Permit #2022030683

Permit Details

Status: COED

Parcel Id: 07-11-31-7016-00050-0100
CONDITIONED SPACE: 1280 sqft
GARAGE: 250 sqft
CONDITIONED SPACE: 1280 sqft
GARAGE: 250 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
OPENED PORCH (WITH ROOF) : 144 sqft
OPENED PORCH (WITH ROOF) : 144 sqft
Total Square Footage: 3420 sqft
Block: 00050
Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE
Job Phone: 904-347-7837
Location Address: 19 COLUMBIA LN
Type: DU - DUPLEX
Issue Date: 05/12/2022
NOC: RECORDED
Applicant name: ERIC PAUL PANNONE
Owner: WOLF JOHN & MARIA H&W

Address

8 SUNRISE CIRCLE

PALM COAST, FL 32137

Lot: 0100
Contracted Stated Job Value: ¤327,000.00
Job Description: Duplex
Type: CN

Contractor

CASTAWAY CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

30 FERNON LANE

PALM COAST, FL 32137

CBC1266321 (Exp: 08/31/2026) 904-347-7837

Sub Contractors

OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
SHAWN R RAMNARINE SINGH
Status Location Address State License Number Phone
INACTIVE

4 SEASIDE CT

PALM COAST, FL 32164

CAC1818766 (Exp: 08/31/2026) 306-302-2179
RYAN PENNINGTON
Status Location Address State License Number Phone
ACTIVE

