Permit #2022030543

Permit Details

Status: COED

Parcel Id: 35-11-31-4075-00000-0890
GARAGE: 406 sqft
CONDITIONED SPACE: 3324 sqft
SCREEN PORCH (SOLID ROOF) : 219 sqft
PATIO/DECK (NO ROOF) : 309 sqft
Total Square Footage: 4258 sqft
Block: 00000
Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION
Job Phone: 863-647-5815
Location Address: 43 DEL PALMA DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/29/2022
NOC: RECORDED
Applicant name: MARK ALLAN HULBERT
Owner: EDWARD JOEL LAKE TRUSTEE

Address

101 S FORT LAUDERDALE BEACH BLVD

FORT LAUDERDALE, FL 33316

Lot: 0890
Contracted Stated Job Value: ¤642,300.00
Job Description: Single Family Residence
Type: CN

Contractor

HULBERT HOMES INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 6254

LAKELAND, FL 33813

CRC1331304 (Exp: 08/31/2026) 863-647-5815

Sub Contractors

JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
BRETT CHRISTIAN GIBSON
Status Location Address State License Number Phone
ACTIVE

250 SEGOVIA RD

ST AUGUSTINE, FL 32086

CAC1818423 (Exp: 08/31/2026) 904-229-8131
ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
BOB BELL
Status Location Address State License Number Phone Fax
ACTIVE

