Permit #2022030683
Permit Details
Status: COED
| Parcel Id: 07-11-31-7016-00050-0100 |
| CONDITIONED SPACE: 1280 sqft |
| GARAGE: 250 sqft |
| CONDITIONED SPACE: 1280 sqft |
| GARAGE: 250 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| Total Square Footage: 3420 sqft |
| Block: 00050 |
| Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE |
| Job Phone: 904-347-7837 |
| Location Address: 19 COLUMBIA LN |
| Type: DU - DUPLEX |
| Issue Date: 05/12/2022 |
| NOC: RECORDED |
| Applicant name: ERIC PAUL PANNONE |
| Owner: WOLF JOHN & MARIA H&W |
|
Address 8 SUNRISE CIRCLE PALM COAST, FL 32137 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤327,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
CASTAWAY CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
30 FERNON LANE PALM COAST, FL 32137 |
CBC1266321 (Exp: 08/31/2026) | 904-347-7837 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
SHAWN R RAMNARINE SINGH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4 SEASIDE CT PALM COAST, FL 32164 |
CAC1818766 (Exp: 08/31/2026) | 306-302-2179 |
RYAN PENNINGTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3075 WATEROAK ROAD BUNNELL, FL 32110 |
ER13016228 (Exp: 08/31/2026) | 386-481-3357 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 02/04/2025 | APPROVED | LFITZGERALD |
| Note: 8/27/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 8/27/2024 2:21:58 PM *** no irrigation so no cross connection to residence BUT bth water meter oxes full of soils -cant know if there aredbl check valves on meter assembly that protects city water-clean out pits to btm. of meter assembly | |||
| BLD - BUILDING FINAL | 01/31/2025 | FINAL APPROVED | HCAMACHO |
| Note: 1/24/2025 - PREVIOUS INSPECTION NOTES 1. Hose bibs missing Anti - Siphon valves.A&B Sides FBCR P2902.4.3 2. Garage door bucks missing bolt that was removed when door was installed on top. A&B sides 4. Anti tip bracket on stove A & B sidesFBCR M1901.2 5. Insulation certificate missing. A&B sides FBC EC R303.1.1.2 6. Need to Revise Energy Calcs to meet what is installed. A&B sides. FBC [A] 107.4 | |||
| U -UTILITY RESIDENTIAL FINAL | 01/31/2025 | FINAL APPROVED | LFITZGERALD |
| Note: 1/24/2025 - PREVIOUS INSPECTION NOTES lower sewer clean niuts/remove soils from water meter pit | |||
| U -UTILITY RESIDENTIAL FINAL | 01/24/2025 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: lower sewer clean niuts/remove soils from water meter pit | |||
| BLD - BUILDING FINAL | 01/24/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Hose bibs missing Anti - Siphon valves.A&B Sides FBCR P2902.4.3 2. Garage door bucks missing bolt that was removed when door was installed on top. A&B sides 4. Anti tip bracket on stove A & B sidesFBCR M1901.2 5. Insulation certificate missing. A&B sides FBC EC R303.1.1.2 6. Need to Revise Energy Calcs to meet what is installed. A&B sides. FBC [A] 107.4 | |||
| ROW - FINAL APRON (AFTER POUR) | 01/23/2025 | APPROVED | RGROSS |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/23/2025 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/23/2025 | APPROVED | RGROSS |
| Note: 1/16/2025 - PREVIOUS INSPECTION NOTES ** 01/16/25 BUILDER NEEDS TO SUBMIT A FINAL SURVEY FOR REVIEW BEFORE THE FIELD SURVEY CAN BE CONDUCTED. | |||
| ROW - FINAL INSPECTION | 01/23/2025 | APPROVED | RGROSS |
| Note: ** BUILDER WILL BE RESPONSIBIL TO REMOVE ALL SAND FROM THE (ROW) SWALE ON RIGHT SIDE AT VACANT BEFORE ROW FINAL IS APPROVED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/16/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/16/25 BUILDER NEEDS TO SUBMIT A FINAL SURVEY FOR REVIEW BEFORE THE FIELD SURVEY CAN BE CONDUCTED. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/23/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/23/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ______________________________________________________________________________________________________________ 9/20/2024 - PREVIOUS INSPECTION NOTES ** 09/20/24 SITE NOT READY FOR INSPECTION ** SEE ATTCHED PHOTOS FROM TODAYS INSPECTIONS __________________________________________________________________________________________________________________ 9/19/2024 - PREVIOUS INSPECTION NOTES ** 09/19/24 CANCELLED BY APPLICANT VIA TEXT MESSAGE FROM ALLEN ( CREATIVE TOUCH CONCRETE ____________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES ** 09/10/24 CANCELED VIA TEXT MESSAGE (904)-347-7837 ___________________________________________________________________________________________________________________ 9/6/2024 - PREVIOUS INSPECTION NOTES ** 09/06/24 INSPECTION CANCELLED VIA TEXT MESSAGE FROM ERIC (CASTAWAY CONSTRUCTION) __________________________________________________________________________________________________________________ 9/4/2024 - PREVIOUS INSPECTION NOTES ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 09/20/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/20/24 SITE NOT