Permit #2022030409
Permit Details
Status: COED
| Parcel Id: 05-11-31-5918-00000-0680 |
| CONDITIONED SPACE: 2167 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 299 sqft |
| OPENED PORCH (WITH ROOF) : 43 sqft |
| Total Square Footage: 3025 sqft |
| Block: 00000 |
| Subdivision: 2244 - VILLAGE AT PALM COAST PH 1 |
| Job Phone: 386-313-6221 |
| Location Address: 33 LONGVIEW WAY N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/17/2022 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: TEDESCHI BARBARA & WILLIAM R ABERLY & THOMASINE M |
|
Address 1014 SEASHELL COURT DAYTONA BEACH, FL 32124 |
| Lot: 0680 |
| Contracted Stated Job Value: ¤411,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
PATRICK FRANCIS MCADAMS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1201 South Flagler Ave Flagler Beach, FL 32136 |
CFC057805 (Exp: 08/31/2026) | 386-283-9236 | 321-248-0447 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
PEDRO DANIEL CHINCHILLA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
324 COVENT GARDENS PL DELTONA, FL 32725 |
CCC1333997 (Exp: 08/31/2026) | 386-679-6228 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/16/2023 | FINAL APPROVED | BTAYLOR |
| Note: 8/9/2023 - PREVIOUS INSPECTION NOTES 08-09-2023 1. Multiple lights and outlets have been added. Please revise and submit to the building department. 2. Outdoor kitchen water lines and drai line added. Please revise and submit to the building department. 3. Test caps not as per code on outdoor kitchen. 4. AHU not sealed on unit and ceiling properly. Fire foam needed at ceiling. 5. Termite bond not posted. Inspection stopped. | |||
| U-CROSS CONNECTION | 08/09/2023 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 08/09/2023 | APPROVED | DHANEY |
| BLD - BUILDING FINAL | 08/09/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 08-09-2023 1. Multiple lights and outlets have been added. Please revise and submit to the building department. 2. Outdoor kitchen water lines and drain line added as well as outlets. Please revise and submit to the building department. 3. Test caps not as per code on outdoor kitchen. 4. AHU not sealed on unit and ceiling properly. Fire foam needed at ceiling. 5. Termite bond not posted. 6. Please have revised, approved drawings on site for inspection. Inspection stopped. | |||
| U -UTILITY RESIDENTIAL FINAL | 08/09/2023 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 08/08/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/08/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/08/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 08/08/2023 | FINAL APPROVED | EMADISON |
| ELECTRIC - EARLY POWER | 03/31/2023 | APPROVED | AGAETANO |
| Note: FPL notified at 12:51 | |||
| ROW- PRE-APRON (PRE-POUR) | 02/14/2023 | APPROVED | GBERTOLA |
| Note: 2/14/23=READY FOR PAVERS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 2/13/2023 - PREVIOUS INSPECTION NOTES THIS IS NOT READY FOR THIS INSPECTION AT THIS TIME AT 8:33AM. PAVERS BASE IS NOT SPREAD OR COMPACTED SEE PHOTO ON PERMIT DATED 2/13/2023 FOR INSPECTION RESULTS. -------------------------------------------------------------------------------------------------- 12/14/2022 - PREVIOUS INSPECTION NOTES ** 12/14/22 APRON READY TO POUR WITH PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 02/13/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THIS IS NOT READY FOR THIS INSPECTION AT THIS TIME AT 8:33AM. PAVERS BASE IS NOT SPREAD OR COMPACTED SEE PHOTO ON PERMIT DATED 2/13/2023 FOR INSPECTION RESULTS. -------------------------------------------------------------------------------------------------- 12/14/2022 - PREVIOUS INSPECTION NOTES ** 12/14/22 APRON READY TO POUR WITH PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| INSULATION | 12/19/2022 | APPROVED | AGAETANO |
| Note: 12/16/2022 - PREVIOUS INSPECTION NOTES 12/8/2022 - PREVIOUS INSPECTION NOTES 12/6/2022 - PREVIOUS INSPECTION NOTES 12-06-2022 SGD's and front window not installed and need to be covered for insulation inspection. 12-08-2022 SGD needs to be installed or covered. Track is installed. Window nailing has been added and approvred. Contractor will request another insulation inspection after the SGD windows are installed. 12-16-2022 Insulation depth tags not visible. | |||
| INSULATION | 12/16/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 12/8/2022 - PREVIOUS INSPECTION NOTES 12/6/2022 - PREVIOUS INSPECTION NOTES 12-06-2022 SGD's and front window not installed and need to be covered for insulation inspection. 12-08-2022 SGD needs to be installed or covered. Track is installed. Window nailing has been added and approvred. Contractor will request another insulation inspection after the SGD windows are installed. 12-16-2022 Insulation depth tags not visible. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/14/2022 | PARTIALLY APPROVED | EMADISON |
| Note: ** 12/14/22 APRON READY TO POUR WITH PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ROW- PAVER RESTRAINTS | 12/14/2022 | APPROVED | EMADISON |
