Permit #2022030116
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00790-0020 |
| CONDITIONED SPACE: 3196 sqft |
| GARAGE: 908 sqft |
| OPENED PORCH (WITH ROOF) : 90 sqft |
| OPENED PORCH (WITH ROOF) : 326 sqft |
| Total Square Footage: 4520 sqft |
| Block: 00790 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-931-5935 |
| Location Address: 20 ETON LN |
| Type: DU - DUPLEX |
| Issue Date: 03/25/2022 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: JEFFREY GRUBBA LIVING TRUST |
|
Address 20 COLLINGWOOD LANE PALM COAST, FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
DILLON CARRERAS
| Status | Location Address | State License Number |
| ACTIVE |
3504 LUNDY ROAD PALATKA, FL 32177 |
EC13010133 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/24/2023 | FINAL APPROVED | RMARTIN |
| Note: 4/13/2023 - PREVIOUS INSPECTION NOTES Dishwasher has not power Disposal has no power Opening access for air handler too small. M1305 | |||
| ROW - FINAL INSPECTION | 04/13/2023 | APPROVED | GBERTOLA |
| Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/10/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT 2) NEED TO HAVE SEED AND STRAW ON BARE AREAS IN THE VACANT LOT TO THE RIGHT 3) NEED TO HAVE SOD IN THE SWALE IN THE VACANT WHERE THE DUMPSTER WAS | |||
| BLD - BUILDING FINAL | 04/13/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Dishwasher has not power Disposal has no power Opening access for air handler too small. M1305 | |||
| BLD - BUILDING FINAL | 04/12/2023 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 04/10/2023 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 04/10/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT 2) NEED TO HAVE SEED AND STRAW ON BARE AREAS IN THE VACANT LOT TO THE RIGHT 3) NEED TO HAVE SOD IN THE SWALE IN THE VACANT WHERE THE DUMPSTER WAS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/05/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/05/2023 | APPROVED | PFLANAGAN |
| ROW - FINAL APRON (AFTER POUR) | 04/05/2023 | APPROVED | PFLANAGAN |
| U-CROSS CONNECTION | 03/28/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ELECTRIC - EARLY POWER | 03/28/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-28-23 1. Emailed FPL at 10:22. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/23/2023 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR THE DRIVEWAY. ---------------------------------------------------------------------------------------------------- 1/20/2023 - PREVIOUS INSPECTION NOTES THE RIGHT DRIVEWAY IF YOU ARE FACING THE HOUSE FROM THE ROAD NEED TO HAVE THE SOIL AROUND CULVERT PIPE COMPACTED MORE. NEED TO HAVE A MINIMUM OF 95% COMPACTION AT THE TIME OF THE INSPECTION. ALSO THERE ARE AREAS IN THE DRIVEWAY THAT WON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED A MINIMUM OF 6' IN THE RIGHT OF WAY AND 4" ABOVE THE RIGHT OF WAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/20/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE RIGHT DRIVEWAY IF YOU ARE FACING THE HOUSE FROM THE ROAD NEED TO HAVE THE SOIL AROUND CULVERT PIPE COMPACTED MORE. NEED TO HAVE A MINIMUM OF 95% COMPACTION AT THE TIME OF THE INSPECTION. ALSO THERE ARE AREAS IN THE DRIVEWAY THAT WON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED A MINIMUM OF 6' IN THE RIGHT OF WAY AND 4" ABOVE THE RIGHT OF WAY. | |||
| U - SEWER TIE IN | 01/05/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/05/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 11/21/2022 | APPROVED | CSTONE |
| FIREWALL FINAL | 11/08/2022 | APPROVED | BTAYLOR |
| Note: 10/18/2022 - PREVIOUS INSPECTION NOTES Firewall final cannot pass prior to approved firewall nailing inspection. 10/13/2022 - PREVIOUS INSPECTION NOTES 9/26/2022 - PREVIOUS INSPECTION NOTES Firewall final cannot pass prior to firewall drywall nailing inspection. 10/13/22 Firewall final cannot pass prior to firewall drywall nailing inspection. | |||
| INSULATION | 11/02/2022 | APPROVED | RMARTIN |
| Note: Inspector Notes from Inspection 2420 11/2/22 CHECK MAIN BREAKERS AT EARLY POWER, CHANGING OUT TO 150A | |||
| ALL ROUGH | 11/02/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: 11/2/22 CHECK MAIN BREAKERS AT EARLY POWER, CHANGING OUT TO 150A | |||
| LATH/BRICK/ WATER BARRIER | 10/28/2022 | APPROVED | JWALKER |
