I want to search for...

Permit #2022030778

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-2740
CONDITIONED SPACE: 2912 sqft
OPENED PORCH (WITH ROOF) : 422 sqft
OPENED PORCH (WITH ROOF) : 79 sqft
GARAGE: 770 sqft
Total Square Footage: 4183 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-447-4400
Location Address: 498 SWEETGUM LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/29/2022
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: OBRIEN NATHAN SHAWN & JENNIFER A TRUSTEES

Address

APT 221

NORTH BETHESDA, MD 20852

Address

5230 TUCKERMAN LN

NORTH BETHESDA, MD 20852

Lot: 2740
Contracted Stated Job Value: ¤632,000.00
Job Description: Single Family Residence
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629

Inspection History

Type Request Date Result Inspector
GAS FINAL 09/27/2023 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2225 CHECK FOR BOND WIRE AT INSULATION INSPECTION SPOKE TO ART OWNER CHANGED THEIR MIND, NO GAS CONTRACTOR NEEDED FOR BOTTLE GAS FOR SUMMER KITCHCHEN GRILL
BLD - BUILDING FINAL 09/27/2023 FINAL APPROVED AGAETANO
U -UTILITY RESIDENTIAL FINAL 09/26/2023 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 09/25/2023 APPROVED RGROSS
Note: 9/22/2023 - PREVIOUS INSPECTION NOTES 9/14/2023 - PREVIOUS INSPECTION NOTES ** 09/14/23 RIGHT SIDE IN FRONT AT PROPERTY LINE NEED TO FILL IN AROUND PINK LID WATER BOXES AND SOD ** REMOVE ALL SEDIMENT THAT ERODED INTO POND ** LEFT SIDE REAR ALONG PROPERTY LINE SEVERE WASHOUT DUMPED EXCESSIVE AMOUNT OF SEDIMENT AND BARK MULCH INTO THE POND, PLANTS AND BARK MULCH NEED TO BE REMOVED FROM THE DRAINAGE CONVEYANCE ** NEED CONTAINMENT OF BARK MULCH ALONG DRIVEWAY AS IT IS WASHING INTO THE CURB AND GUTTER WHICH THEN DUMPS INTO THE STORMWATER DRAINAGE SYSTEM ** SEE ATTACHED PHOTOS
ROW - STORMWATER FINAL 09/25/2023 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 09/25/2023 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 09/22/2023 CANCELLED BY APPLICANT EMADISON
Note: 9/14/2023 - PREVIOUS INSPECTION NOTES ** 09/14/23 RIGHT SIDE IN FRONT AT PROPERTY LINE NEED TO FILL IN AROUND PINK LID WATER BOXES AND SOD ** REMOVE ALL SEDIMENT THAT ERODED INTO POND ** LEFT SIDE REAR ALONG PROPERTY LINE SEVERE WASHOUT DUMPED EXCESSIVE AMOUNT OF SEDIMENT AND BARK MULCH INTO THE POND, PLANTS AND BARK MULCH NEED TO BE REMOVED FROM THE DRAINAGE CONVEYANCE ** NEED CONTAINMENT OF BARK MULCH ALONG DRIVEWAY AS IT IS WASHING INTO THE CURB AND GUTTER WHICH THEN DUMPS INTO THE STORMWATER DRAINAGE SYSTEM ** SEE ATTACHED PHOTOS
U-CROSS CONNECTION 09/18/2023 APPROVED - AS NOTED LFITZGERALD
Note: mster backflow reclaim-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/14/2023 APPROVED EMADISON
Note: Inspector Notes from Inspection 9270 ** 07/07/23 READY TO SET PAVERS _____________________________________________________________________________________________________________________ 6/27/2023 - PREVIOUS INSPECTION NOTES ** 06/27/23 READY TO POUR APRON AND PAVER RESTRAINTS ** **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/16/2023 - PREVIOUS INSPECTION NOTES ** 06/16/23 INSPECTOR UNABLE TO LOCATE RESIDENTIAL PAVER RESTRAINT DETAIL PLAN NOTHING IN PERMITBOX NOTHING DOWN LOADED IN THE ATTACHMENTS
ROW FIELD SURVEY /GRADING CERTIFICATION 09/14/2023 Disapproved - NO FEE EMADISON
Note: ** 09/14/23 RIGHT SIDE IN FRONT AT PROPERTY LINE NEED TO FILL IN AROUND PINK LID WATER BOXES AND SOD ** REMOVE ALL SEDIMENT THAT ERODED INTO POND ** LEFT SIDE REAR ALONG PROPERTY LINE SEVERE WASHOUT DUMPED EXCESSIVE AMOUNT OF SEDIMENT AND BARK MULCH INTO THE POND, PLANTS AND BARK MULCH NEED TO BE REMOVED FROM THE DRAINAGE CONVEYANCE ** NEED CONTAINMENT OF BARK MULCH ALONG DRIVEWAY AS IT IS WASHING INTO THE CURB AND GUTTER WHICH THEN DUMPS INTO THE STORMWATER DRAINAGE SYSTEM ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 07/07/2023 APPROVED - AS NOTED EMADISON
Note: ** 07/07/23 READY TO SET PAVERS _____________________________________________________________________________________________________________________ 6/27/2023 - PREVIOUS INSPECTION NOTES ** 06/27/23 READY TO POUR APRON AND PAVER RESTRAINTS ** **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/16/2023 - PREVIOUS INSPECTION NOTES ** 06/16/23 INSPECTOR UNABLE TO LOCATE RESIDENTIAL PAVER RESTRAINT DETAIL PLAN NOTHING IN PERMITBOX NOTHING DOWN LOADED IN THE ATTACHMENTS
ROW- PAVER RESTRAINTS 06/27/2023 APPROVED EMADISON
Note: ** 06/27/23 READY TO POUR PAVER RESTRAINTS AND APRON **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 06/27/2023 PARTIALLY APPROVED EMADISON
Note: ** 06/27/23 READY TO POUR APRON AND PAVER RESTRAINTS ** **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ______________________________________________________________________________________________________________________ New inspection due to canceled inspection 6/16/2023 - PREVIOUS INSPECTION NOTES ** 06/16/23 INSPECTOR UNABLE TO LOCATE RESIDENTIAL PAVER RESTRAINT DETAIL PLAN NOTHING IN PERMITBOX NOTHING DOWN LOADED IN THE ATTACHMENTS
ROW- PRE-APRON (PRE-POUR) 06/20/2023 CANCELLED BY APPLICANT WEB
Note: 6/16/2023 - PREVIOUS INSPECTION NOTES ** 06/16/23 INSPECTOR UNABLE TO LOCATE RESIDENTIAL PAVER RESTRAINT DETAIL PLAN NOTHING IN PERMITBOX NOTHING DOWN LOADED IN THE ATTACHMENTS
ROW- PRE-APRON (PRE-POUR) 06/16/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 06/16/23 INSPECTOR UNABLE TO LOCATE RESIDENTIAL PAVER RESTRAINT DETAIL PLAN NOTHING IN PERMITBOX NOTHING DOWN LOADED IN THE ATTACHMENTS
U - SEWER TIE IN 05/12/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 05/12/2023 APPROVED MGIBSON
ELECTRIC - EARLY POWER 04/27/2023 APPROVED - AS NOTED AGAETANO
Note: 04-27-2023 FPL notified at 8:33
LATH/BRICK/ WATER BARRIER 03/03/2023 APPROVED AGAETANO
INSULATION 01/30/2023 APPROVED AGAETANO
ELECTRIC-TUG 01/30/2023 APPROVED AGAETANO
GAS ROUGH 01/13/2023 APPROVED - AS NOTED MGIBSON
Note: CHECK FOR BOND WIRE AT INSULATION INSPECTION
ALL ROUGH 01/13/2023 APPROVED AGAETANO
ROOF VALLEY & METAL 01/12/2023 APPROVED FWILLIS
WALL SHEATHING 01/10/2023 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/22/2022 APPROVED AGAETANO
TIE BEAM / LINTEL 08/19/2022 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 07/07/2022 APPROVED TBAKER
MONOLITHIC SLAB 06/28/2022 Disapproved - NO FEE AGAETANO
Note: R 506.1 Minimum slab depth requirements 3 1/2". Pulled test lines. Noted on drawings.
MONOLITHIC SLAB 06/28/2022 APPROVED LMILLER
Note: THIS IS A REINSPECTION R 506.1 Minimum slab depth requirements 3 1/2". Pulled test lines. Noted on drawings. 6-28-22 second visit from second inspector at the request of first inspector and super, as I was going to the area for another inspection and this only needed a small correction which could and was performed prior to my arrival in the area. Notes above resolved.
PLUMBING 1ST ROUGH UNDERGROUND 06/22/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 06/01/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 09/26/2023 09/27/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 09/25/2023 09/26/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 08/21/2023 08/22/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/16/2023 06/16/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/16/2023 06/26/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BLD COMPLETE 05/09/2023 05/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/06/2022 07/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/06/2022 07/06/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/29/2022 03/30/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 03/22/2022 03/22/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 03/22/2022 03/23/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/22/2022 03/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 03/22/2022 03/28/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
URB COMPLETE 03/15/2022 03/21/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 03/14/2022 03/15/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 03/14/2022 03/16/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 03/14/2022 03/15/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electrical plan
ENGIN1 COMPLETE 03/14/2022 03/14/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 03/14/2022 03/21/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/14/2022 03/17/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SW1 COMPLETE 03/14/2022 03/21/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 03/14/2022 03/15/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan/survey doesn't show the front entry walkway or separation between front of house and driveway for foundation plantings