| Note: ** 12/14/22 PAVER RESTRAINTS ARE READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| INSULATION | 12/08/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 12/6/2022 - PREVIOUS INSPECTION NOTES 12-06-2022 SGD's and front window not installed and need to be covered for insulation inspection. 12-08-2022 SGD needs to be installed or covered. Track is installed. Window nailing has been added and approvred. Contractor will request another insulation inspection after the SGD windows are installed. | |||
| LATH/BRICK/ WATER BARRIER | 12/08/2022 | APPROVED | AGAETANO |
| Note: 11/29/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 11/14/2022 - PREVIOUS INSPECTION NOTES 11-14-2022 1. Conductors not phased out in electrical panel. 2. Master bath plumbing drain at slab not protected. Shield plates needed. 3. 5' head pressure test failed P2503.5.1 4. SGD need to be installed prior to insulation. 5. Front entry and right small window not installed. Back door not installed. Add window nailing. 11-16-2022 1. Front small window and entry transom not installed. 2. SGD's glass not installed. Window nailing will be added. All door openings must be covered prior to insulation. 3. Master bath drain pipe not protected. 11-29-2022 Front window and back SGD back ordered. | |||
| WINDOW NAILING | 12/08/2022 | APPROVED | AGAETANO |
| Note: 12-08-2022 SGD at lanai track approved. | |||
| INSULATION | 12/06/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 12-06-2022 SGD's and front window not installed and need to be covered for insulation inspection. | |||
| LATH/BRICK/ WATER BARRIER | 11/29/2022 | PARTIALLY APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 11/14/2022 - PREVIOUS INSPECTION NOTES 11-14-2022 1. Conductors not phased out in electrical panel. 2. Master bath plumbing drain at slab not protected. Shield plates needed. 3. 5' head pressure test failed P2503.5.1 4. SGD need to be installed prior to insulation. 5. Front entry and right small window not installed. Back door not installed. Add window nailing. 11-16-2022 1. Front small window and entry transom not installed. 2. SGD's glass not installed. Window nailing will be added. All door openings must be covered prior to insulation. 3. Master bath drain pipe not protected. 11-29-2022 Front window and back SGD back ordered. | |||
| ALL ROUGH | 11/16/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 11/14/2022 - PREVIOUS INSPECTION NOTES 11-14-2022 1. Conductors not phased out in electrical panel. 2. Master bath plumbing drain at slab not protected. Shield plates needed. 3. 5' head pressure test failed P2503.5.1 4. SGD need to be installed prior to insulation. 5. Front entry and right small window not installed. Back door not installed. Add window nailing. 11-16-2022 1. Front small window and entry transom not installed. 2. SGD's glass not installed. Window nailing will be added. All door openings must be covered prior to insulation. 3. Master bath drain pipe not protected. | |||
| ALL ROUGH | 11/14/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 11-14-2022 1. Conductors not phased out in electrical panel. 2. Master bath plumbing drain at slab not protected. Shield plates needed. 3. 5' head pressure test failed P2503.5.1 4. SGD need to be installed prior to insulation. 5. Front entry and right small window not installed. Back door not installed. Add window nailing. | |||
| ELECTRIC-TUG | 09/15/2022 | APPROVED | RMARTIN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/15/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Inspector Notes from Inspection 2300 this inspection is looked at on roof sheathing/ties/downcells 09-13-2022 Piggy back trusses not installed as per plans. 09-09-2022 Piggyback trusses not installed as per manufacturer's specs. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/13/2022 | Disapproved - NO FEE | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Inspector Notes from Inspection 2300 this inspection is looked at on roof sheathing/ties/downcells 09-13-2022 Piggy back trusses not installed as per plans. 09-09-2022 Piggyback trusses not installed as per manufacturer's specs. | |||
| ROOF VALLEY & METAL | 09/13/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/12/2022 | CANCELLED BY APPLICANT | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Inspector Notes from Inspection 2300 this inspection is looked at on roof sheathing/ties/downcells 09-09-2022 Piggyback trusses not installed as per manufacturer's specs. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/09/2022 | Disapproved - NO FEE | AGAETANO |
| Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2300 this inspection is looked at on roof sheathing/ties/downcells 09-09-2022 Piggyback trusses not installed as per manufacturer's specs. | |||
| GRAVITY SEWER TEST | 08/22/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 08/22/2022 | APPROVED | MGIBSON |
| WALL SHEATHING | 07/20/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Inspector Notes from Inspection 2300 this inspection is looked at on roof sheathing/ties/downcells | |||
