Permit #2022030494
Permit Details
Status: FINAL
| Parcel Id: 05-12-31-0650-000A0-0016 |
| Block: 000A0 |
| Subdivision: - |
| Job Phone: 386-322-8700 |
| Location Address: 5000 LAKE AVE |
| Type: SDD - SUBDIVISION SITE DEVELOPMENT |
| Issue Date: 04/21/2022 |
| NOC: Unknown |
| Applicant name: CHAD HAZEN |
| Owner: PAYZEN PC LLC |
|
Address SUITE 1 PORT ORANGE, FL 32127 |
|
Address 794 SANDRES ROAD PORT ORANGE, FL 32127 |
| Lot: 0016 |
| Job Description: SITE WORK - TOWN CENTER TRACT 19 STAGE 2- SFR LOTS |
| Type: CN |
Contractor
HAZEN CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1599 TIONIA RD NEW SMYRNA BEACH, FL 32168 |
CGC061991 (Exp: 08/31/2026) | 386-322-8700 |
Inspection History
| Type | Request Date | Result | Inspector |
| MAINT BOND ACCEPTANCE (OFFICE) | 02/07/2025 | APPROVED | DRAMIREZ |
| CLOSE OUT DOCUMENTS | 02/05/2025 | APPROVED | DRAMIREZ |
| UC - PROJECT STATUS | 01/22/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: all hydrants now painted city colors/flow reports recieved 1/16/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 1/16/2025 3:17:25 PM *** HYDRANT STUFF-flow test performed-Kyle(Hazen)/Blue rpm's now installed-waiting on paint | |||
| UC-FINAL SITE INSPECTION | 01/22/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9101 all hydrants now painted city colors/flow reports recieved 1/16/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 1/16/2025 3:17:25 PM *** HYDRANT STUFF-flow test performed-Kyle(Hazen)/Blue rpm's now installed-waiting on paint 1/15/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 1/15/2025 10:47:04 AM *** some field items still remain to be completed | |||
| U - UTILITY COMMERCIAL FINAL | 01/17/2025 | FINAL APPROVED | LFITZGERALD |
| UROW - FINAL DRAINAGE | 01/17/2025 | APPROVED | LFITZGERALD |
| Note: 1/13/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 1/13/2025 5:20:48 PM *** All storm grates need to have erosion control fabric removed -phase 1 and 2-Jeremy informed | |||
| ROW - FINAL INSPECTION | 01/17/2025 | FINAL APPROVED | LFITZGERALD |
| LDSC- LANDSCAPE FINAL | 01/17/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 6145 *** NOTES ADDED BY LFITZGERALD 1/13/2025 10:21:39 AM *** recieved being reviewed | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 01/16/2025 | APPROVED | DRAMIREZ |
| UC - PROJECT STATUS | 01/16/2025 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/16/2025 3:17:25 PM *** HYDRANT STUFF-flow test performed-Kyle(Hazen)/Blue rpm's now installed-waiting on paint | |||
| UC-FINAL SITE INSPECTION | 01/15/2025 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/15/2025 10:47:04 AM *** some field items still remain to be completed | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 01/15/2025 | FINAL APPROVED | LFITZGERALD |
| Note: 11/20/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing | |||
| UROW - FINAL DRAINAGE | 01/13/2025 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/13/2025 5:20:48 PM *** All storm grates need to have erosion control fabric removed -phase 1 and 2-Jeremy informed | |||
| LDSC-PRE-PLANTING TREE QUALITY | 01/13/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/13/2025 10:20:52 AM *** this should of been already scheduled by contractor-i also informed city landscapecRichard to result this inspection?? | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 01/13/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/13/2025 10:21:39 AM *** recieved being reviewed | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 01/13/2025 | APPROVED | LFITZGERALD |
| Note: 8/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 8/12/2024 1:11:14 PM *** so water tie in from phase 1 to phase 2 on Spring street/there was no valve installed on end of now live line at phase 1/2 interface and as such had to go back,shut co'd valve ,put 4 homes on boil water which i coordinated with Joel.Rich Geno as bacti samples to be taken to put line back in service( Joel did tell Jamey-previous inspector to install this valve but never got done so had to do it this way) 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:08 PM *** no notes by Jamey up to this point-now stage 2 area pig flushed and pressure tested | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 01/13/2025 | APPROVED | LFITZGERALD |
| Note: 10/30/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/30/2024 11:05:41 AM *** install pipe/fittingd ti lift station piping 10/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/29/2024 5:41:23 PM *** 1 ARV INSTALLED,plans call for 2 but they are too close to each other,EOR requested by me to look into and confirm 1 way or another 6/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:50:13 AM *** no notes from Jamey or resulted inspections-now pressure test ok 6/17/2024 - PREVIOUS INSPECTION NOTES | |||
| U-GRAVITY SEWER INSTALL/TESTING | 01/13/2025 | APPROVED | LFITZGERALD |
