Permit #2022030494

Permit Details

Status: FINAL

Parcel Id: 05-12-31-0650-000A0-0016
Block: 000A0
Subdivision: -
Job Phone: 386-322-8700
Location Address: 5000 LAKE AVE
Type: SDD - SUBDIVISION SITE DEVELOPMENT
Issue Date: 04/21/2022
NOC: Unknown
Applicant name: CHAD HAZEN
Owner: PAYZEN PC LLC

Address

SUITE 1

PORT ORANGE, FL 32127

Address

794 SANDRES ROAD

PORT ORANGE, FL 32127

Lot: 0016
Job Description: SITE WORK - TOWN CENTER TRACT 19 STAGE 2- SFR LOTS
Type: CN

Contractor

HAZEN CONSTRUCTION LLC
Status Location Address State License Number Phone
ACTIVE

1599 TIONIA RD

NEW SMYRNA BEACH, FL 32168

CGC061991 (Exp: 08/31/2026) 386-322-8700

Inspection History

Type Request Date Result Inspector
MAINT BOND ACCEPTANCE (OFFICE) 02/07/2025 APPROVED DRAMIREZ
CLOSE OUT DOCUMENTS 02/05/2025 APPROVED DRAMIREZ
UC - PROJECT STATUS 01/22/2025 APPROVED - AS NOTED LFITZGERALD
Note: all hydrants now painted city colors/flow reports recieved 1/16/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 1/16/2025 3:17:25 PM *** HYDRANT STUFF-flow test performed-Kyle(Hazen)/Blue rpm's now installed-waiting on paint
UC-FINAL SITE INSPECTION 01/22/2025 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9101 all hydrants now painted city colors/flow reports recieved 1/16/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 1/16/2025 3:17:25 PM *** HYDRANT STUFF-flow test performed-Kyle(Hazen)/Blue rpm's now installed-waiting on paint 1/15/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 1/15/2025 10:47:04 AM *** some field items still remain to be completed
U - UTILITY COMMERCIAL FINAL 01/17/2025 FINAL APPROVED LFITZGERALD
UROW - FINAL DRAINAGE 01/17/2025 APPROVED LFITZGERALD
Note: 1/13/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 1/13/2025 5:20:48 PM *** All storm grates need to have erosion control fabric removed -phase 1 and 2-Jeremy informed
ROW - FINAL INSPECTION 01/17/2025 FINAL APPROVED LFITZGERALD
LDSC- LANDSCAPE FINAL 01/17/2025 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 6145 *** NOTES ADDED BY LFITZGERALD 1/13/2025 10:21:39 AM *** recieved being reviewed
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 01/16/2025 APPROVED DRAMIREZ
UC - PROJECT STATUS 01/16/2025 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/16/2025 3:17:25 PM *** HYDRANT STUFF-flow test performed-Kyle(Hazen)/Blue rpm's now installed-waiting on paint
UC-FINAL SITE INSPECTION 01/15/2025 CANCELLED BY APPLICANT LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/15/2025 10:47:04 AM *** some field items still remain to be completed
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 01/15/2025 FINAL APPROVED LFITZGERALD
Note: 11/20/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing
UROW - FINAL DRAINAGE 01/13/2025 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/13/2025 5:20:48 PM *** All storm grates need to have erosion control fabric removed -phase 1 and 2-Jeremy informed
LDSC-PRE-PLANTING TREE QUALITY 01/13/2025 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/13/2025 10:20:52 AM *** this should of been already scheduled by contractor-i also informed city landscapecRichard to result this inspection??
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 01/13/2025 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/13/2025 10:21:39 AM *** recieved being reviewed
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 01/13/2025 APPROVED LFITZGERALD
Note: 8/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 8/12/2024 1:11:14 PM *** so water tie in from phase 1 to phase 2 on Spring street/there was no valve installed on end of now live line at phase 1/2 interface and as such had to go back,shut co'd valve ,put 4 homes on boil water which i coordinated with Joel.Rich Geno as bacti samples to be taken to put line back in service( Joel did tell Jamey-previous inspector to install this valve but never got done so had to do it this way) 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:08 PM *** no notes by Jamey up to this point-now stage 2 area pig flushed and pressure tested
U-SEWER FORCE MAIN INSTALL/TESTING 01/13/2025 APPROVED LFITZGERALD
Note: 10/30/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/30/2024 11:05:41 AM *** install pipe/fittingd ti lift station piping 10/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/29/2024 5:41:23 PM *** 1 ARV INSTALLED,plans call for 2 but they are too close to each other,EOR requested by me to look into and confirm 1 way or another 6/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:50:13 AM *** no notes from Jamey or resulted inspections-now pressure test ok 6/17/2024 - PREVIOUS INSPECTION NOTES
U-GRAVITY SEWER INSTALL/TESTING 01/13/2025 APPROVED LFITZGERALD
Note: 12/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 12/17/2024 8:31:42 AM *** Tv/Mandrei now satisfactory Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 12/17/2024 8:27:39 AM *** supposed inspected by Jamie while with CITY 10/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/29/2024 3:31:26 PM *** air pressure test satisfactory
U-PUMP STATION START-UP 01/13/2025 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/13/2025 10:24:40 AM *** inspected bY Don and utility reps Andrew-Brandon 12/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 12/18/2024 9:54:14 AM *** incorrect power to station-need to reschedule