| ALL ROUGH | 10/28/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 10/26/2022 - PREVIOUS INSPECTION NOTES 1. Service entrance cable conduit is shc 40 needs to be sch 80 or other appoved conduit. NEC 230.50 2. Fitting into the exterior electrical panels / meter boxes need to be sealed to prevent water intrusion. 3. Service entrance are up against the roof decking where they enter the building. Install nail plates or lower and secure off the decking. 5. Wires not phased out in panel. 6., Nail plates missing in multiple areas. Check ALL areas. 8. Bath exhaust fans not wired. 9. Dryer duct fitting are to be sealed completely. 10/28/22 The items listed above are from the 1st all rough inspection that have not been corrected. 10. Plenum return boxes both units need to be sealed at corners and edges. | |||
| ALL ROUGH | 10/26/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Service entrance cable conduit is shc 40 needs to be sch 80 or other appoved conduit. NEC 230.50 2. Fitting into the exterior panels need to be sealed to prevent water intrusion. 3. Service entrance are up against the roof decking where the enter the building. Install nail plates of lower and secure off the decking. 4. Ground wire not connected at electical panel. 5. Wires not phased out in panel. 6., Nail plates missing in multiple areas. Check ALL areas. 7. Concrete floor cut outs for plumbing lines not sealed. 8. Bath exhaust fans not wired. 9. Dryer duct fitting are to be sealed completely. INSPECTION STOPPED A FULL INSPECTION OF BOTH UNITS WILL NEED TO BE DONE AT REINSPECTION> INSULATION HAS BEEN INSTALLED PRIOR TO ALL ROUGH COMPLETION PLEASE HAVE ALL WIRING AND PLUMBING EXPOSED. | |||
| FIREWALL DRYWALL NAILING | 10/21/2022 | APPROVED | RSIMS |
| Note: 10/20/2022 - PREVIOUS INSPECTION NOTES 10/20/2022: Cancelled by applicant via phone call at @ 10:36. Not Ready for re-inspectiopn. 10/18/2022 - PREVIOUS INSPECTION NOTES 10/18/2022: PARTY/FIRE WALL NOT BUILT PER SPECIFCATIONS ON PLANS. Below items are highlighted on single page detail provided in packet. 1). drywall above CMU on right side not tight to truss as required 2). Zip tape used at top of CMU wall does not appear to be fire-rated and is not listed on the Florida Product Approval page. Please provide fire-rated documentation for the same or seal with fire caulk as required. 3).Party wall requires a minimum of 1 hour fire resistance. 4). Left side has broken/damaged truss webs. Please provide approved, engineered repair and make repairs before calling fo a re-inspection. 10/13/2022 - PREVIOUS INSPECTION NOTES 10/5/2022 - PREVIOUS INSPECTION NOTES 10/05/2022 - Firewall is spray foamed above cinderblock wall preventing verification of firewall specifications per plan detail. 10/13/22 Foam used on firewall must be removed. Firewall to be contructed per approved plans. | |||
| FIREWALL DRYWALL NAILING | 10/20/2022 | CANCELLED BY APPLICANT | RSIMS |
| Note: 10/20/2022: Cancelled by applicant via phone call at @ 10:36. Not Ready for re-inspectiopn. 10/18/2022 - PREVIOUS INSPECTION NOTES 10/18/2022: PARTY/FIRE WALL NOT BUILT PER SPECIFCATIONS ON PLANS. Below items are highlighted on single page detail provided in packet. 1). drywall above CMU on right side not tight to truss as required 2). Zip tape used at top of CMU wall does not appear to be fire-rated and is not listed on the Florida Product Approval page. Please provide fire-rated documentation for the same or seal with fire caulk as required. 3).Party wall requires a minimum of 1 hour fire resistance. 4). Left side has broken/damaged truss webs. Please provide approved, engineered repair and make repairs before calling fo a re-inspection. 10/13/2022 - PREVIOUS INSPECTION NOTES 10/5/2022 - PREVIOUS INSPECTION NOTES 10/05/2022 - Firewall is spray foamed above cinderblock wall preventing verification of firewall specifications per plan detail. 10/13/22 Foam used on firewall must be removed. Firewall to be contructed per approved plans. | |||
| FIREWALL DRYWALL NAILING | 10/18/2022 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 10/18/2022: PARTY/FIRE WALL NOT BUILT PER SPECIFCATIONS ON PLANS. Below items are highlighted on single page detail provided in packet. 1). drywall above CMU on right side not tight to truss as required 2). Zip tape used at top of CMU wall does not appear to be fire-rated and is not listed on the Florida Product Approval page. Please provide fire-rated documentation for the same or seal with fire caulk as required. 3).Party wall requires a minimum of 1 hour fire resistance. 4). Left side has broken/damaged truss webs. Please provide approved, engineered repair and make repairs before calling fo a re-inspection. 10/13/2022 - PREVIOUS INSPECTION NOTES 10/5/2022 - PREVIOUS INSPECTION NOTES 10/05/2022 - Firewall is spray foamed above cinderblock wall preventing verification of firewall specifications per plan detail. 10/13/22 Foam used on firewall must be removed. Firewall to be contructed per approved plans. | |||
