I want to search for...
Permit #2022030802
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00470-0010 |
| CONDITIONED SPACE: 2062 sqft |
| GARAGE: 433 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| OPENED PORCH (WITH ROOF) : 52 sqft |
| Total Square Footage: 2659 sqft |
| Block: 00470 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 904-888-6443 |
| Location Address: 6 RYBARK PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/02/2022 |
| NOC: RECORDED |
| Applicant name: AMIR BENTOV |
| Owner: DS PALM COAST DEV LLC |
|
Address 820 S EDENBRIDGE WAY ST AUGUSTINE, FL 32092 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MAVEN HOMES LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2800 N 6TH ST UNIT 790 , |
CRC1333741 (Exp: 08/31/2026) | 904-667-4330 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
ROBERT E GRANT JR
| Status | Location Address | State License Number |
| INACTIVE |
6060 CHESTER CIRCLE JACKSONVILLE, FL 32217 |
EC13008285 (Exp: 08/31/2024) |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| INACTIVE |
121 BIRD OF PARADISE DR BUNNELL, FL 32110 |
386-931-8940 | 386-986-4835 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 07/06/2023 | APPROVED | FSLADISH |
| Note: 07/06/23 MEETS CITY OF PALM COAST MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION. __________________________________________________________________________________________________________________________ 6/30/2023 - PREVIOUS INSPECTION NOTES NEED TO PICK ALL TRASH AND CONSTRUCTION DEBRIS FROM YOUR LOT AND IN VACANT AND RESERVE PARCEL AROUND YOUR LOT ----------------------------------------------------------------------------------------------- 6/28/2023 - PREVIOUS INSPECTION NOTES 06/28/23 WALKED THE PROPERTY WITH GABE. THE RIGHT SIDE IS A BIT LOW BUT HE SEEMS TO THINK IT SHOULD WORK. THE LEFT SIDE REAR WHERE IT HAS BEEN PAINTED NEEDS TO BE RAISED A BIT TO ALLOW FOR POSITIVE FORWARD DRAINAGE. PLEASE SEE PICTURE FOR REFERENCE. I WILL NOT FEE YOU FOR TODAYS INSPECTION | |||
| ROW - STORMWATER FINAL | 06/30/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO PICK ALL TRASH AND CONSTRUCTION DEBRIS FROM YOUR LOT AND IN VACANT AND RESERVE PARCEL AROUND YOUR LOT ----------------------------------------------------------------------------------------------- 6/28/2023 - PREVIOUS INSPECTION NOTES 06/28/23 WALKED THE PROPERTY WITH GABE. THE RIGHT SIDE IS A BIT LOW BUT HE SEEMS TO THINK IT SHOULD WORK. THE LEFT SIDE REAR WHERE IT HAS BEEN PAINTED NEEDS TO BE RAISED A BIT TO ALLOW FOR POSITIVE FORWARD DRAINAGE. PLEASE SEE PICTURE FOR REFERENCE. I WILL NOT FEE YOU FOR TODAYS INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 06/30/2023 | FINAL APPROVED | JHARDING |
| Note: 6/27/2023 - PREVIOUS INSPECTION NOTES no power tpo pep pane3l/no circuit breaker for this/lower sewer clean out so flush to grades/PAINTED OVER LABELS ON PEP PANEL COVER-GO TO CITY UTILITY DEPT -GET LABELS AND ATTACH | |||
| ROW- PROJECT STATUS | 06/28/2023 | APPROVED - AS NOTED | GBERTOLA |
| Note: 6/28/2023 - PREVIOUS INSPECTION NOTES 06/28/23 WALKED THE PROPERTY WITH GABE. THE RIGHT SIDE IS A BIT LOW BUT HE SEEMS TO THINK IT SHOULD WORK. THE LEFT SIDE REAR WHERE IT HAS BEEN PAINTED NEEDS TO BE RAISED A BIT TO ALLOW FOR POSITIVE FORWARD DRAINAGE. PLEASE SEE PICTURE FOR REFERENCE. I WILL NOT FEE YOU FOR TODAYS INSPECTION | |||
| ROW - STORMWATER FINAL | 06/28/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 06/28/23 WALKED THE PROPERTY WITH GABE. THE RIGHT SIDE IS A BIT LOW BUT HE SEEMS TO THINK IT SHOULD WORK. THE LEFT SIDE REAR WHERE IT HAS BEEN PAINTED NEEDS TO BE RAISED A BIT TO ALLOW FOR POSITIVE FORWARD DRAINAGE. PLEASE SEE PICTURE FOR REFERENCE. I WILL NOT FEE YOU FOR TODAYS INSPECTION ____________________________________________________________________________________________________________________ 6/27/2023 - PREVIOUS INSPECTION NOTES 06/27/23 I HAVE CANCELLED THIS INSPECTION FOR TODAY. GABE BERTOLA OUR LEAD PROJECT SPECIALIST WILL BE COMING OVER TOMORROW TO INSPECT IT FOR FINAL CLEARANCE. THANK YOU. __________________________________________________________________________________________________________________________ o6/20/23= need to pick UP THE CARPET ON THE RIGHT SIDE SWALE BEFORE PASS THIS INSPECTION | |||