3075 WATEROAK ROAD

BUNNELL, FL 32110

ER13016228 (Exp: 08/31/2026) 386-481-3357

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 02/04/2025 APPROVED LFITZGERALD
Note: 8/27/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 8/27/2024 2:21:58 PM *** no irrigation so no cross connection to residence BUT bth water meter oxes full of soils -cant know if there aredbl check valves on meter assembly that protects city water-clean out pits to btm. of meter assembly
BLD - BUILDING FINAL 01/31/2025 FINAL APPROVED HCAMACHO
Note: 1/24/2025 - PREVIOUS INSPECTION NOTES 1. Hose bibs missing Anti - Siphon valves.A&B Sides FBCR P2902.4.3 2. Garage door bucks missing bolt that was removed when door was installed on top. A&B sides 4. Anti tip bracket on stove A & B sidesFBCR M1901.2 5. Insulation certificate missing. A&B sides FBC EC R303.1.1.2 6. Need to Revise Energy Calcs to meet what is installed. A&B sides. FBC [A] 107.4
U -UTILITY RESIDENTIAL FINAL 01/31/2025 FINAL APPROVED LFITZGERALD
Note: 1/24/2025 - PREVIOUS INSPECTION NOTES lower sewer clean niuts/remove soils from water meter pit
U -UTILITY RESIDENTIAL FINAL 01/24/2025 Disapproved -FEE REQUIRED LFITZGERALD
Note: lower sewer clean niuts/remove soils from water meter pit
BLD - BUILDING FINAL 01/24/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Hose bibs missing Anti - Siphon valves.A&B Sides FBCR P2902.4.3 2. Garage door bucks missing bolt that was removed when door was installed on top. A&B sides 4. Anti tip bracket on stove A & B sidesFBCR M1901.2 5. Insulation certificate missing. A&B sides FBC EC R303.1.1.2 6. Need to Revise Energy Calcs to meet what is installed. A&B sides. FBC [A] 107.4
ROW - FINAL APRON (AFTER POUR) 01/23/2025 APPROVED RGROSS
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/23/2025 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 01/23/2025 APPROVED RGROSS
Note: 1/16/2025 - PREVIOUS INSPECTION NOTES ** 01/16/25 BUILDER NEEDS TO SUBMIT A FINAL SURVEY FOR REVIEW BEFORE THE FIELD SURVEY CAN BE CONDUCTED.
ROW - FINAL INSPECTION 01/23/2025 APPROVED RGROSS
Note: ** BUILDER WILL BE RESPONSIBIL TO REMOVE ALL SAND FROM THE (ROW) SWALE ON RIGHT SIDE AT VACANT BEFORE ROW FINAL IS APPROVED
ROW FIELD SURVEY /GRADING CERTIFICATION 01/16/2025 Disapproved - NO FEE EMADISON
Note: ** 01/16/25 BUILDER NEEDS TO SUBMIT A FINAL SURVEY FOR REVIEW BEFORE THE FIELD SURVEY CAN BE CONDUCTED.
ROW- PRE-APRON (PRE-POUR) 09/23/2024 APPROVED - AS NOTED EMADISON
Note: ** 09/23/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ______________________________________________________________________________________________________________ 9/20/2024 - PREVIOUS INSPECTION NOTES ** 09/20/24 SITE NOT READY FOR INSPECTION ** SEE ATTCHED PHOTOS FROM TODAYS INSPECTIONS __________________________________________________________________________________________________________________ 9/19/2024 - PREVIOUS INSPECTION NOTES ** 09/19/24 CANCELLED BY APPLICANT VIA TEXT MESSAGE FROM ALLEN ( CREATIVE TOUCH CONCRETE ____________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES ** 09/10/24 CANCELED VIA TEXT MESSAGE (904)-347-7837 ___________________________________________________________________________________________________________________ 9/6/2024 - PREVIOUS INSPECTION NOTES ** 09/06/24 INSPECTION CANCELLED VIA TEXT MESSAGE FROM ERIC (CASTAWAY CONSTRUCTION) __________________________________________________________________________________________________________________ 9/4/2024 - PREVIOUS INSPECTION NOTES ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 09/20/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/20/24 SITE NOT READY FOR INSPECTION ** SEE ATTCHED PHOTOS FROM TODAYS INSPECTIONS __________________________________________________________________________________________________________________ 9/19/2024 - PREVIOUS INSPECTION NOTES ** 09/19/24 CANCELLED BY APPLICANT VIA TEXT MESSAGE FROM ALLEN ( CREATIVE TOUCH CONCRETE ____________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES ** 09/10/24 CANCELED VIA TEXT MESSAGE (904)-347-7837 ___________________________________________________________________________________________________________________ 9/6/2024 - PREVIOUS INSPECTION NOTES ** 09/06/24 INSPECTION CANCELLED VIA TEXT MESSAGE FROM ERIC (CASTAWAY CONSTRUCTION) __________________________________________________________________________________________________________________ 9/4/2024 - PREVIOUS INSPECTION NOTES ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 09/19/2024 CANCELLED BY APPLICANT EMADISON
Note: ** 09/19/24 CANCELLED BY APPLICANT VIA TEXT MESSAGE FROM ALLEN ( CREATIVE TOUCH CONCRETE ____________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES ** 09/10/24 CANCELED VIA TEXT MESSAGE (904)-347-7837 ___________________________________________________________________________________________________________________ 9/6/2024 - PREVIOUS INSPECTION NOTES ** 09/06/24 INSPECTION CANCELLED VIA TEXT MESSAGE FROM ERIC (CASTAWAY CONSTRUCTION) __________________________________________________________________________________________________________________ 9/4/2024 - PREVIOUS INSPECTION NOTES ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 09/10/2024 CANCELLED BY APPLICANT EMADISON