READY FOR INSPECTION ** SEE ATTCHED PHOTOS FROM TODAYS INSPECTIONS __________________________________________________________________________________________________________________ 9/19/2024 - PREVIOUS INSPECTION NOTES ** 09/19/24 CANCELLED BY APPLICANT VIA TEXT MESSAGE FROM ALLEN ( CREATIVE TOUCH CONCRETE ____________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES ** 09/10/24 CANCELED VIA TEXT MESSAGE (904)-347-7837 ___________________________________________________________________________________________________________________ 9/6/2024 - PREVIOUS INSPECTION NOTES ** 09/06/24 INSPECTION CANCELLED VIA TEXT MESSAGE FROM ERIC (CASTAWAY CONSTRUCTION) __________________________________________________________________________________________________________________ 9/4/2024 - PREVIOUS INSPECTION NOTES ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 09/19/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 09/19/24 CANCELLED BY APPLICANT VIA TEXT MESSAGE FROM ALLEN ( CREATIVE TOUCH CONCRETE ____________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES ** 09/10/24 CANCELED VIA TEXT MESSAGE (904)-347-7837 ___________________________________________________________________________________________________________________ 9/6/2024 - PREVIOUS INSPECTION NOTES ** 09/06/24 INSPECTION CANCELLED VIA TEXT MESSAGE FROM ERIC (CASTAWAY CONSTRUCTION) __________________________________________________________________________________________________________________ 9/4/2024 - PREVIOUS INSPECTION NOTES ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 09/10/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 09/10/24 CANCELED VIA TEXT MESSAGE (904)-347-7837 ___________________________________________________________________________________________________________________ 9/6/2024 - PREVIOUS INSPECTION NOTES ** 09/06/24 INSPECTION CANCELLED VIA TEXT MESSAGE FROM ERIC (CASTAWAY CONSTRUCTION) __________________________________________________________________________________________________________________ 9/4/2024 - PREVIOUS INSPECTION NOTES ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 09/06/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 09/06/24 INSPECTION CANCELLED VIA TEXT MESSAGE FROM ERIC (CASTAWAY CONSTRUCTION) __________________________________________________________________________________________________________________ 9/4/2024 - PREVIOUS INSPECTION NOTES ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 09/04/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/04/24 FORM BOARD RIGHT SIDE DRIVEWAY NEEDS TO BE RELOCATED SO CENTER OF CULVERT WILL BE 8FT (96 INCHES) FROM EDGE OF ROADWAY. ** BOTH THE LEFT AND RIGHT SIDE DRIVEAYS NEED TO SLOPE BOTH SIDE OF CULVERT TO A 4:1 SLOPE ON EITHER SIDE OF CULVERT CURRENTLY TOO STEEP NEED REVIEW DRAWING 300.E RESIDENTIAL CULVERT DETAIL NOTE HOW THIS INSPECTOR SHAVED AREA TO BE ADJUSTED. ** DRIVEWAY POUR AREA ABOVE THE RIGHT OF WAY (ROW) NEEDS TO HAVE A MINIMU OF 4 INCHES OF CONCRETE WITHIN THE POUR AREA NOTE STRING LINES ** NEED TO CHIP AWAY ALL OVER POURED CONCRETE AT GARAGE OPENING AND SIDEWALK POUR AREAS TO ENSURE THERE IS A MINIMUM OF 4 INCHES OF CONCRETE IN POUR AREA _________________________________________________________________________________________________________________ 8/21/2024 - PREVIOUS INSPECTION NOTES ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS | |||
| ELECTRIC - EARLY POWER | 09/04/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 8/16/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 8/16/2024 6:55:45 AM *** Attic Access was covered over with Ceiling Gyp Board per plans FBC 107.3, (need access for inspection to make sure the attaic access electric is safed off) 9-4-24 1.Emailed FPL at 10:47. | |||
| GRAVITY SEWER TEST | 08/27/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U-CROSS CONNECTION | 08/27/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 8/27/2024 2:21:58 PM *** no irrigation so no cross connection to residence BUT bth water meter oxes full of soils -cant know if there aredbl check valves on meter assembly that protects city water-clean out pits to btm. of meter assembly | |||
| U - SEWER TIE IN | 08/27/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 08/21/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/21/24 CULVERT PIPE IS OUT OF TOLERANCE ON LEFT SIDE WATER FLOWS FROM THE LEFT TO RIGHT SIDE ENSURE YOUR RIGHT SIDE CULVERT IS LOWER THAN THE LEFT SIDE TO ENSURE THE FLOW OF WATER ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ** MITERED ENDS ARE NOT FORMED UP CORRECTLY IN ACCORDANCE WITH DRAWING # 300.E RESIDENTIAL CULVERT DRIVEWAY DETAIL (SECTION A-A) AND PLAN VIEW ** NEED TO DIG OUT FOOTERS UNDER MITERED CULVERT ENDS ** NEED FACE BOARD ACROSS APRON TO ENSURE CENTER OF CULVERT IS 8 FEET FROM EDGE OF ROAD ** REBAR IS REQUIRED FOR FOOTERS AT MITERED ENDS OF CULVERTS ** DRIVEWAY AREA ABOVE THE ROW NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE NOTE STRINGLINE LEFT IN PLACE. ** REQUIRED TO CHIP OVER POURED CONCRETE AT BOTH GARAGE OPENINGS 4 INCHES OF CONCRETE REQUIRED ** SEE ATTACHED PHOTOS | |||