| ROW - STORMWATER FINAL | 06/27/2023 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 06/27/23 I HAVE CANCELLED THIS INSPECTION FOR TODAY. GABE BERTOLA OUR LEAD PROJECT SPECIALIST WILL BE COMING OVER TOMORROW TO INSPECT IT FOR FINAL CLEARANCE. THANK YOU. __________________________________________________________________________________________________________________________ o6/20/23= need to pick UP THE CARPET ON THE RIGHT SIDE SWALE BEFORE PASS THIS INSPECTION | |||
| BLD - BUILDING FINAL | 06/27/2023 | Approval - Private Provider | PPROVIDER |
| Note: 6/26/2023 2:52:40 PM- PREVIOUS INSPECTION NOTES | |||
| U -UTILITY RESIDENTIAL FINAL | 06/27/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: no power tpo pep pane3l/no circuit breaker for this/lower sewer clean out so flush to grades/PAINTED OVER LABELS ON PEP PANEL COVER-GO TO CITY UTILITY DEPT -GET LABELS AND ATTACH | |||
| BLD - BUILDING FINAL | 06/26/2023 | Disapproved- Private Provider | PPROVIDER |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/20/2023 | APPROVED | GBERTOLA |
| Note: 6/20/23= correction were made At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/15/2023 - PREVIOUS INSPECTION NOTES 06/15/23 NOTHING HAS CHANGED. I WOULD SUGGEST THAT YOU REQUEST A SITE MEET WITH EITHER GABE BERTOLA OR ROBERT GROSS TO DISCUSS THIS PROPERTY, I DONT FEEL IT WILL DRAIN AS INDICATED IN SURVEY. UPON WALKING THE PROPERTY TODAY I HAVE FOUND THE THE BACK AEREA COMING OF OF THE LANAI GOING BOTH WAYS IS FLAT. WHAT DOES FLOW IN EITHER DIRECTION WILL END UP BEING HELD IN THE TWO FLAT LOW AREAS ON EITHER SIDE OF THE RESIDENCE. IT WILL POOL IN THESE AREAS. YOU NEED TO MAKE SURE YOU HAVE POSITIVE DRAINAGE FROM REAR TO SIDE TO FRONT. I AM NOT GOING TO FEE YOU FOR TODAY'S INSPECTION. ___________________________________________________________________________________________________________________________ ON THE LEFT SIDE UP NEAR WHERE THE DRIVEWAY BEGINS THERE IS ANOTHER LOW SPOT HOLDIG WATER THAT WILL ALSO NEED TO BE ADDRESSED. New inspection due to canceled inspection 5/15/2023 - PREVIOUS INSPECTION NOTES 05/15/23 UPON WALKING THE PROPERTY I HAVE FOUND THE THE BACK AEREA COMING OF OF THE LANAI GOING BOTH WAYS IS FLAT. WHAT DOES FLOW IN EITHER DIRECTION WILL END UP BEING HELD IN THE TWO FLAT LOW AREAS ON EITHER SIDE OF THE RESIDENCE. YOU NEED TO MAKE SURE YOU HAVE POSITIVE DRAINAGE FROM REAR TO SIDE TO FRONT. ON THE LEFT SIDE UP NEAR WHERE THE DRIVEWAY BEGINS THERE IS ANOTHER LOW SPOT HOLDIG WATER THAT WILL ALSO NEED TO BE ADDRESSED. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/20/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/15/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 06/15/23 NOTHING HAS CHANGED. I WOULD SUGGEST THAT YOU REQUEST A SITE MEET WITH EITHER GABE BERTOLA OR ROBERT GROSS TO DISCUSS THIS PROPERTY, I DONT FEEL IT WILL DRAIN AS INDICATED IN SURVEY. UPON WALKING THE PROPERTY TODAY I HAVE FOUND THE THE BACK AEREA COMING OF OF THE LANAI GOING BOTH WAYS IS FLAT. WHAT DOES FLOW IN EITHER DIRECTION WILL END UP BEING HELD IN THE TWO FLAT LOW AREAS ON EITHER SIDE OF THE RESIDENCE. IT WILL POOL IN THESE AREAS. YOU NEED TO MAKE SURE YOU HAVE POSITIVE DRAINAGE FROM REAR TO SIDE TO FRONT. I AM NOT GOING TO FEE YOU FOR TODAY'S INSPECTION. ___________________________________________________________________________________________________________________________ ON THE LEFT SIDE UP NEAR WHERE THE DRIVEWAY BEGINS THERE IS ANOTHER LOW SPOT HOLDIG WATER THAT WILL ALSO NEED TO BE ADDRESSED. New inspection due to canceled inspection 5/15/2023 - PREVIOUS INSPECTION NOTES 05/15/23 UPON WALKING THE PROPERTY