3200 PARKER DRIVE

ST AUGUSTINE, FL 32084

LG35711 (Exp: 08/31/2027) 904-417-6470 877-566-4016

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/25/2024 FINAL APPROVED BTAYLOR
Note: 9/3/2024 - PREVIOUS INSPECTION NOTES 9-3-24 1. Wall chase for wine cellar line set needs to be sealed off. 2. Master shower will not work. 3. Energy cals for upstairs unit do not match. 4. No heat strip on air handler in attic.
ROW - FINAL INSPECTION 09/18/2024 APPROVED - AS NOTED FSLADISH
Note: 9/18/24 THIS PROPERTY HAS ALREADY BEEN CLEARED BY STORMWATER WITH A ROW FINAL PASSAGE ON 3/28/24. APPROVING AS NOTED THAT THIS INSPECTION HAD ALREADY BEEN PREVIOUSLY COMPLETED.
BLD - BUILDING FINAL 09/03/2024 Disapproved - NO FEE BTAYLOR
Note: 9-3-24 1. Wall chase for wine cellar line set needs to be sealed off. 2. Master shower will not work. 3. Energy cals for upstairs unit do not match. 4. No heat strip on air handler in attic.
U-CROSS CONNECTION 03/28/2024 APPROVED - AS NOTED JHARDING
Note: No cross connections.
ROW - FINAL APRON (AFTER POUR) 03/28/2024 APPROVED TPOLACEK
Note: 03/28/24 PAVERS ARE SET CONCRETE IS GOOD AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 03/18/24 ALL BARE AREAS IN BACK OF PROPERTY MUST HAVE SOD TO PREVENT WASHOUT INTO DRAINAGE. I WILL APPROVE THIS INSPECTION AS NOTED. PLEASE MAKE CORRECTIONS BEFORE FINAL ROW
U -UTILITY RESIDENTIAL FINAL 03/28/2024 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 03/28/2024 APPROVED TPOLACEK
Note: 03/28/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 03/18/24 ALL BARE AREAS IN BACK OF PROPERTY MUST HAVE SOD TO PREVENT WASHOUT INTO DRAINAGE. I WILL APPROVE THIS INSPECTION AS NOTED. PLEASE MAKE CORRECTIONS BEFORE FINAL ROW
ROW FIELD SURVEY /GRADING CERTIFICATION 03/18/2024 APPROVED - AS NOTED TPOLACEK
Note: 03/18/24 ALL BARE AREAS IN BACK OF PROPERTY MUST HAVE SOD TO PREVENT WASHOUT INTO DRAINAGE. I WILL APPROVE THIS INSPECTION AS NOTED. PLEASE MAKE CORRECTIONS BEFORE FINAL ROW
FINAL SURVEY (OFFICE USE ONLY) 03/18/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- PRE-APRON (PRE-POUR) 10/11/2023 APPROVED FSLADISH
Note: 10/11/23 SPREAD AND COMPACTED. READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ______________________________________________________________________________________________________________________ New inspection due to canceled inspection 10/5/2023 - PREVIOUS INSPECTION NOTES 10/05/23 CORRECTION MADE. READY TO POUR ROW AND PAVER RESTRAINTS. PARTIALLY APPROVING. YOU MAY NOW SPEAD AND COMPACT PAVER BASE. DO NOT LAY ANY PAVERS UNTIL AFTER YOU HAVE BEEN INSPECTED FOR COMPACTION AND CONCRETE POUR. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ___________________________________________________________________________________________________________________ 10/4/2023 - PREVIOUS INSPECTION NOTES 10/04/23 SIDEWALK FORMS AT THE DRIVEWAY APRON ARE PITCHED BACKWARD. WATER MUST FLOW FROM SIDEWALK TO ROAD AND GUTTER AT NO MORE THAN A 2% SLOPE, BUT CANNOT HAVE NEGATIVE FLOW. SEE PICTURES FOR REFERENCE.
ROW- PRE-APRON (PRE-POUR) 10/10/2023 CANCELLED BY APPLICANT WEB
Note: 10/5/2023 - PREVIOUS INSPECTION NOTES 10/05/23 CORRECTION MADE. READY TO POUR ROW AND PAVER RESTRAINTS. PARTIALLY APPROVING. YOU MAY NOW SPEAD AND COMPACT PAVER BASE. DO NOT LAY ANY PAVERS UNTIL AFTER YOU HAVE BEEN INSPECTED FOR COMPACTION AND CONCRETE POUR. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ___________________________________________________________________________________________________________________ 10/4/2023 - PREVIOUS INSPECTION NOTES 10/04/23 SIDEWALK FORMS AT THE DRIVEWAY APRON ARE PITCHED BACKWARD. WATER MUST FLOW FROM SIDEWALK TO ROAD AND GUTTER AT NO MORE THAN A 2% SLOPE, BUT CANNOT HAVE NEGATIVE FLOW. SEE PICTURES FOR REFERENCE.
ROW- PRE-APRON (PRE-POUR) 10/05/2023 PARTIALLY APPROVED FSLADISH
Note: 10/05/23 CORRECTION MADE. READY TO POUR ROW AND PAVER RESTRAINTS. PARTIALLY APPROVING. YOU MAY NOW SPEAD AND COMPACT PAVER BASE. DO NOT LAY ANY PAVERS UNTIL AFTER YOU HAVE BEEN INSPECTED FOR COMPACTION AND CONCRETE POUR. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ___________________________________________________________________________________________________________________ 10/4/2023 - PREVIOUS INSPECTION NOTES 10/04/23 SIDEWALK FORMS AT THE DRIVEWAY APRON ARE PITCHED BACKWARD. WATER MUST FLOW FROM SIDEWALK TO ROAD AND GUTTER AT NO MORE THAN A 2% SLOPE, BUT CANNOT HAVE NEGATIVE FLOW. SEE PICTURES FOR REFERENCE.
