I want to search for...
Permit #2022030800
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00720-0190 |
| GARAGE: 433 sqft |
| CONDITIONED SPACE: 2062 sqft |
| OPENED PORCH (WITH ROOF) : 52 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2659 sqft |
| Block: 00720 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 904-888-6443 |
| Location Address: 87 POINT OF WOODS DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/02/2022 |
| NOC: RECORDED |
| Applicant name: AMIR BENTOV |
| Owner: DS PALM COAST DEV LLC |
|
Address 820 S EDENBRIDGE WAY SAINT AUGUSTINE, FL 32092 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
MAVEN HOMES LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2800 N 6TH ST UNIT 790 , |
CRC1333741 (Exp: 08/31/2026) | 904-667-4330 |
Sub Contractors
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
ROBERT E GRANT JR
| Status | Location Address | State License Number |
| INACTIVE |
6060 CHESTER CIRCLE JACKSONVILLE, FL 32217 |
EC13008285 (Exp: 08/31/2024) |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/22/2023 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 05/19/2023 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 05/19/2023 | FINAL APPROVED | DHANEY |
| Note: 5/9/2023 - PREVIOUS INSPECTION NOTES need access to garage to inspect pep circuit breaker/ pep panel information stickers painted over-go to utility dept. and get new ones and reapply | |||
| LATH/BRICK/ WATER BARRIER | 05/16/2023 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 05/09/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: need access to garage to inspect pep circuit breaker/ pep panel information stickers painted over-go to utility dept. and get new ones and reapply | |||
| LATH/BRICK/ WATER BARRIER | 05/08/2023 | CANCELLED BY INSPECTOR | PPROVIDER |
| PLUMBING FINAL | 05/02/2023 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 05/02/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 05/02/2023 | Approval - Private Provider | PPROVIDER |
| ROW - FINAL APRON (AFTER POUR) | 04/21/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 04/20/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/20/2023 | APPROVED | GBERTOLA |
| ROW - STORMWATER FINAL | 04/20/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/20/2023 | APPROVED | GBERTOLA |
| Note: 4/6/2023 - PREVIOUS INSPECTION NOTES 04/06/23 NEED TO PROVIDE MORE ELEVATION SHOTS ALONG THE REAR 5' EASEMENT WHERE BERM IS. This was rescheduled by Robert. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/06/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 04/06/23 NEED TO PROVIDE MORE ELEVATION SHOTS ALONG THE REAR 5' EASEMENT WHERE BERM IS. This was rescheduled by Robert. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/15/2023 | CANCELLED BY INSPECTOR | RGROSS |
| U-CROSS CONNECTION | 02/27/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ELECTRIC - EARLY POWER | 02/03/2023 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 01/30/2023 | APPROVED | GBERTOLA |
| Note: 01/30/23=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/26/2023 - PREVIOUS INSPECTION NOTES 1) THE SOIL IN POURING AREA IS WAY TO SOFT. NEED TO HAVE 95% COMPACTION IN THE POURING AREA 2) THE SWALE DIAGRAM SHOWS THER WATER FLOWING FROM RIGHT TO LEFT YOUR CULVERT IS PITCH THE OTHER DIRECTION FROM LEFT TO RIGHT. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/26/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) THE SOIL IN POURING AREA IS WAY TO SOFT. NEED TO HAVE 95% COMPACTION IN THE POURING AREA 2) THE SWALE DIAGRAM SHOWS THER WATER FLOWING FROM RIGHT TO LEFT YOUR CULVERT IS PITCH THE OTHER DIRECTION FROM LEFT TO RIGHT. | |||
| U - SEWER TIE IN | 11/30/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 11/30/2022 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 10/31/2022 | APPROVED | CSTONE |
| Note: 10/19/2022 3:24:45 PM- PREVIOUS INSPECTION NOTES Interior & Dumpster (sheet rock must be on site) | |||
| PEP TANK INSTALLATION REQUEST | 10/19/2022 | Disapproved - NO FEE | CSTONE |
| Note: Interior & Dumpster (sheet rock must be on site) | |||
| INSULATION | 10/14/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 09/27/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 08/16/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 08/16/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/16/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 08/16/2022 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 07/05/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/21/2022 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 06/14/2022 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION Silt fence needed along the left side property line where the existing house is . Called and left msg to builder. Being given 5 business days to comply. Left a msg with house 85 and explained the Drainage Inspection procedure. This is PCC case 00111549 and Work order 00032333. Next insepction 7/14/22. | |||
| ROW - DRAINAGE | 06/07/2022 | Disapproved - NO FEE | RGROSS |
| Note: Silt fence needed along the left side property line where the existing house is . Called and left msg to builder. Being given 5 business days to comply. Left a msg with house 85 and explained the Drainage Inspection procedure. This is PCC case 00111549 and Work order 00032333. Next insepction 7/14/22. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/02/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 05/09/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 5/4/2022 2:23:35 PM lot not clear | |||
| WATER METER INSTALLATION REQUEST | 05/03/2022 | Disapproved - NO FEE | CSTONE |
| Note: lot not clear |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 05/08/2023 | 05/08/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The building final cannot be scheudled with the Private provider unless it has been scheduled with the building department. | |||
| BADMIN | INFORMATION | 07/05/2022 | 07/05/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY.PDF ONLY | |||
| ENGIN1 | COMPLETE | 07/05/2022 | 07/05/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/05/2022 | 07/05/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/22/2022 | 03/22/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/22/2022 | 03/23/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/15/2022 | 03/15/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/15/2022 | 03/16/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 03/15/2022 | 03/16/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct Outlet spacing NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 03/15/2022 | 03/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/15/2022 | 03/21/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/15/2022 | 03/18/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/15/2022 | 03/21/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/15/2022 | 03/15/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan/Survey missing setbacks AC pad location on site plan/survey doesn't match landscape plan and floor plan | |||
| SWALE | COMPLETE | 03/15/2022 | 05/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/18/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 05/08/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 05/08/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/08/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/08/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/02/2022 |
| SW ENG PRE APRON | ¤30.00 | 05/02/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/02/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/02/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 05/02/2022 |
| SEWER CREDIT | (¤2,971.04) | 05/02/2022 |
| SEWER INSPECTION | ¤25.00 | 05/02/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 05/02/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 05/02/2022 |
| SITE PLAN 30 | ¤30.00 | 05/02/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 05/02/2022 |
| IMPACT FEE FIRE | ¤388.65 | 05/02/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 05/02/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/02/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 05/02/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/02/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 05/02/2022 |
| SURCHARGE FS 533.721 | ¤9.78 | 05/02/2022 |
| SURCHARGE - FS 468.631 | ¤14.66 | 05/02/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/02/2022 |
| ¤0.00 | 05/02/2022 | |
| METER - DEPOSIT | ¤60.00 | 05/02/2022 |
| WATER- TURN ON | ¤25.00 | 05/02/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/02/2022 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 05/02/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤197.34 | 05/02/2022 |
| CONNECTION FEES | ¤1,077.88 | 05/02/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,894.43 |