| Note: 12/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 12/17/2024 8:31:42 AM *** Tv/Mandrei now satisfactory Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 12/17/2024 8:27:39 AM *** supposed inspected by Jamie while with CITY 10/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/29/2024 3:31:26 PM *** air pressure test satisfactory | |||
| U-PUMP STATION START-UP | 01/13/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/13/2025 10:24:40 AM *** inspected bY Don and utility reps Andrew-Brandon 12/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 12/18/2024 9:54:14 AM *** incorrect power to station-need to reschedule | |||
| LDSC-IRRIGATION FINAL | 12/20/2024 | APPROVED | RPICATAGI |
| Note: 12/13/2024 11:26:59 AM- PREVIOUS INSPECTION NOTES As agreed on site, Contractor will replace (2) TWO Magnolia trees that do not meet Florida #1 Standard Contractor also agrees to the restake trees that have blown "out-of-plum" by winds so that all trees planted on this phase are plumb. Contractor shall call in for reinspection once these issues have been corrected Inspection call in # (386) 986-4747 | |||
| U-PUMP STATION START-UP | 12/18/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/18/2024 9:54:14 AM *** incorrect power to station-need to reschedule | |||
| U-PUMP STATION PRE-INSTALLATION | 12/17/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/17/2024 8:27:39 AM *** supposed inspected by Jamie while with CITY | |||
| U-GRAVITY SEWER INSTALL/TESTING | 12/17/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/17/2024 8:31:42 AM *** Tv/Mandrei now satisfactory Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 12/17/2024 8:27:39 AM *** supposed inspected by Jamie while with CITY 10/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/29/2024 3:31:26 PM *** air pressure test satisfactory | |||
| LDSC-IRRIGATION FINAL | 12/13/2024 | Disapproved - NO FEE | RPICATAGI |
| Note: As agreed on site, Contractor will replace (2) TWO Magnolia trees that do not meet Florida #1 Standard Contractor also agrees to the restake trees that have blown "out-of-plum" by winds so that all trees planted on this phase are plumb. Contractor shall call in for reinspection once these issues have been corrected Inspection call in # (386) 986-4747 | |||
| U-REUSE MAIN INSTALL/TESTING | 11/20/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/20/2024 11:46:42 AM *** all whips required are installes and performed flow testing during walk thru-satisfactory Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:44:49 AM *** wire tone now completed/passed 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 11/20/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/20/2024 12:36:07 PM *** all required sideqalks now installed Inspector Notes from Inspection 9030 *** NOTES ADDED BY LFITZGERALD 11/20/2024 11:46:42 AM *** all whips required are installes and performed flow testing during walk thru-satisfactory Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:44:49 AM *** wire tone now completed/passed 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested | |||
| UROW-RETENT/DETENT STABILI | 11/20/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/20/2024 12:37:19 PM *** only several washouts to be corrected her-there Inspector Notes from Inspection 9220 *** NOTES ADDED BY LFITZGERALD 11/20/2024 12:36:07 PM *** all required sideqalks now installed Inspector Notes from Inspection 9030 *** NOTES ADDED BY LFITZGERALD 11/20/2024 11:46:42 AM *** all whips required are installes and performed flow testing during walk thru-satisfactory Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:44:49 AM *** wire tone now completed/passed 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested | |||
| UROW -FINAL GRADE PRIOR SOD | 11/20/2024 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9225 *** NOTES ADDED BY LFITZGERALD 11/20/2024 12:37:19 PM *** only several washouts to be corrected her-there Inspector Notes from Inspection 9220 *** NOTES ADDED BY LFITZGERALD 11/20/2024 12:36:07 PM *** all required sideqalks now installed Inspector Notes from Inspection 9030 *** NOTES ADDED BY LFITZGERALD 11/20/2024 11:46:42 AM *** all whips required are installes and performed flow testing during walk thru-satisfactory Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:44:49 AM *** wire tone now completed/passed 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested | |||
| UC-SUBSTANTIAL WALK-THRU | 11/20/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/20/2024 11:45:47 AM *** jeremy with small amount-nothing mayjor-punch list items-walked with joel-manny -EOR-Jason | |||
| UC- PRELIMINARY AS-BUILTS | 11/20/2024 | APPROVED | LFITZGERALD |
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 11/20/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing | |||
| U-WATER MAIN DISINFECTION SAMPLING | 11/13/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing | |||
| U-WATER SERVICE INSTALLATION | 11/13/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:42:58 PM *** all water service whips accounted for and flowing water | |||
| U-WATER MAIN DISINFECTION SAMPLING | 11/12/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing | |||