LDSC-IRRIGATION FINAL 12/20/2024 APPROVED RPICATAGI
Note: 12/13/2024 11:26:59 AM- PREVIOUS INSPECTION NOTES As agreed on site, Contractor will replace (2) TWO Magnolia trees that do not meet Florida #1 Standard Contractor also agrees to the restake trees that have blown "out-of-plum" by winds so that all trees planted on this phase are plumb. Contractor shall call in for reinspection once these issues have been corrected Inspection call in # (386) 986-4747
U-PUMP STATION START-UP 12/18/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/18/2024 9:54:14 AM *** incorrect power to station-need to reschedule
U-PUMP STATION PRE-INSTALLATION 12/17/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/17/2024 8:27:39 AM *** supposed inspected by Jamie while with CITY
U-GRAVITY SEWER INSTALL/TESTING 12/17/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/17/2024 8:31:42 AM *** Tv/Mandrei now satisfactory Inspector Notes from Inspection 9060 *** NOTES ADDED BY LFITZGERALD 12/17/2024 8:27:39 AM *** supposed inspected by Jamie while with CITY 10/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/29/2024 3:31:26 PM *** air pressure test satisfactory
LDSC-IRRIGATION FINAL 12/13/2024 Disapproved - NO FEE RPICATAGI
Note: As agreed on site, Contractor will replace (2) TWO Magnolia trees that do not meet Florida #1 Standard Contractor also agrees to the restake trees that have blown "out-of-plum" by winds so that all trees planted on this phase are plumb. Contractor shall call in for reinspection once these issues have been corrected Inspection call in # (386) 986-4747
U-REUSE MAIN INSTALL/TESTING 11/20/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/20/2024 11:46:42 AM *** all whips required are installes and performed flow testing during walk thru-satisfactory Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:44:49 AM *** wire tone now completed/passed 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 11/20/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/20/2024 12:36:07 PM *** all required sideqalks now installed Inspector Notes from Inspection 9030 *** NOTES ADDED BY LFITZGERALD 11/20/2024 11:46:42 AM *** all whips required are installes and performed flow testing during walk thru-satisfactory Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:44:49 AM *** wire tone now completed/passed 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested
UROW-RETENT/DETENT STABILI 11/20/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/20/2024 12:37:19 PM *** only several washouts to be corrected her-there Inspector Notes from Inspection 9220 *** NOTES ADDED BY LFITZGERALD 11/20/2024 12:36:07 PM *** all required sideqalks now installed Inspector Notes from Inspection 9030 *** NOTES ADDED BY LFITZGERALD 11/20/2024 11:46:42 AM *** all whips required are installes and performed flow testing during walk thru-satisfactory Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:44:49 AM *** wire tone now completed/passed 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested
UROW -FINAL GRADE PRIOR SOD 11/20/2024 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9225 *** NOTES ADDED BY LFITZGERALD 11/20/2024 12:37:19 PM *** only several washouts to be corrected her-there Inspector Notes from Inspection 9220 *** NOTES ADDED BY LFITZGERALD 11/20/2024 12:36:07 PM *** all required sideqalks now installed Inspector Notes from Inspection 9030 *** NOTES ADDED BY LFITZGERALD 11/20/2024 11:46:42 AM *** all whips required are installes and performed flow testing during walk thru-satisfactory Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:44:49 AM *** wire tone now completed/passed 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested
UC-SUBSTANTIAL WALK-THRU 11/20/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/20/2024 11:45:47 AM *** jeremy with small amount-nothing mayjor-punch list items-walked with joel-manny -EOR-Jason
UC- PRELIMINARY AS-BUILTS 11/20/2024 APPROVED LFITZGERALD
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 11/20/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: Inspector Notes from Inspection 9050 *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing
U-WATER MAIN DISINFECTION SAMPLING 11/13/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:43:37 PM *** day 2 obtained by Kyle with Hazen 11/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing
U-WATER SERVICE INSTALLATION 11/13/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:42:58 PM *** all water service whips accounted for and flowing water
U-WATER MAIN DISINFECTION SAMPLING 11/12/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/12/2024 3:56:25 PM *** bacti -day1 Inspector Notes from Inspection 9040 *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing
U-WATER MAIN DISINFECTION 11/06/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/6/2024 12:43:23 PM *** Kyle-Hazen-chlorinatinting potable main/service whips 10/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing
U-SEWER FORCE MAIN INSTALL/TESTING 10/30/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 10/30/2024 11:05:41 AM *** install pipe/fittingd ti lift station piping 10/29/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/29/2024 5:41:23 PM *** 1 ARV INSTALLED,plans call for 2 but they are too close to each other,EOR requested by me to look into and confirm 1 way or another 6/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:50:13 AM *** no notes from Jamey or resulted inspections-now pressure test ok 6/17/2024 - PREVIOUS INSPECTION NOTES
U-GRAVITY SEWER INSTALL/TESTING 10/29/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 10/29/2024 3:31:26 PM *** air pressure test satisfactory
U-SEWER FORCE MAIN INSTALL/TESTING 10/29/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 10/29/2024 5:41:23 PM *** 1 ARV INSTALLED,plans call for 2 but they are too close to each other,EOR requested by me to look into and confirm 1 way or another 6/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:50:13 AM *** no notes from Jamey or resulted inspections-now pressure test ok 6/17/2024 - PREVIOUS INSPECTION NOTES
U-WATER MAIN DISINFECTION 10/17/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:43:44 AM *** inadvertent resulted Inspector Notes from Inspection 9020 *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing
U-REUSE MAIN INSTALL/TESTING 10/17/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 10/17/2024 8:44:49 AM *** wire tone now completed/passed 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested
U-GRAVITY SEWER INSTALL/TESTING 09/06/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 9/6/2024 12:21:03 PM *** now tv/mandrel all sewer mains/had meeting on site with TV crew-Jeremy and city inspectors to review/ensure proper testing aspects as required by city SOP were being employed and continuously be followed 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing
UC-ASPHALT PRE PLACEMENT 09/05/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 9/5/2024 4:43:23 PM *** all lifts placed -phase 2 and final lift -ph1
UROW- CURBING & GUTTER 09/05/2024 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9111 *** NOTES ADDED BY LFITZGERALD 9/5/2024 4:43:23 PM *** all lifts placed -phase 2 and final lift -ph1 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:52:58 PM *** starting miami curb install Hawthorn-stage 2 Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:51:20 PM *** nothing resulted by Jamie up to this point
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 08/12/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 8/12/2024 1:11:14 PM *** so water tie in from phase 1 to phase 2 on Spring street/there was no valve installed on end of now live line at phase 1/2 interface and as such had to go back,shut co'd valve ,put 4 homes on boil water which i coordinated with Joel.Rich Geno as bacti samples to be taken to put line back in service( Joel did tell Jamey-previous inspector to install this valve but never got done so had to do it this way) 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:08 PM *** no notes by Jamey up to this point-now stage 2 area pig flushed and pressure tested
U-GRAVITY SEWER INSTALL/TESTING 06/26/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:50:02 PM *** nothing resulted by Jamie-all gravity installed-waiting now on testing
UROW- CURBING & GUTTER 06/26/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:52:58 PM *** starting miami curb install Hawthorn-stage 2 Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:51:20 PM *** nothing resulted by Jamie up to this point
UC-DRAINAGE STRUCT PLACMNT 06/26/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:51:20 PM *** nothing resulted by Jamie up to this point
UC-DRAINAGE PIPE PLACEMENT/LAMPING 06/26/2024 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9113 *** NOTES ADDED BY LFITZGERALD 6/26/2024 4:51:20 PM *** nothing resulted by Jamie up to this point
UC-CONSTRUCTION ENTRANCE 06/26/2024 APPROVED LFITZGERALD
U-SEWER FORCE MAIN INSTALL/TESTING 06/18/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:50:13 AM *** no notes from Jamey or resulted inspections-now pressure test ok 6/17/2024 - PREVIOUS INSPECTION NOTES
U-SEWER FORCE MAIN INSTALL/TESTING 06/17/2024 CANCELLED BY APPLICANT LFITZGERALD
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 06/17/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:08 PM *** no notes by Jamey up to this point-now stage 2 area pig flushed and pressure tested
U-REUSE MAIN INSTALL/TESTING 06/17/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:28:55 PM *** no notes by Jamey up to this point-now-pig flushed and pressure tested
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 01/31/2024 APPROVED JHARDING
PLAN - PRE-CON 386-986-3750 01/25/2024 APPROVED JHARDING
UC - PROJECT STATUS 02/13/2023 APPROVED JHARDING
Note: Selt fence installed and exstending water and reclaim to install curb.
PLAN - PRE-CON 386-986-3750 04/21/2022 APPROVED JHARDING

Review History

Department Status Date In Date Out
PLENG COMPLETE 03/08/2022 03/09/2022
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 03/08/2022 03/23/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 03/08/2022 03/09/2022
Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE- SITE DEVELOP ¤125.00 04/21/2022
SITE INSPECTION ¤800.00 04/21/2022
SITE PLAN 20 ¤20.00 04/21/2022
Fees Total Due: ¤0.00 Total Paid: ¤945.00