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 09/27/2023
PLAN REVIEW - REVISION ¤32.50 08/23/2023
CONTRACTOR CHANGE ¤40.00 08/23/2023
SW ENG REINSPECTION 30 ¤30.00 08/23/2023
SW ENG - REVIEW 20 ¤20.00 03/29/2022
SW ENG RES REVIEW 200 ¤200.00 03/29/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 03/29/2022
SEWER INSPECTION ¤25.00 03/29/2022
SITE PLAN 30 ¤30.00 03/29/2022
WATER-METER ¤467.09 03/29/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/29/2022
INSPECTION - RESIDENTIAL ¤1,738.00 03/29/2022
PLAN REVIEW - RESIDENTIAL ¤492.96 03/29/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 03/29/2022
IMPACT FEE FIRE ¤388.65 03/29/2022
IMPACT FEE PARKS ¤1,455.13 03/29/2022
IMPACT FEE SCHOOL ¤3,600.00 03/29/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 03/29/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 03/29/2022
SURCHARGE FS 533.721 ¤23.50 03/29/2022
SURCHARGE - FS 468.631 ¤35.25 03/29/2022
SW ENG - FOUNDATION SURVEY ¤20.00 03/29/2022
SW ENG INSPECTION 80 ¤80.00 03/29/2022
SW ENG PRE APRON ¤30.00 03/29/2022
CONNECTION FEES ¤25.00 03/29/2022
Fees Total Due: ¤0.00 Total Paid: ¤11,867.55