Note: ** 09/10/24 CANCELED VIA TEXT MESSAGE (904)-347-7837 ___________________________________________________________________________________________________________________ 9/6/2024 - PREVIOUS INSPECTION NOTES ** 09/06/24 INSPECTION CANCELLED VIA TEXT MESSAGE FROM ERIC (CASTAWAY CONSTRUCTION) __________________________________________________________________________________________________________________ 9/4/2024 - PREVIOUS INSPECTION NOTES ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 09/06/2024 CANCELLED BY APPLICANT EMADISON
Note: ** 09/06/24 INSPECTION CANCELLED VIA TEXT MESSAGE FROM ERIC (CASTAWAY CONSTRUCTION) __________________________________________________________________________________________________________________ 9/4/2024 - PREVIOUS INSPECTION NOTES ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 09/04/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS
ELECTRIC - EARLY POWER 09/04/2024 APPROVED - AS NOTED BTAYLOR
Note: 8/16/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 8/16/2024 6:55:45 AM *** Attic Access was covered over with Ceiling Gyp Board per plans FBC 107.3, (need access for inspection to make sure the attaic access electric is safed off) 9-4-24 1.Emailed FPL at 10:47.
GRAVITY SEWER TEST 08/27/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U-CROSS CONNECTION 08/27/2024 Disapproved -FEE REQUIRED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 8/27/2024 2:21:58 PM *** no irrigation so no cross connection to residence BUT bth water meter oxes full of soils -cant know if there aredbl check valves on meter assembly that protects city water-clean out pits to btm. of meter assembly
U - SEWER TIE IN 08/27/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 08/21/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS
ROW - DRAINAGE 08/19/2024 APPROVED - AS NOTED EMADISON
Note: ** 08/19/24 CORRECTIONS MADE ** BUILDER WILL BE RESPONSIBIL TO REMOVE ALL SAND FROM THE (ROW) SWALE ON RIGHT SIDE AT VACANT BEFORE ROW STORMWATER FINAL IS APPROVED _________________________________________________________________________________________________________________ 8/16/2024 - PREVIOUS INSPECTION NOTES ** 08/16/24 AS NOTED IN PREVIOUS INSPECTIONS ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** FOLLOW UP INSPECTION ON 08/19/24 ____________________________________________________________________________________________________________________ 8/14/2024 - PREVIOUS INSPECTION NOTES ** 08/14/24 AS NOTED IN PREVIOUS INSPECTIONS ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** FOLLOW UP INSPECTION ON 08/16/24 ____________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/14/24 _______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/24 _______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24
ROW - DRAINAGE 08/16/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/16/24 AS NOTED IN PREVIOUS INSPECTIONS ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** FOLLOW UP INSPECTION ON 08/19/24 ____________________________________________________________________________________________________________________ 8/14/2024 - PREVIOUS INSPECTION NOTES ** 08/14/24 AS NOTED IN PREVIOUS INSPECTIONS ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** FOLLOW UP INSPECTION ON 08/16/24 ____________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/14/24 _______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/24 _______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24
ELECTRIC - EARLY POWER 08/16/2024 Disapproved -FEE REQUIRED LMILLER
Note: *** NOTES ADDED BY LMILLER 8/16/2024 6:55:45 AM *** Attic Access was covered over with Ceiling Gyp Board per plans FBC 107.3, (need access for inspection to make sure the attaic access electric is safed off)
ROW - DRAINAGE 08/14/2024 Disapproved - NO FEE EMADISON
Note: ** 08/14/24 AS NOTED IN PREVIOUS INSPECTIONS ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** FOLLOW UP INSPECTION ON 08/16/24 ____________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/14/24 _______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/24 _______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24
ROW - DRAINAGE 08/13/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/13/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/14/24 ____________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/24 _______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24
ROW - DRAINAGE 08/12/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/24 _______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24
ROW - DRAINAGE 08/09/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24
ROW - DRAINAGE 08/07/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24
INSULATION 07/03/2024 APPROVED BTAYLOR
Note: 3/11/2024 - PREVIOUS INSPECTION NOTES 3-11-24 FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) check all 12/15/2023 - PREVIOUS INSPECTION NOTES FRONT DOOR ON BOTH UNITS MISSING.
ALL ROUGH 06/24/2024 APPROVED LMILLER
Note: *** NOTES ADDED BY LMILLER 6/24/2024 1:09:21 PM *** There were notes on prior All-Rough inspections, but the notes did not com through (notes left by the last inspector KS resolved)
WINDOW NAILING 06/24/2024 APPROVED LMILLER