| FIREWALL FINAL | 10/18/2022 | Disapproved -FEE REQUIRED | RSIMS |
| Note: Firewall final cannot pass prior to approved firewall nailing inspection. 10/13/2022 - PREVIOUS INSPECTION NOTES 9/26/2022 - PREVIOUS INSPECTION NOTES Firewall final cannot pass prior to firewall drywall nailing inspection. 10/13/22 Firewall final cannot pass prior to firewall drywall nailing inspection. | |||
| FIREWALL FINAL | 10/13/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: 9/26/2022 - PREVIOUS INSPECTION NOTES Firewall final cannot pass prior to firewall drywall nailing inspection. 10/13/22 Firewall final cannot pass prior to firewall drywall nailing inspection. | |||
| FIREWALL DRYWALL NAILING | 10/13/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: 10/5/2022 - PREVIOUS INSPECTION NOTES 10/05/2022 - Firewall is spray foamed above cinderblock wall preventing verification of firewall specifications per plan detail. 10/13/22 Foam used on firewall must be removed. Firewall to be contructed per approved plans. | |||
| FIREWALL DRYWALL NAILING | 10/05/2022 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 10/05/2022 - Firewall is spray foamed above cinderblock wall preventing verification of firewall specifications per plan detail. | |||
| FIREWALL FINAL | 09/26/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Firewall final cannot pass prior to firewall drywall nailing inspection. | |||
| LATH/BRICK/ WATER BARRIER | 09/02/2022 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/25/2022 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION Walked roof checked nailing at wall sheating inspection. Front, right side and rear roof passed nailing. Left side was covered with underlayment need to bump check 8/23/22 Framers on site working. Not ready for inspection. | |||
| ROOF VALLEY & METAL | 08/25/2022 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/23/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Walked roof checked nailing at wall sheating inspection. Front, right side and rear roof passed nailing. Left side was covered with underlayment need to bump check 8/23/22 Framers on site working. Not ready for inspection. | |||
| WALL SHEATHING | 08/22/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/22/2022 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 07/28/2022 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 07/18/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/08/2022 | APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION 7/7/22 Multiple areas of the footing still have soil collapsed into the footing. Rear right. center footing, Garage areas, check all Rebar is to have 3" ground clearance. R403 | |||
| MONOLITHIC SLAB | 07/07/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 7/7/22 Multiple areas of the footing still have soil collapsed into the footing. Rear right. center footing, Garage areas, check all Rebar is to have 3" ground clearance. R403 | |||
| MONOLITHIC SLAB | 06/16/2022 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: THIS IS A REINSPECTION 1. footings are caved in at several areas (too many to list, check all) some to the point the footing width is compromised. 2. Missing UFER ground .NEC..250.52(3) 6/16/22 - Footings are caved in in sseveral areas. Roots protruding through moisture barrier on rear patio. Footing depth and width need to be checked against plans | |||
| MONOLITHIC SLAB | 06/15/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. footings are caved in at several areas (too many to list, check all) some to the point the footing width is compromised. 2. Missing UFER ground .NEC..250.52(3) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/09/2022 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION NO TEST ON WATER DISTRIBUTION LINES AND 5' HEADTEST IS EMPTY | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/09/2022 | APPROVED | MGIBSON |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION NO TEST ON WATER DISTRIBUTION LINES AND 5' HEADTEST IS EMPTY | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/01/2022 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NO TEST ON WATER DISTRIBUTION LINES AND 5' HEADTEST IS EMPTY | |||