| U-WATER MAIN DISINFECTION | 11/06/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 10/30/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/30/2024 11:05:41 AM *** install pipe/fittingd ti lift station piping 10/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/29/2024 5:41:23 PM *** 1 ARV INSTALLED,plans call for 2 but they are too close to each other,EOR requested by me to look into and confirm 1 way or another 6/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:50:13 AM *** no notes from Jamey or resulted inspections-now pressure test ok 6/17/2024 - PREVIOUS INSPECTION NOTES | |||
| U-GRAVITY SEWER INSTALL/TESTING | 10/29/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/29/2024 3:31:26 PM *** air pressure test satisfactory | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 10/29/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/29/2024 5:41:23 PM *** 1 ARV INSTALLED,plans call for 2 but they are too close to each other,EOR requested by me to look into and confirm 1 way or another 6/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:50:13 AM *** no notes from Jamey or resulted inspections-now pressure test ok 6/17/2024 - PREVIOUS INSPECTION NOTES | |||
| U-WATER MAIN DISINFECTION | 10/17/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing | |||
| U-REUSE MAIN INSTALL/TESTING | 10/17/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:44:49 AM *** wire tone now completed/passed 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested | |||
| U-GRAVITY SEWER INSTALL/TESTING | 09/06/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing | |||
| UC-ASPHALT PRE PLACEMENT | 09/05/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/5/2024 4:43:23 PM *** all lifts placed -phase 2 and final lift -ph1 | |||
| UROW- CURBING & GUTTER | 09/05/2024 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9111 *** NOTES ADDED BY LFITZGERALD 9/5/2024 4:43:23 PM *** all lifts placed -phase 2 and final lift -ph1 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:52:58 PM *** starting miami curb install Hawthorn-stage 2 Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:51:20 PM *** nothing resulted by Jamie up to this point | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 08/12/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 8/12/2024 1:11:14 PM *** so water tie in from phase 1 to phase 2 on Spring street/there was no valve installed on end of now live line at phase 1/2 interface and as such had to go back,shut co'd valve ,put 4 homes on boil water which i coordinated with Joel.Rich Geno as bacti samples to be taken to put line back in service( Joel did tell Jamey-previous inspector to install this valve but never got done so had to do it this way) 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:08 PM *** no notes by Jamey up to this point-now stage 2 area pig flushed and pressure tested | |||
| U-GRAVITY SEWER INSTALL/TESTING | 06/26/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing | |||
| UROW- CURBING & GUTTER | 06/26/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:52:58 PM *** starting miami curb install Hawthorn-stage 2 Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:51:20 PM *** nothing resulted by Jamie up to this point | |||
| UC-DRAINAGE STRUCT PLACMNT | 06/26/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:51:20 PM *** nothing resulted by Jamie up to this point | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 06/26/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9113 *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:51:20 PM *** nothing resulted by Jamie up to this point | |||
| UC-CONSTRUCTION ENTRANCE | 06/26/2024 | APPROVED | LFITZGERALD |
| U-SEWER FORCE MAIN INSTALL/TESTING | 06/18/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:50:13 AM *** no notes from Jamey or resulted inspections-now pressure test ok 6/17/2024 - PREVIOUS INSPECTION NOTES | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 06/17/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 06/17/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:08 PM *** no notes by Jamey up to this point-now stage 2 area pig flushed and pressure tested | |||
| U-REUSE MAIN INSTALL/TESTING | 06/17/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 01/31/2024 | APPROVED | JHARDING |
| PLAN - PRE-CON 386-986-3750 | 01/25/2024 | APPROVED | JHARDING |
| UC - PROJECT STATUS | 02/13/2023 | APPROVED | JHARDING |
| Note: Selt fence installed and exstending water and reclaim to install curb. | |||
| PLAN - PRE-CON 386-986-3750 | 04/21/2022 | APPROVED | JHARDING |
Review History
| Department | Status | Date In | Date Out |
| PLENG | COMPLETE | 03/08/2022 | 03/09/2022 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 03/08/2022 | 03/23/2022 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 03/08/2022 | 03/09/2022 |
| Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 04/21/2022 |
| SITE INSPECTION | ¤800.00 | 04/21/2022 |
| SITE PLAN 20 | ¤20.00 | 04/21/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤945.00 |