| ROOF SHEATHING | 07/20/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/18/2022 | CANCELLED BY APPLICANT | AGAETANO |
| Note: Inspector Notes from Inspection 2300 this inspection is looked at on roof sheathing/ties/downcells | |||
| WALL SHEATHING | 07/18/2022 | CANCELLED BY APPLICANT | AGAETANO |
| Note: Inspector Notes from Inspection 2300 this inspection is looked at on roof sheathing/ties/downcells | |||
| DOWN CELL | 06/30/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: this inspection is looked at on roof sheathing/ties/downcells | |||
| TIE BEAM / LINTEL | 06/23/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Back left entry door lintel is cracked. Please replace or provide an engineer letter to the building department stating cracked lintel is approved. | |||
| TIE BEAM / LINTEL | 06/21/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Back left entry door lintel is cracked. Please replace or provide an engineer letter to the building department stating cracked lintel is approved. | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/09/2022 | APPROVED | TBAKER |
| WATER METER INSTALLATION REQUEST | 06/03/2022 | APPROVED | CSTONE |
| MONOLITHIC SLAB | 05/24/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. Back lanai footing not installed as per drawings. Not 12". 2. Center of foundation slab not minumum of 3", only 2 3/4". Foreman on site. | |||
| MONOLITHIC SLAB | 05/23/2022 | CANCELLED BY APPLICANT | AGAETANO |
| Note: THIS IS A REINSPECTION 1. Back lanai footing not installed as per drawings. Not 12". 2. Center of foundation slab not minumum of 3", only 2 3/4". Foreman on site. | |||
| MONOLITHIC SLAB | 05/20/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 1. Back lanai footing not installed as per drawings. Not 12". 2. Center of foundation slab not minumum of 3", only 2 3/4". Foreman on site. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/19/2022 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 08/10/2023 | 08/15/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/21/2022 | 11/21/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/21/2022 | 11/28/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Revise electrical load calculations for the proposed 50 AMP service added to the rear of the building. | |||
| BLD | INFORMATION | 09/09/2022 | 09/09/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/27/2022 | 06/27/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO PROD APP | |||
| ENGIN1 | COMPLETE | 06/09/2022 | 06/09/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/09/2022 | 06/09/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/11/2022 | 05/18/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/11/2022 | 05/12/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/30/2022 | 03/31/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/16/2022 | 03/16/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 03/09/2022 | 03/10/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | COMPLETE | 03/08/2022 | 03/08/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/08/2022 | 03/15/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | HOLD | 03/08/2022 | 03/08/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct outlet spacing in bedroom 2,3, dinning and great room. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 03/08/2022 | 03/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/08/2022 | 03/09/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/08/2022 | 03/08/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/08/2022 | 03/14/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/08/2022 | 03/09/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 08/16/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/16/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/17/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/17/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 03/17/2022 |
| SEWER INSPECTION | ¤25.00 | 03/17/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 03/17/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 03/17/2022 |
| SITE PLAN 30 | ¤30.00 | 03/17/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 03/17/2022 |
| IMPACT FEE FIRE | ¤388.65 | 03/17/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 03/17/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/17/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 03/17/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 03/17/2022 |
| SURCHARGE FS 533.721 | ¤15.50 | 03/17/2022 |
| SURCHARGE - FS 468.631 | ¤23.24 | 03/17/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/17/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/17/2022 |
| SW ENG PRE APRON | ¤30.00 | 03/17/2022 |
| METER - DEPOSIT | ¤60.00 | 03/17/2022 |
| WATER-METER | ¤467.09 | 03/17/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/17/2022 |
| INSPECTION - RESIDENTIAL | ¤1,130.25 | 03/17/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤320.58 | 03/17/2022 |
| CONNECTION FEES | ¤25.00 | 03/17/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,608.67 |