I HAVE FOUND THE THE BACK AEREA COMING OF OF THE LANAI GOING BOTH WAYS IS FLAT. WHAT DOES FLOW IN EITHER DIRECTION WILL END UP BEING HELD IN THE TWO FLAT LOW AREAS ON EITHER SIDE OF THE RESIDENCE. YOU NEED TO MAKE SURE YOU HAVE POSITIVE DRAINAGE FROM REAR TO SIDE TO FRONT. ON THE LEFT SIDE UP NEAR WHERE THE DRIVEWAY BEGINS THERE IS ANOTHER LOW SPOT HOLDIG WATER THAT WILL ALSO NEED TO BE ADDRESSED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/14/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 5/15/2023 - PREVIOUS INSPECTION NOTES 05/15/23 UPON WALKING THE PROPERTY I HAVE FOUND THE THE BACK AEREA COMING OF OF THE LANAI GOING BOTH WAYS IS FLAT. WHAT DOES FLOW IN EITHER DIRECTION WILL END UP BEING HELD IN THE TWO FLAT LOW AREAS ON EITHER SIDE OF THE RESIDENCE. YOU NEED TO MAKE SURE YOU HAVE POSITIVE DRAINAGE FROM REAR TO SIDE TO FRONT. ON THE LEFT SIDE UP NEAR WHERE THE DRIVEWAY BEGINS THERE IS ANOTHER LOW SPOT HOLDIG WATER THAT WILL ALSO NEED TO BE ADDRESSED. | |||
| LATH/BRICK/ WATER BARRIER | 05/16/2023 | Approval - Private Provider | PPROVIDER |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/15/2023 | APPROVED | FSLADISH |
| Note: 5/11/2023 - PREVIOUS INSPECTION NOTES 05/11/23 rear of property is flat for more than 20'. Water needs to flow positively towards the front. In the rear it is flat from the lanai to the rear property line, water will sit there. Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. 5. Positive fall is considered to be 0.10 feet in 20 feet. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/15/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 05/15/23 UPON WALKING THE PROPERTY I HAVE FOUND THE THE BACK AEREA COMING OF OF THE LANAI GOING BOTH WAYS IS FLAT. WHAT DOES FLOW IN EITHER DIRECTION WILL END UP BEING HELD IN THE TWO FLAT LOW AREAS ON EITHER SIDE OF THE RESIDENCE. YOU NEED TO MAKE SURE YOU HAVE POSITIVE DRAINAGE FROM REAR TO SIDE TO FRONT. ON THE LEFT SIDE UP NEAR WHERE THE DRIVEWAY BEGINS THERE IS ANOTHER LOW SPOT HOLDIG WATER THAT WILL ALSO NEED TO BE ADDRESSED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/11/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 05/11/23 rear of property is flat for more than 20'. Water needs to flow positively towards the front. In the rear it is flat from the lanai to the rear property line, water will sit there. Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. 5. Positive fall is considered to be 0.10 feet in 20 feet. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 05/08/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE ELEVATION ARE TO FLAT ACROSSED THE BACK DRAINAGE NEED TO HAVE .10 OF FALL EVERY 20' 2) ALL SOD ELEVATIONS AGAINST THE HOME NEED TO BE 6" ON WOOD FRAME STRUCTURES AND 4" ON CONCRETE STRUCTURES | |||
| LATH/BRICK/ WATER BARRIER | 05/08/2023 | CANCELLED BY INSPECTOR | PPROVIDER |
| ELECTRIC - EARLY POWER | 03/10/2023 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 03/10/2023 | APPROVED | RGROSS |
| Note: Ready to pour 3/6/2023 - PREVIOUS INSPECTION NOTES 03/6/23= CULVERT PIPE ON THE RIGHT SIDE NEED TO BE A 5 FT FROM THE EDGE OF THE ROAD . The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs FORM BOARDS ON THE DRIVEWAY ARE MOVING THE WATER IN THE WRONG DIRECTION BOTH SIDE INTO THE GARAGE. WATER NEED TO GO AWAY FROM THE HOUSE YOU NEED 8% . | |||
| ROW- PRE-APRON (PRE-POUR) | 03/06/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 03/6/23= CULVERT PIPE ON THE RIGHT SIDE NEED TO BE A 5 FT FROM THE EDGE OF THE ROAD . The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs FORM BOARDS ON THE DRIVEWAY ARE MOVING THE WATER IN THE WRONG DIRECTION BOTH SIDE INTO THE GARAGE. WATER NEED TO GO AWAY FROM THE HOUSE YOU NEED 8% . | |||
| U-CROSS CONNECTION | 02/27/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW- PROJECT STATUS | 02/15/2023 | APPROVED | GBERTOLA |
| Note: MEETING WITH ROBBY CHECK THE STORMWATER DRAINAGE | |||