Note: *** NOTES ADDED BY LMILLER 6/24/2024 1:06:45 PM *** prior notes resolved Front entry doors not installed. Window door nailing added.
LATH/BRICK/ WATER BARRIER 03/12/2024 APPROVED AGAETANO
Note: 10/19/2023 - PREVIOUS INSPECTION NOTES 10-19-2023 Front entry doors not installed. Window door nailing added. 03-12-2024 Front entry doors installed.
INSULATION 03/11/2024 Disapproved - NO FEE LMILLER
Note: 3-11-24 FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) check all 12/15/2023 - PREVIOUS INSPECTION NOTES FRONT DOOR ON BOTH UNITS MISSING.
INSULATION 12/15/2023 Disapproved -FEE REQUIRED FWILLIS
Note: FRONT DOOR ON BOTH UNITS MISSING.
FIREWALL FINAL 11/08/2023 APPROVED BTAYLOR
Note: 11/7/2023 - PREVIOUS INSPECTION NOTES 11-7-2023 Please have approved drawings on site for all inspections. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL
FIREWALL FINAL 11/07/2023 Disapproved - NO FEE AGAETANO
Note: 11-7-2023 Please have approved drawings on site for all inspections. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL
FIREWALL DRYWALL NAILING 11/02/2023 APPROVED BTAYLOR
Note: 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: ** Firewall drywall on both sides of the separation wall is not secures as required. (7"OC). ** Unit B (right side) has drywall that is installed backwards. Inspector Notes from Inspection 2420 Front doors have not been installed. Boot flashing on service mast not installed per spec Entire length of seam on range vents in both units need to be sealed Need dumpster on site 10/17/2023 - PREVIOUS INSPECTION NOTES 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 1. UFER ground not visible. High grass is obstructing inspection. 2. Left unit garage wall not 24" oc. 3. Both units entry doors not installed. Window door inspection will be added. 4. Left unit kitchen vent not sealed at roof deck. 5. Please remove high grass around home for inspection. 6. No head test. Inspection stopped. Please be ready for inspections. 10-17-2023 1. Right side unit dryer vent not extended through the roof completely and is not sealed. 2. Dryer vent shield plate needed at top plate. 3 Both entry doors not installed. Check at window nailing.
FIREWALL DRYWALL NAILING 11/01/2023 Disapproved -FEE REQUIRED RSIMS
Note: 11/1/23: ** Firewall drywall on both sides of the separation wall is not secures as required. (7"OC). ** Unit B (right side) has drywall that is installed backwards. Inspector Notes from Inspection 2420 Front doors have not been installed. Boot flashing on service mast not installed per spec Entire length of seam on range vents in both units need to be sealed Need dumpster on site 10/17/2023 - PREVIOUS INSPECTION NOTES 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 1. UFER ground not visible. High grass is obstructing inspection. 2. Left unit garage wall not 24" oc. 3. Both units entry doors not installed. Window door inspection will be added. 4. Left unit kitchen vent not sealed at roof deck. 5. Please remove high grass around home for inspection. 6. No head test. Inspection stopped. Please be ready for inspections. 10-17-2023 1. Right side unit dryer vent not extended through the roof completely and is not sealed. 2. Dryer vent shield plate needed at top plate. 3 Both entry doors not installed. Check at window nailing.
ALL ROUGH 10/25/2023 APPROVED - AS NOTED KSANDOE
Note: Front doors have not been installed. Boot flashing on service mast not installed per spec Entire length of seam on range vents in both units need to be sealed Need dumpster on site 10/17/2023 - PREVIOUS INSPECTION NOTES 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 1. UFER ground not visible. High grass is obstructing inspection. 2. Left unit garage wall not 24" oc. 3. Both units entry doors not installed. Window door inspection will be added. 4. Left unit kitchen vent not sealed at roof deck. 5. Please remove high grass around home for inspection. 6. No head test. Inspection stopped. Please be ready for inspections. 10-17-2023 1. Right side unit dryer vent not extended through the roof completely and is not sealed. 2. Dryer vent shield plate needed at top plate. 3 Both entry doors not installed. Check at window nailing.
LATH/BRICK/ WATER BARRIER 10/19/2023 PARTIALLY APPROVED AGAETANO
Note: 10-19-2023 Front entry doors not installed. Window door nailing added.
ALL ROUGH 10/17/2023 Disapproved - NO FEE AGAETANO
Note: 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 1. UFER ground not visible. High grass is obstructing inspection. 2. Left unit garage wall not 24" oc. 3. Both units entry doors not installed. Window door inspection will be added. 4. Left unit kitchen vent not sealed at roof deck. 5. Please remove high grass around home for inspection. 6. No head test. Inspection stopped. Please be ready for inspections. 10-17-2023 1. Right side unit dryer vent not extended through the roof completely and is not sealed. 2. Dryer vent shield plate needed at top plate. 3 Both entry doors not installed. Check at window nailing.
ALL ROUGH 09/20/2023 Disapproved - NO FEE AGAETANO