| ROW - DRAINAGE | 08/19/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/19/24 CORRECTIONS MADE ** BUILDER WILL BE RESPONSIBIL TO REMOVE ALL SAND FROM THE (ROW) SWALE ON RIGHT SIDE AT VACANT BEFORE ROW STORMWATER FINAL IS APPROVED _________________________________________________________________________________________________________________ 8/16/2024 - PREVIOUS INSPECTION NOTES ** 08/16/24 AS NOTED IN PREVIOUS INSPECTIONS ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** FOLLOW UP INSPECTION ON 08/19/24 ____________________________________________________________________________________________________________________ 8/14/2024 - PREVIOUS INSPECTION NOTES ** 08/14/24 AS NOTED IN PREVIOUS INSPECTIONS ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** FOLLOW UP INSPECTION ON 08/16/24 ____________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/14/24 _______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/24 _______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24 | |||
| ROW - DRAINAGE | 08/16/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/16/24 AS NOTED IN PREVIOUS INSPECTIONS ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** FOLLOW UP INSPECTION ON 08/19/24 ____________________________________________________________________________________________________________________ 8/14/2024 - PREVIOUS INSPECTION NOTES ** 08/14/24 AS NOTED IN PREVIOUS INSPECTIONS ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** FOLLOW UP INSPECTION ON 08/16/24 ____________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/14/24 _______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/24 _______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24 | |||
| ELECTRIC - EARLY POWER | 08/16/2024 | Disapproved -FEE REQUIRED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 8/16/2024 6:55:45 AM *** Attic Access was covered over with Ceiling Gyp Board per plans FBC 107.3, (need access for inspection to make sure the attaic access electric is safed off) | |||
| ROW - DRAINAGE | 08/14/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 08/14/24 AS NOTED IN PREVIOUS INSPECTIONS ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** FOLLOW UP INSPECTION ON 08/16/24 ____________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/14/24 _______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/24 _______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24 | |||
| ROW - DRAINAGE | 08/13/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/13/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/14/24 ____________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDER IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/24 _______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24 | |||
| ROW - DRAINAGE | 08/12/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/24 _______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24 | |||
| ROW - DRAINAGE | 08/09/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/09/24 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND INDICATED IN PREVIOUS INSPECTION THE INSPECTION PRIORITY STATUS WILL NOW BE CHANGED TO A PRIORITY 1 UNTIL CORRECTIONS HAVE BEEN MADE BUILDER WILL NOT BE ABLE TO RESULT ANY OTHER INSPECTIONS ** BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/12/24 ______________________________________________________________________________________________________________________ 8/7/2024 - PREVIOUS INSPECTION NOTES ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24 | |||
| ROW - DRAINAGE | 08/07/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/07/24 BUILDE IS REQUIRED TO REMOVE THE ERODED SEDIMENT AND DOWNED SILT FENCE FROM THE ROAD WAY IMMEDIATELY AS THIS IS CREATING A HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST AS WELL AS HAVING A NEGATIVE IMPACT ON THE ROAD. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/09/24 | |||
| INSULATION | 07/03/2024 | APPROVED | BTAYLOR |
| Note: 3/11/2024 - PREVIOUS INSPECTION NOTES 3-11-24 FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) check all 12/15/2023 - PREVIOUS INSPECTION NOTES FRONT DOOR ON BOTH UNITS MISSING. | |||
| ALL ROUGH | 06/24/2024 | APPROVED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 6/24/2024 1:09:21 PM *** There were notes on prior All-Rough inspections, but the notes did not com through (notes left by the last inspector KS resolved) | |||
| WINDOW NAILING | 06/24/2024 | APPROVED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 6/24/2024 1:06:45 PM *** prior notes resolved Front entry doors not installed. Window door nailing added. | |||
| LATH/BRICK/ WATER BARRIER | 03/12/2024 | APPROVED | AGAETANO |