| U - SEWER TIE IN | 01/04/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 01/04/2023 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 12/09/2022 | APPROVED | TCHURCHILL |
| Note: 12/7/2022 2:53:11 PM- PREVIOUS INSPECTION NOTES Interior (sheet rock must be on site) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/08/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 12/08/2022 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 12/07/2022 | Disapproved - NO FEE | CSTONE |
| Note: Interior (sheet rock must be on site) | |||
| INSULATION | 12/02/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 11/18/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 08/08/2022 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 07/18/2022 | APPROVED | AMOBLEY |
| MONOLITHIC SLAB | 07/07/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/27/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 05/27/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 5/4/2022 2:24:26 PM lot not cleared | |||
| WATER METER INSTALLATION REQUEST | 05/03/2022 | Disapproved - NO FEE | CSTONE |
| Note: lot not cleared |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 12/05/2022 | 12/05/2022 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Please submit this private provider by email to buildingdivision@palmcoastgov.com | |||
| ENGIN1 | COMPLETE | 07/18/2022 | 07/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/18/2022 | 07/18/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/23/2022 | 03/28/2022 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/23/2022 | 03/23/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/15/2022 | 03/15/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/15/2022 | 03/16/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 03/15/2022 | 03/16/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct Outlet spacing NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 03/15/2022 | 03/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/15/2022 | 03/23/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/15/2022 | 03/18/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/15/2022 | 03/15/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/15/2022 | 05/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 07/06/2023 |
| REINSPECTION FEE | ¤40.00 | 07/06/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/06/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/06/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/06/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/06/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/02/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/02/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 05/02/2022 |
| SEWER CREDIT | (¤2,341.63) | 05/02/2022 |
| SEWER INSPECTION | ¤25.00 | 05/02/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 05/02/2022 |
| WATER CREDIT | (¤767.37) | 05/02/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 05/02/2022 |
| SITE PLAN 30 | ¤30.00 | 05/02/2022 |
| SURCHARGE FS 533.721 | ¤4.95 | 05/02/2022 |
| SURCHARGE - FS 468.631 | ¤7.42 | 05/02/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/02/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/02/2022 |
| SW ENG PRE APRON | ¤30.00 | 05/02/2022 |
| WATER- TURN ON | ¤25.00 | 05/02/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/02/2022 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 05/02/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤197.34 | 05/02/2022 |
| CONNECTION FEES | ¤1,077.88 | 05/02/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 05/02/2022 |
| IMPACT FEE FIRE | ¤388.65 | 05/02/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 05/02/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/02/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 05/02/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/02/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 05/02/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,704.40 |