Note: 09-20-2023 1. UFER ground not visible. High grass is obstructing inspection. 2. Left unit garage wall not 24" oc. 3. Both units entry doors not installed. Window door inspection will be added. 4. Left unit kitchen vent not sealed at roof deck. 5. Please remove high grass around home for inspection. 6. No head test. Inspection stopped. Please be ready for inspections.
WALL SHEATHING 09/19/2023 APPROVED BTAYLOR
Note: 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 4/18/2023 - PREVIOUS INSPECTION NOTES 04/18/2023- Left side unitTruss A03 missing engineering,Garage double girder missing strap,Truss repair at enry do ot match new engineer drawings Right side unit-Truss repair at enry do ot match new engineer drawings 4/12/2023 - PREVIOUS INSPECTION NOTES 4/11/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site 04-12-2023 Engineering packet does not match truss layout. Please resubmit to the building department and have on site. Please remove trash prior to next inspection. 04-25-2023 1. Left unit A07 & A08 missed members. 2. Right unit AO8 missed unit. Check at next inspection. 04-27-2023 1. Left unit A07 & A08 missed members. 2. Wall sheathing not complete.
WALL SHEATHING 04/27/2023 Disapproved - NO FEE AGAETANO
Note: Inspector Notes from Inspection 2460 4/18/2023 - PREVIOUS INSPECTION NOTES 04/18/2023- Left side unitTruss A03 missing engineering,Garage double girder missing strap,Truss repair at enry do ot match new engineer drawings Right side unit-Truss repair at enry do ot match new engineer drawings 4/12/2023 - PREVIOUS INSPECTION NOTES 4/11/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site 04-12-2023 Engineering packet does not match truss layout. Please resubmit to the building department and have on site. Please remove trash prior to next inspection. 04-25-2023 1. Left unit A07 & A08 missed members. 2. Right unit AO8 missed unit. Check at next inspection. 04-27-2023 1. Left unit A07 & A08 missed members. 2. Wall sheathing not complete.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/25/2023 APPROVED - AS NOTED AGAETANO
Note: 4/18/2023 - PREVIOUS INSPECTION NOTES 04/18/2023- Left side unitTruss A03 missing engineering,Garage double girder missing strap,Truss repair at enry do ot match new engineer drawings Right side unit-Truss repair at enry do ot match new engineer drawings 4/12/2023 - PREVIOUS INSPECTION NOTES 4/11/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site 04-12-2023 Engineering packet does not match truss layout. Please resubmit to the building department and have on site. Please remove trash prior to next inspection. 04-25-2023 1. Left unit A07 & A08 missed members. 2. Right unit AO8 missed unit. Check at next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/18/2023 Disapproved - NO FEE TSTAUFFACHER
Note: 04/18/2023- Left side unitTruss A03 missing engineering,Garage double girder missing strap,Truss repair at enry do ot match new engineer drawings Right side unit-Truss repair at enry do ot match new engineer drawings 4/12/2023 - PREVIOUS INSPECTION NOTES 4/11/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site 04-12-2023 Engineering packet does not match truss layout. Please resubmit to the building department and have on site. Please remove trash prior to next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/12/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 4/11/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site 04-12-2023 Engineering packet does not match truss layout. Please resubmit to the building department and have on site. Please remove trash prior to next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/11/2023 Disapproved -FEE REQUIRED AGAETANO
Note: New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/24/2023 CANCELLED BY APPLICANT WEB
Note: 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site.
ROOF VALLEY & METAL 03/21/2023 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/20/2023 CANCELLED BY APPLICANT AGAETANO
Note: 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/15/2023 Disapproved -FEE REQUIRED TSTAUFFACHER
Note: 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/08/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site.
FOUND SURVEY APPROVED (OFFICE) 02/15/2023 APPROVED JGONZALEZ
Note: Released original by alisha mobley on 2/14/2023 and tim baker on 02/15/2023
ROW - DRAINAGE 12/14/2022 APPROVED EMADISON
Note: ** 12/14/22 CORRECTIONS HAVE BEEN MADE ** IT IS THE RESPONSIBILITY OF THE BUILDER TO MAINTAIN THE SWALE ON A DAILY BASIS 12/12/2022 - PREVIOUS INSPECTION NOTES **12/12/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/12/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/12/22 ***SEE ATTACHED PHOTOS*** 12/9/2022 - PREVIOUS INSPECTION NOTES **12/09/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/12/22 ***SEE ATTACHED PHOTOS*** 12/8/2022 - PREVIOUS INSPECTION NOTES **12/08/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/09/22 ***SEE ATTACHED PHOTOS*** 12/7/2022 - PREVIOUS INSPECTION NOTES 12/07/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/8/22 _____________________________________________________________________________________________________________________ 12/6/2022 - PREVIOUS INSPECTION NOTES 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/7/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS***
ROW - DRAINAGE 12/12/2022 Disapproved -FEE REQUIRED EMADISON