| Note: 10/19/2023 - PREVIOUS INSPECTION NOTES 10-19-2023 Front entry doors not installed. Window door nailing added. 03-12-2024 Front entry doors installed. | |||
| INSULATION | 03/11/2024 | Disapproved - NO FEE | LMILLER |
| Note: 3-11-24 FIREBLOCKING R302.11 (4) PIPES, DUCTS, CABLES, AND WIRES AT CEILING AND FLOOR LEVEL (WITH APPROVED MATERIAL) check all 12/15/2023 - PREVIOUS INSPECTION NOTES FRONT DOOR ON BOTH UNITS MISSING. | |||
| INSULATION | 12/15/2023 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: FRONT DOOR ON BOTH UNITS MISSING. | |||
| FIREWALL FINAL | 11/08/2023 | APPROVED | BTAYLOR |
| Note: 11/7/2023 - PREVIOUS INSPECTION NOTES 11-7-2023 Please have approved drawings on site for all inspections. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL | |||
| FIREWALL FINAL | 11/07/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 11-7-2023 Please have approved drawings on site for all inspections. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL | |||
| FIREWALL DRYWALL NAILING | 11/02/2023 | APPROVED | BTAYLOR |
| Note: 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23: ** Firewall drywall on both sides of the separation wall is not secures as required. (7"OC). ** Unit B (right side) has drywall that is installed backwards. Inspector Notes from Inspection 2420 Front doors have not been installed. Boot flashing on service mast not installed per spec Entire length of seam on range vents in both units need to be sealed Need dumpster on site 10/17/2023 - PREVIOUS INSPECTION NOTES 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 1. UFER ground not visible. High grass is obstructing inspection. 2. Left unit garage wall not 24" oc. 3. Both units entry doors not installed. Window door inspection will be added. 4. Left unit kitchen vent not sealed at roof deck. 5. Please remove high grass around home for inspection. 6. No head test. Inspection stopped. Please be ready for inspections. 10-17-2023 1. Right side unit dryer vent not extended through the roof completely and is not sealed. 2. Dryer vent shield plate needed at top plate. 3 Both entry doors not installed. Check at window nailing. | |||
| FIREWALL DRYWALL NAILING | 11/01/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/1/23: ** Firewall drywall on both sides of the separation wall is not secures as required. (7"OC). ** Unit B (right side) has drywall that is installed backwards. Inspector Notes from Inspection 2420 Front doors have not been installed. Boot flashing on service mast not installed per spec Entire length of seam on range vents in both units need to be sealed Need dumpster on site 10/17/2023 - PREVIOUS INSPECTION NOTES 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 1. UFER ground not visible. High grass is obstructing inspection. 2. Left unit garage wall not 24" oc. 3. Both units entry doors not installed. Window door inspection will be added. 4. Left unit kitchen vent not sealed at roof deck. 5. Please remove high grass around home for inspection. 6. No head test. Inspection stopped. Please be ready for inspections. 10-17-2023 1. Right side unit dryer vent not extended through the roof completely and is not sealed. 2. Dryer vent shield plate needed at top plate. 3 Both entry doors not installed. Check at window nailing. | |||
| ALL ROUGH | 10/25/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Front doors have not been installed. Boot flashing on service mast not installed per spec Entire length of seam on range vents in both units need to be sealed Need dumpster on site 10/17/2023 - PREVIOUS INSPECTION NOTES 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 1. UFER ground not visible. High grass is obstructing inspection. 2. Left unit garage wall not 24" oc. 3. Both units entry doors not installed. Window door inspection will be added. 4. Left unit kitchen vent not sealed at roof deck. 5. Please remove high grass around home for inspection. 6. No head test. Inspection stopped. Please be ready for inspections. 10-17-2023 1. Right side unit dryer vent not extended through the roof completely and is not sealed. 2. Dryer vent shield plate needed at top plate. 3 Both entry doors not installed. Check at window nailing. | |||
| LATH/BRICK/ WATER BARRIER | 10/19/2023 | PARTIALLY APPROVED | AGAETANO |
| Note: 10-19-2023 Front entry doors not installed. Window door nailing added. | |||
| ALL ROUGH | 10/17/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 1. UFER ground not visible. High grass is obstructing inspection. 2. Left unit garage wall not 24" oc. 3. Both units entry doors not installed. Window door inspection will be added. 4. Left unit kitchen vent not sealed at roof deck. 5. Please remove high grass around home for inspection. 6. No head test. Inspection stopped. Please be ready for inspections. 10-17-2023 1. Right side unit dryer vent not extended through the roof completely and is not sealed. 2. Dryer vent shield plate needed at top plate. 3 Both entry doors not installed. Check at window nailing. | |||