| WATER METER INSTALLATION REQUEST | 05/19/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/11/2023 | 04/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 04/06/2023 | 04/06/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM when naming your files please do not add the address or any other name in front of the document name - example - blower door A -not 20 eton lane a blower door | |||
| BADMIN | INFORMATION | 02/03/2023 | 02/03/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Unable to process final survey because subcontractor inactive. | |||
| BLD | COMPLETE | 10/19/2022 | 10/19/2022 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/12/2022 | 09/12/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/18/2022 | 07/18/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/18/2022 | 07/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/23/2022 | 03/23/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM in revised siteplan they changed the pavered driveway to concrete | |||
| ELEC | COMPLETE | 03/16/2022 | 03/16/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/16/2022 | 03/16/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Please provide a Right of way utilization agreement for the paved drive way. The agreement must be signed by all owners on property deed, and notarized. | |||
| SW1 | COMPLETE | 03/16/2022 | 03/23/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/02/2022 | 03/03/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/02/2022 | 03/10/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 03/02/2022 | 03/03/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs | |||
| ENGIN1 | COMPLETE | 03/02/2022 | 03/02/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/02/2022 | 03/03/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/02/2022 | 03/03/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/02/2022 | 03/08/2022 |
| Note: Held By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM Proposed elevations are to be clearly noted and discernible from the existing survey data. (A) The proposed elevations shall be shown at all locations of existing elevations per the topographic survey. (A) A.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(5) | |||
| ZON | HOLD | 03/02/2022 | 03/07/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Pavers Please provide a Right of way utilization agreement for the paved drive way. The agreement must be signed by all owners on property deed, and notarized. Site Plan: Please add the width of the walkway from drive way to entry. Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 6 trees | |||
| SWALE | COMPLETE | 03/02/2022 | 05/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/24/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/24/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/24/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/25/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/25/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 03/25/2022 |
| SEWER CREDIT | (¤1,700.00) | 03/25/2022 |
| SEWER INSPECTION | ¤25.00 | 03/25/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 03/25/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 03/25/2022 |
| SITE PLAN 30 | ¤30.00 | 03/25/2022 |
| METER - DEPOSIT | ¤120.00 | 03/25/2022 |
| WATER- TURN ON | ¤50.00 | 03/25/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/25/2022 |
| INSPECTION - RESIDENTIAL | ¤1,124.75 | 03/25/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤319.02 | 03/25/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 03/25/2022 |
| IMPACT FEE FIRE | ¤777.30 | 03/25/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 03/25/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 03/25/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 03/25/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 03/25/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 03/25/2022 |
| SURCHARGE FS 533.721 | ¤15.42 | 03/25/2022 |
| SURCHARGE - FS 468.631 | ¤23.14 | 03/25/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/25/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/25/2022 |
| SW ENG PRE APRON | ¤30.00 | 03/25/2022 |
| CONNECTION FEES | ¤2,155.76 | 03/25/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤33,620.90 |