Note: **12/12/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/12/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/12/22 ***SEE ATTACHED PHOTOS*** 12/9/2022 - PREVIOUS INSPECTION NOTES **12/09/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/12/22 ***SEE ATTACHED PHOTOS*** 12/8/2022 - PREVIOUS INSPECTION NOTES **12/08/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/09/22 ***SEE ATTACHED PHOTOS*** 12/7/2022 - PREVIOUS INSPECTION NOTES 12/07/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/8/22 _____________________________________________________________________________________________________________________ 12/6/2022 - PREVIOUS INSPECTION NOTES 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/7/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS***
ROW - DRAINAGE 12/09/2022 Disapproved -FEE REQUIRED EMADISON
Note: **12/09/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/12/22 ***SEE ATTACHED PHOTOS*** 12/8/2022 - PREVIOUS INSPECTION NOTES **12/08/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/09/22 ***SEE ATTACHED PHOTOS*** 12/7/2022 - PREVIOUS INSPECTION NOTES 12/07/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/8/22 _____________________________________________________________________________________________________________________ 12/6/2022 - PREVIOUS INSPECTION NOTES 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/7/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS***
ROW - DRAINAGE 12/08/2022 Disapproved -FEE REQUIRED EMADISON
Note: **12/08/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/09/22 ***SEE ATTACHED PHOTOS*** 12/7/2022 - PREVIOUS INSPECTION NOTES 12/07/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/8/22 _____________________________________________________________________________________________________________________ 12/6/2022 - PREVIOUS INSPECTION NOTES 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/7/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS***
ROW - DRAINAGE 12/07/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 12/07/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/8/22 _____________________________________________________________________________________________________________________ 12/6/2022 - PREVIOUS INSPECTION NOTES 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/7/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS***
ROW - DRAINAGE 12/06/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS***
ROW - DRAINAGE 12/05/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS***
ROW - DRAINAGE 12/02/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS***
ROW - DRAINAGE 11/28/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS***
TIE BEAM / LINTEL 10/07/2022 APPROVED AGAETANO
Note: 10/6/2022 - PREVIOUS INSPECTION NOTES 10-6-2022 Contractor not ready. Workers on site.
TIE BEAM / LINTEL 10/06/2022 Disapproved -FEE REQUIRED AGAETANO
Note: 10-6-2022 Contractor not ready. Workers on site.
MONOLITHIC SLAB 07/22/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 07/20/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Not ready, 1:30 pm just starting
PLUMBING 1ST ROUGH UNDERGROUND 07/18/2022 Disapproved -FEE REQUIRED MGIBSON
Note: Not ready, 1:30 pm just starting
WATER METER INSTALLATION REQUEST 05/18/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 02/05/2025 02/05/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SUBMIT FBC 2023 BLOWER DOOR TEST
MECH COMPLETE 01/30/2025 01/31/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 04/04/2023 04/10/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 02/14/2023 02/15/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/14/2023 02/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/14/2023 02/14/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 04/20/2022 04/20/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 04/20/2022 04/21/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 04/20/2022 04/21/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SW1 COMPLETE 04/20/2022 04/27/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
SWALE COMPLETE 03/14/2022 05/24/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 03/11/2022 03/15/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Design pressure of garage door with product approval FL 14170.9 is less than the required design pressure shown on sheet 1 of 9. Provide FL number to comply with the required design pressure per F.S. 553.842.
CUSVC COMPLETE 03/11/2022 03/16/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 03/11/2022 03/14/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs
ENGIN1 COMPLETE 03/11/2022 03/14/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 03/11/2022 03/15/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/11/2022 03/17/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SW1 HOLD 03/11/2022 03/15/2022
Note: Held By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM the site plan must show date and stamp and seal also must show center of road elevations i believe the copy was just a mistake
ZON HOLD 03/11/2022 03/14/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM please rescan site plan all legal information was cut off when uploaded