| ALL ROUGH | 09/20/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 09-20-2023 1. UFER ground not visible. High grass is obstructing inspection. 2. Left unit garage wall not 24" oc. 3. Both units entry doors not installed. Window door inspection will be added. 4. Left unit kitchen vent not sealed at roof deck. 5. Please remove high grass around home for inspection. 6. No head test. Inspection stopped. Please be ready for inspections. | |||
| WALL SHEATHING | 09/19/2023 | APPROVED | BTAYLOR |
| Note: 4/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 4/18/2023 - PREVIOUS INSPECTION NOTES 04/18/2023- Left side unitTruss A03 missing engineering,Garage double girder missing strap,Truss repair at enry do ot match new engineer drawings Right side unit-Truss repair at enry do ot match new engineer drawings 4/12/2023 - PREVIOUS INSPECTION NOTES 4/11/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site 04-12-2023 Engineering packet does not match truss layout. Please resubmit to the building department and have on site. Please remove trash prior to next inspection. 04-25-2023 1. Left unit A07 & A08 missed members. 2. Right unit AO8 missed unit. Check at next inspection. 04-27-2023 1. Left unit A07 & A08 missed members. 2. Wall sheathing not complete. | |||
| WALL SHEATHING | 04/27/2023 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2460 4/18/2023 - PREVIOUS INSPECTION NOTES 04/18/2023- Left side unitTruss A03 missing engineering,Garage double girder missing strap,Truss repair at enry do ot match new engineer drawings Right side unit-Truss repair at enry do ot match new engineer drawings 4/12/2023 - PREVIOUS INSPECTION NOTES 4/11/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site 04-12-2023 Engineering packet does not match truss layout. Please resubmit to the building department and have on site. Please remove trash prior to next inspection. 04-25-2023 1. Left unit A07 & A08 missed members. 2. Right unit AO8 missed unit. Check at next inspection. 04-27-2023 1. Left unit A07 & A08 missed members. 2. Wall sheathing not complete. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/25/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 4/18/2023 - PREVIOUS INSPECTION NOTES 04/18/2023- Left side unitTruss A03 missing engineering,Garage double girder missing strap,Truss repair at enry do ot match new engineer drawings Right side unit-Truss repair at enry do ot match new engineer drawings 4/12/2023 - PREVIOUS INSPECTION NOTES 4/11/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site 04-12-2023 Engineering packet does not match truss layout. Please resubmit to the building department and have on site. Please remove trash prior to next inspection. 04-25-2023 1. Left unit A07 & A08 missed members. 2. Right unit AO8 missed unit. Check at next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/18/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: 04/18/2023- Left side unitTruss A03 missing engineering,Garage double girder missing strap,Truss repair at enry do ot match new engineer drawings Right side unit-Truss repair at enry do ot match new engineer drawings 4/12/2023 - PREVIOUS INSPECTION NOTES 4/11/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site 04-12-2023 Engineering packet does not match truss layout. Please resubmit to the building department and have on site. Please remove trash prior to next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/12/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 4/11/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site 04-12-2023 Engineering packet does not match truss layout. Please resubmit to the building department and have on site. Please remove trash prior to next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/11/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: New inspection due to canceled inspection 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. 04-11-2023 Engineering packet not on site | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/24/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 3/20/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. | |||
| ROOF VALLEY & METAL | 03/21/2023 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/20/2023 | CANCELLED BY APPLICANT | AGAETANO |
| Note: 3/15/2023 - PREVIOUS INSPECTION NOTES 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/15/2023 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: 03/15/2023-inspection not done Truss engineering not provided Must provide engineer letter for cut trusses at entryway 3/8/2023 - PREVIOUS INSPECTION NOTES 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/08/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 03-08-2023 1. Engineering packet not on site. 2. Please clean site prior to next inspection. No dumpster on site. | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/15/2023 | APPROVED | JGONZALEZ |