ROW- PAVER RESTRAINTS 10/05/2023 APPROVED FSLADISH
Note: 10/05/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 10/04/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 10/04/23 SIDEWALK FORMS AT THE DRIVEWAY APRON ARE PITCHED BACKWARD. WATER MUST FLOW FROM SIDEWALK TO ROAD AND GUTTER AT NO MORE THAN A 2% SLOPE, BUT CANNOT HAVE NEGATIVE FLOW. SEE PICTURES FOR REFERENCE.
ELECTRIC - EARLY POWER 07/10/2023 APPROVED - AS NOTED BTAYLOR
Note: 7/7/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2200 2-28-23 1. Emailed FPL at 10:57. 7-10-23 1. Emailed FPL at 11:57. 7-7-23 1. Light in kitchen needs to be safed off.
ELECTRIC - EARLY POWER 07/07/2023 Disapproved - NO FEE BTAYLOR
Note: Inspector Notes from Inspection 2200 2-28-23 1. Emailed FPL at 10:57. 7-7-23 1. Light in kitchen needs to be safed off.
INSULATION 06/08/2023 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 06/07/2023 APPROVED BTAYLOR
ALL ROUGH 04/25/2023 APPROVED BTAYLOR
ELECTRIC-TUG 02/28/2023 APPROVED - AS NOTED BTAYLOR
Note: 2-28-23 1. Emailed FPL at 10:57.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/23/2022 APPROVED DCUSHING
Note: 9/22/2022 - PREVIOUS INSPECTION NOTES 09/21/2021 - * Approved plans not on site - INSPECTION STOPPED FBCR 107.3,1. Approved Documents need to be on site for inspection (need the APPROVED AHRI on site at time of inspection) 6TH EDITION) 9.23.22 - Approved plans on site
WALL SHEATHING 09/22/2022 APPROVED RSIMS
Note: 9/16/2022 - PREVIOUS INSPECTION NOTES 9/15/2022 - PREVIOUS INSPECTION NOTES entire back wall not nailed off. 9-16-22 Cancelled per conversation with framer its not ready. (see notes above)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/22/2022 Disapproved -FEE REQUIRED RSIMS
Note: 09/22/2021 - * Approved plans not on site - INSPECTION STOPPED FBCR 107.3,1. Approved Documents need to be on site for inspection (need the APPROVED AHRI on site at time of inspection) 6TH EDITION)
ROOF SHEATHING 09/22/2022 APPROVED RSIMS
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES 9/14/2022 - PREVIOUS INSPECTION NOTES need access to second floor for inspection (stairs are incomplete) 9-15-22 per notes below this is a request for a partial roof sheathing. We do not do partial roof sheathing inspections. Your request for a roof sheathing is technically already a partial because the normal process is to check the roof sheathing at the roof sheathing braces ties down cell inspection, this would therefore be a request for a partial on a partial.
ROOF VALLEY & METAL 09/22/2022 APPROVED RSIMS
WALL SHEATHING 09/16/2022 CANCELLED BY APPLICANT LMILLER
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES entire back wall not nailed off. 9-16-22 Cancelled per conversation with framer its not ready. (see notes above)
ROOF SHEATHING 09/15/2022 Disapproved - NO FEE LMILLER
Note: 9/14/2022 - PREVIOUS INSPECTION NOTES need access to second floor for inspection (stairs are incomplete) 9-15-22 per notes below this is a request for a partial roof sheathing. We do not do partial roof sheathing inspections. Your request for a roof sheathing is technically already a partial because the normal process is to check the roof sheathing at the roof sheathing braces ties down cell inspection, this would therefore be a request for a partial on a partial.
WALL SHEATHING 09/15/2022 Disapproved -FEE REQUIRED RSIMS
Note: entire back wall not nailed off.
ROOF SHEATHING 09/14/2022 Disapproved - NO FEE LMILLER
Note: need access to second floor for inspection (stairs are incomplete)
TIE BEAM / LINTEL 08/03/2022 APPROVED TSTAUFFACHER
Note: 08/03/2022-INSPECTOR NOTES-hOUSE HAS APPROVED CHANGE ORDERS FOR REAR WINDOWS AND TRUSS LAYOUT
FOUND SURVEY APPROVED (OFFICE) 06/24/2022 APPROVED TBAKER
MONOLITHIC SLAB 05/19/2022 APPROVED AGAETANO
WATER METER INSTALLATION REQUEST 05/18/2022 APPROVED CSTONE
U - SEWER TIE IN 05/05/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 05/05/2022 APPROVED MGIBSON
PLUMBING 1ST ROUGH UNDERGROUND 05/04/2022 APPROVED - AS NOTED MGIBSON
Note: THIS IS A REINSPECTION SPOKE TO MIKE FROM HUMMBARD HOMES NEED TO LIST CORRECT PLUMBING SUB CONTRACTOR FOR THE JOB ASAP TO PRO-TEAM, ALSO GRAVITY SEWER AND U-SEWER TIE IN COMPLETED. SPOKE TO CODY AND MADE HIM AWARE OF THE CHANGES AND INSPECTIONS THAT NEEDED TO BE SCHEDULED
PLUMBING 1ST ROUGH UNDERGROUND 05/02/2022 CANCELLED BY APPLICANT MGIBSON
Note: SPOKE TO MIKE FROM HUMMBARD HOMES