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 01/31/2025
PLAN REVIEW - REVISION ¤32.50 01/31/2025
REINSPECTION RESIDENTIAL ¤40.00 01/31/2025
REINSPECTION RESIDENTIAL ¤40.00 01/31/2025
REINSPECTION RESIDENTIAL ¤40.00 01/31/2025
REINSPECTION RESIDENTIAL ¤40.00 01/31/2025
REINSPECTION RESIDENTIAL ¤40.00 01/31/2025
REINSPECTION RESIDENTIAL ¤40.00 01/31/2025
REINSPECTION RESIDENTIAL ¤40.00 01/31/2025
REINSPECTION RESIDENTIAL ¤40.00 01/31/2025
REINSPECTION RESIDENTIAL ¤40.00 01/31/2025
CONTRACTOR CHANGE ¤20.00 01/31/2025
CONTRACTOR CHANGE ¤20.00 01/31/2025
CONTRACTOR CHANGE ¤20.00 01/31/2025
CONTRACTOR CHANGE ¤40.00 01/31/2025
CONTRACTOR CHANGE ¤80.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
SW ENG - INSPECTION 20 ¤20.00 01/31/2025
REINSPECTION FEE ¤40.00 01/31/2025
REINSPECTION FEE ¤40.00 01/31/2025
SW ENG REINSPECTION 30 ¤30.00 01/31/2025
SW ENG REINSPECTION 30 ¤30.00 01/31/2025
SW ENG REINSPECTION 30 ¤30.00 01/31/2025
SW ENG - REVIEW 20 ¤20.00 05/12/2022
SW ENG RES REVIEW 200 ¤200.00 05/12/2022
3% TRANS IMPACT FEE CREDIT (¤82.14) 05/12/2022
SEWER CREDIT (¤1,147.00) 05/12/2022
SEWER INSPECTION ¤25.00 05/12/2022
SEWER CAPITAL FACILITY ¤9,879.52 05/12/2022
WATER CAPITAL FACILITY FEE ¤7,253.00 05/12/2022
SITE PLAN 30 ¤30.00 05/12/2022
SURCHARGE FS 533.721 ¤12.45 05/12/2022
SURCHARGE - FS 468.631 ¤18.68 05/12/2022
SW ENG - FOUNDATION SURVEY ¤20.00 05/12/2022
WATER- TURN ON ¤50.00 05/12/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/12/2022
INSPECTION - RESIDENTIAL ¤899.25 05/12/2022
PLAN REVIEW - RESIDENTIAL ¤255.06 05/12/2022
SW ENG INSPECTION 80 ¤80.00 05/12/2022
SW ENG PRE APRON ¤30.00 05/12/2022
3% FIRE IMPACT FEE CREDIT (¤23.32) 05/12/2022
IMPACT FEE FIRE ¤777.30 05/12/2022
IMPACT FEE PARKS ¤2,910.26 05/12/2022
IMPACT FEE SCHOOL ¤7,200.00 05/12/2022
IMPACT FEE TRANSPORTATION ¤2,738.00 05/12/2022
WATER -IRRIGATION INSPECTION ¤50.00 05/12/2022
3% PARKS IMPACT FEE CREDIT (¤87.31) 05/12/2022
CONNECTION FEES ¤2,155.76 05/12/2022
Fees Total Due: ¤0.00 Total Paid: ¤34,389.51