| Note: Released original by alisha mobley on 2/14/2023 and tim baker on 02/15/2023 | |||
| ROW - DRAINAGE | 12/14/2022 | APPROVED | EMADISON |
| Note: ** 12/14/22 CORRECTIONS HAVE BEEN MADE ** IT IS THE RESPONSIBILITY OF THE BUILDER TO MAINTAIN THE SWALE ON A DAILY BASIS 12/12/2022 - PREVIOUS INSPECTION NOTES **12/12/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/12/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/12/22 ***SEE ATTACHED PHOTOS*** 12/9/2022 - PREVIOUS INSPECTION NOTES **12/09/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/12/22 ***SEE ATTACHED PHOTOS*** 12/8/2022 - PREVIOUS INSPECTION NOTES **12/08/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/09/22 ***SEE ATTACHED PHOTOS*** 12/7/2022 - PREVIOUS INSPECTION NOTES 12/07/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/8/22 _____________________________________________________________________________________________________________________ 12/6/2022 - PREVIOUS INSPECTION NOTES 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/7/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS*** | |||
| ROW - DRAINAGE | 12/12/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: **12/12/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/12/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/12/22 ***SEE ATTACHED PHOTOS*** 12/9/2022 - PREVIOUS INSPECTION NOTES **12/09/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/12/22 ***SEE ATTACHED PHOTOS*** 12/8/2022 - PREVIOUS INSPECTION NOTES **12/08/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/09/22 ***SEE ATTACHED PHOTOS*** 12/7/2022 - PREVIOUS INSPECTION NOTES 12/07/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/8/22 _____________________________________________________________________________________________________________________ 12/6/2022 - PREVIOUS INSPECTION NOTES 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/7/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS*** | |||
| ROW - DRAINAGE | 12/09/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: **12/09/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/12/22 ***SEE ATTACHED PHOTOS*** 12/8/2022 - PREVIOUS INSPECTION NOTES **12/08/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/09/22 ***SEE ATTACHED PHOTOS*** 12/7/2022 - PREVIOUS INSPECTION NOTES 12/07/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/8/22 _____________________________________________________________________________________________________________________ 12/6/2022 - PREVIOUS INSPECTION NOTES 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/7/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS*** | |||
| ROW - DRAINAGE | 12/08/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: **12/08/222 WE ARE GOING TO ADD A STOP WORK ORDER ON 12/09/22 NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ** BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/09/22 ***SEE ATTACHED PHOTOS*** 12/7/2022 - PREVIOUS INSPECTION NOTES 12/07/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/8/22 _____________________________________________________________________________________________________________________ 12/6/2022 - PREVIOUS INSPECTION NOTES 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/7/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS*** | |||
| ROW - DRAINAGE | 12/07/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 12/07/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/8/22 _____________________________________________________________________________________________________________________ 12/6/2022 - PREVIOUS INSPECTION NOTES 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/7/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS*** | |||
| ROW - DRAINAGE | 12/06/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 12/06/22= WE ARE GOING TO ADD A STOP WORK ORDER ON 12/9/22= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 12/7/22 ________________________________________________________________________________________________________________________ 12/5/2022 - PREVIOUS INSPECTION NOTES ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS*** | |||
| ROW - DRAINAGE | 12/05/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/05/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/06/22 ***SEE ATTACHED PHOTOS*** 12/2/2022 - PREVIOUS INSPECTION NOTES ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS*** | |||
| ROW - DRAINAGE | 12/02/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/02/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/05/22 ***SEE ATTACHED PHOTOS*** 11/28/2022 - PREVIOUS INSPECTION NOTES ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS*** | |||