Review History

Department Status Date In Date Out
MECH COMPLETE 09/19/2024 09/24/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 09/17/2024 09/17/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition 2. Provide duct layout signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition
BLD COMPLETE 12/14/2023 12/15/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 12/05/2023 12/11/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to highlight or show what numbers are changing.
BLD COMPLETE 08/11/2022 08/12/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 08/01/2022 08/01/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. A revision to the Product Approval Sheet is required. Revise o reflect the proposed windows to be added. 2. On Sheet 5, the proposed lintel called-out is “F”. Provide if a larger lintel is to be installed. 3. Proposed front column was removed from sheet 5 of the revised drawing. Column is shown on sheet 6a. Provide if column is to remain or be removed.
ENGIN1 COMPLETE 06/24/2022 06/24/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/24/2022 06/24/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 04/14/2022 04/18/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/14/2022 04/19/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 04/14/2022 04/22/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 04/06/2022 04/06/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Ac pad is located in the 5ft easement. This is not the typical 5ft easement that allows for mechanical equipment to be located in. AC pad must be screened with 7 gallon plantings or approved fencing
ENGIN1 COMPLETE 04/06/2022 04/06/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 04/06/2022 04/11/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ELEC COMPLETE 03/28/2022 03/29/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 03/28/2022 03/28/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM New Survey submitted has front and rear setbacks around other number and information so they can not clearly be seen. Please have surveyor make sure those setbacks are clear for review. AC pad must be screened with 7 gallon plantings or approved fencing
MECH COMPLETE 03/28/2022 03/28/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/28/2022 04/05/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/28/2022 03/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
URB COMPLETE 03/10/2022 03/10/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 03/09/2022 03/09/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 03/09/2022 03/16/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 03/09/2022 03/09/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bedroom 2,3 and great room. NEC 2017210.52 2. Submit a electric riser diagram for a 300 amp service.
ENGIN1 COMPLETE 03/09/2022 03/09/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 03/09/2022 03/11/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 03/09/2022 03/10/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show 2x4 wall. Energy Calcs say R19. Unable to put R19 in 2x4 wall. Revise plans or calcs to show correct values. 2. Plans show foamboard insulation on block walls. (Typically R5.) Energy Calcs say R12 exterior insulation. Revise plans or calcs to show correct values
SW1 HOLD 03/09/2022 03/14/2022
Note: Held By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM Lot drainage features and patterns must be clearly depicted and include flow arrows.(A)
ZON HOLD 03/09/2022 03/10/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Ac pad location on site plan doesn't match landscape and plans location AC pad must be screened with 7 gallon plantings or approved fencing

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 09/25/2024
PLAN REVIEW - REVISION ¤32.50 09/25/2024
REINSPECTION RESIDENTIAL ¤40.00 09/25/2024
REINSPECTION RESIDENTIAL ¤40.00 09/25/2024
CONTRACTOR CHANGE ¤40.00 09/25/2024
SW ENG REINSPECTION 30 ¤30.00 09/25/2024
SW ENG - REVIEW 20 ¤20.00 04/29/2022
SW ENG RES REVIEW 200 ¤200.00 04/29/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 04/29/2022
SEWER INSPECTION ¤25.00 04/29/2022
SEWER CAPITAL FACILITY ¤2,607.06 04/29/2022
WATER CAPITAL FACILITY FEE ¤2,436.75 04/29/2022
SITE PLAN 30 ¤30.00 04/29/2022
IMPACT FEE FIRE ¤388.65 04/29/2022
IMPACT FEE PARKS ¤1,455.13 04/29/2022
IMPACT FEE SCHOOL ¤3,600.00 04/29/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 04/29/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 04/29/2022
SURCHARGE FS 533.721 ¤23.90 04/29/2022
SURCHARGE - FS 468.631 ¤35.84 04/29/2022
SW ENG - FOUNDATION SURVEY ¤20.00 04/29/2022
SW ENG INSPECTION 80 ¤80.00 04/29/2022
SW ENG PRE APRON ¤30.00 04/29/2022
CONNECTION FEES ¤25.00 04/29/2022
WATER-METER ¤467.09 04/29/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/29/2022
INSPECTION - RESIDENTIAL ¤1,768.25 04/29/2022
PLAN REVIEW - RESIDENTIAL ¤501.54 04/29/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,042.84