09/02/2022 09/06/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/29/2022 08/01/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/07/2022 07/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/07/2022 07/07/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 07/06/2022 07/06/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NO FOUNDATION SURVEY ATTACHED
BLD COMPLETE 07/05/2022 07/05/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 04/20/2022 04/20/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 04/20/2022 04/21/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/20/2022 04/20/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 04/20/2022 04/27/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
URB COMPLETE 03/01/2022 03/02/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD HOLD 02/28/2022 03/01/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM 1. Factory - built gas fireplace at family room shall be listed and labeled and shall be installed in accordance with the conditions of the listing and tested per UL 127 - FBCR 7th Ed. Sec. R1004.
CUSVC COMPLETE 02/28/2022 03/07/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 02/28/2022 03/01/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/28/2022 03/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 02/28/2022 03/02/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 02/28/2022 03/01/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/28/2022 03/04/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
ZON HOLD 02/28/2022 03/01/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM A/C pad and concrete pads shown on landscape plan is missing on proposed site plan. Site plan and landscape plan must match.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 05/25/2023
PLAN REVIEW - REVISION ¤32.50 05/25/2023
PLAN REVIEW - REVISION ¤32.50 05/25/2023
CONTRACTOR CHANGE ¤20.00 05/25/2023
CONTRACTOR CHANGE ¤40.00 05/25/2023
SW ENG REINSPECTION 30 ¤30.00 05/25/2023
SW ENG - REVIEW 20 ¤20.00 04/27/2022
SW ENG RES REVIEW 200 ¤200.00 04/27/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 04/27/2022
SEWER INSPECTION ¤25.00 04/27/2022
SITE PLAN 30 ¤30.00 04/27/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 04/27/2022
IMPACT FEE FIRE ¤388.65 04/27/2022
IMPACT FEE PARKS ¤1,455.13 04/27/2022
IMPACT FEE SCHOOL ¤3,600.00 04/27/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 04/27/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 04/27/2022
SURCHARGE FS 533.721 ¤12.38 04/27/2022
SURCHARGE - FS 468.631 ¤18.57 04/27/2022
SW ENG - FOUNDATION SURVEY ¤20.00 04/27/2022
SW ENG INSPECTION 80 ¤80.00 04/27/2022
SW ENG PRE APRON ¤30.00 04/27/2022
CONNECTION FEES ¤25.00 04/27/2022
WATER-METER ¤467.09 04/27/2022
WATER-METER ¤388.04 04/27/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/27/2022
INSPECTION - RESIDENTIAL ¤893.75 04/27/2022
PLAN REVIEW - RESIDENTIAL ¤253.50 04/27/2022
Fees Total Due: ¤0.00 Total Paid: ¤11,196.58