| ROW - DRAINAGE | 11/28/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/28/22 BUILDER NEEDS TO OPEN DRAINAGE CONVEYANCE (SWALE) AT THE FRONT OF THE CONSTRUCTION SITE NEED TO REMOVE PORTA-JOHN FROM SWALE AND RELOCATE ONTO THE JOB SITE. ** NEED TO REMOVE DUMPSTER FROM SWALE AND RELOCATE ONTO JOB SITE. ** NEED TO REMOVE MOUND OF DRIED CONCRETE THAST WAS DUMPED IN SWALE AND REMOVE MATERIAL THAT HAS WASHED ONTO ROADWAY AND SWALE. ** IT IS THE BUILDERS RESONSIBILITY TO MAINTAIN THE ROW DRAINAGE ON A DAILY BASIS ** FOLLOW UP INSPECTION ON 12/02/22 ***SEE ATTACHED PHOTOS*** | |||
| TIE BEAM / LINTEL | 10/07/2022 | APPROVED | AGAETANO |
| Note: 10/6/2022 - PREVIOUS INSPECTION NOTES 10-6-2022 Contractor not ready. Workers on site. | |||
| TIE BEAM / LINTEL | 10/06/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 10-6-2022 Contractor not ready. Workers on site. | |||
| MONOLITHIC SLAB | 07/22/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/20/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Not ready, 1:30 pm just starting | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/18/2022 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: Not ready, 1:30 pm just starting | |||
| WATER METER INSTALLATION REQUEST | 05/18/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 02/05/2025 | 02/05/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SUBMIT FBC 2023 BLOWER DOOR TEST | |||
| MECH | COMPLETE | 01/30/2025 | 01/31/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/04/2023 | 04/10/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/14/2023 | 02/15/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/14/2023 | 02/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/14/2023 | 02/14/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/20/2022 | 04/20/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/20/2022 | 04/21/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/20/2022 | 04/21/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/20/2022 | 04/27/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/14/2022 | 05/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/11/2022 | 03/15/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Design pressure of garage door with product approval FL 14170.9 is less than the required design pressure shown on sheet 1 of 9. Provide FL number to comply with the required design pressure per F.S. 553.842. | |||
| CUSVC | COMPLETE | 03/11/2022 | 03/16/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 03/11/2022 | 03/14/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs | |||
| ENGIN1 | COMPLETE | 03/11/2022 | 03/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/11/2022 | 03/15/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/11/2022 | 03/17/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/11/2022 | 03/15/2022 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM the site plan must show date and stamp and seal also must show center of road elevations i believe the copy was just a mistake | |||
| ZON | HOLD | 03/11/2022 | 03/14/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM please rescan site plan all legal information was cut off when uploaded |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/31/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 01/31/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 01/31/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 01/31/2025 |
| CONTRACTOR CHANGE | ¤40.00 | 01/31/2025 |
| CONTRACTOR CHANGE | ¤80.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| REINSPECTION FEE | ¤40.00 | 01/31/2025 |
| REINSPECTION FEE | ¤40.00 | 01/31/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/31/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/31/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/31/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/12/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/12/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 05/12/2022 |
| SEWER CREDIT | (¤1,147.00) | 05/12/2022 |
| SEWER INSPECTION | ¤25.00 | 05/12/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 05/12/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 05/12/2022 |
| SITE PLAN 30 | ¤30.00 | 05/12/2022 |
| SURCHARGE FS 533.721 | ¤12.45 | 05/12/2022 |
| SURCHARGE - FS 468.631 | ¤18.68 | 05/12/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/12/2022 |
| WATER- TURN ON | ¤50.00 | 05/12/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/12/2022 |
| INSPECTION - RESIDENTIAL | ¤899.25 | 05/12/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤255.06 | 05/12/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/12/2022 |
| SW ENG PRE APRON | ¤30.00 | 05/12/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 05/12/2022 |
| IMPACT FEE FIRE | ¤777.30 | 05/12/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 05/12/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 05/12/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 05/12/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 05/12/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 05/12/2022 |
| CONNECTION FEES | ¤2,155.76 | 05/12/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤34,389.51 |