I want to search for...

Permit #2022030816

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7006-00090-0100
Block: 00090
Subdivision: 2213 - SECTION 6-FLORIDA PARK
Job Phone: 386-569-8447
Location Address: 19 FLARESTONE CT
Type: BIA - BUILDING INTERIOR EXTERIOR ALTERATION
Issue Date: 05/10/2022
NOC: RECORDED
Applicant name: GREGORY LEONARD ANDERSON
Owner: MARION MARTIN JAMES & TRACY J H&W

Address

6 MARSHVIEW LANE

PALM COAST, FL 32137

Lot: 0100
Contracted Stated Job Value: ¤125,000.00
Job Description: Interior remodel
Type: CN

Contractor

APOGEE CONSTRUCTION LLC
Status Location Address Mailing Address State License Number Phone
INACTIVE

2 PINE CONE DRIVE

PALM COAST, FL 32137

#3515421

PALM COAST, FL 32165

CRC1332191 (Exp: 08/31/2024) 386-569-8447

Sub Contractors

JONATHAN O'NEIL HALEY
Status Location Address State License Number Phone
ACTIVE

32 BRIAN LANE

PALM COAST, FL 32137

EC13007418 (Exp: 08/31/2026) 386-585-4716
SCOTT PATRICK RAYMOND
Status Location Address State License Number
ACTIVE

61 FRENEAU LN

PALM COAST, FL 32137

RF11067787 (Exp: 08/31/2027)
CHARLES WEYANT
Status Location Address State License Number Phone
ACTIVE

PO BOX 1261

FLAGLER BEACH, FL 32136

CAC1815058 (Exp: 08/31/2026) (386)246-7745

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/06/2023 FINAL APPROVED AGAETANO
Note: 5/4/2023 - PREVIOUS INSPECTION NOTES 05-04-2023 1. Product Approval windows, entry doors and SGD stickers not on site. 2. Please submit a revision for the pop up outlets on both sides of the range. 3. Counter below the TV outlet not installed. 4. Please submit a revision to the building department for the laundry pantry area. A refrigerator and sink have been added. Proper outlet spacing is required. All electrical and plumbing lines need to be submitted. 5. Energy calcs do not match. Please revise to the building department and have on site for inspection. Inspection stopped.
ROW - FINAL INSPECTION 06/06/2023 FINAL APPROVED EMADISON
Note: ** 06/06/23 CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF INSPECTION ________________________________________________________________________________________________________________________ 5/4/2023 - PREVIOUS INSPECTION NOTES ** 05/04/23 AREA AROUND THE WATER METER BOX NEEDS COMPACTED MATERIAL TO FILL HOLE AND THEN SOD TO PREVENT WATER FROM PONDING AND EROSION
U -UTILITY RESIDENTIAL FINAL 05/04/2023 FINAL APPROVED DHANEY
ROW - FINAL INSPECTION 05/04/2023 Disapproved - NO FEE EMADISON
Note: ** 05/04/23 AREA AROUND THE WATER METER BOX NEEDS COMPACTED MATERIAL TO FILL HOLE AND THEN SOD TO PREVENT WATER FROM PONDING AND EROSION
BLD - BUILDING FINAL 05/04/2023 Disapproved - NO FEE AGAETANO
Note: 05-04-2023 1. Product Approval windows, entry doors and SGD stickers not on site. 2. Please submit a revision for the pop up outlets on both sides of the range. 3. Counter below the TV outlet not installed. 4. Please submit a revision to the building department for the laundry pantry area. A refrigerator and sink have been added. Proper outlet spacing is required. All electrical and plumbing lines need to be submitted. 5. Energy calcs do not match. Please revise to the building department and have on site for inspection. Inspection stopped.
LATH/BRICK/ WATER BARRIER 01/10/2023 APPROVED AGAETANO
Note: 01-10-2023 Note to builder, window in back is broken.
INSULATION 12/20/2022 APPROVED AGAETANO
FRAMING 12/16/2022 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2420 12-01-2022 1. Please submit and revise the electrical alterations. New closet in bedroom added and elimination of bedroom closet and entry closet that was eliminated. 2. Kitchen outlets were removed. 3. Microwave was added. Please revise and submit to the building department. 4. Please expose the kitchen microwave vent for inspection that is to be sealed at the roof deck. 5. Electrical contractor is listed as Inactive. 12-16-2022 Please add the sink in the laundry room and revise to the building department.
ALL ROUGH 12/01/2022 APPROVED - AS NOTED AGAETANO
Note: 12-01-2022 1. Please submit and revise the electrical alterations. New closet in bedroom added and elimination of bedroom closet and entry closet that was eliminated. 2. Kitchen outlets were removed. 3. Microwave was added. Please revise and submit to the building department. 4. Please expose the kitchen microwave vent for inspection that is to be sealed at the roof deck. 5. Electrical contractor is listed as Inactive.
FRAMING 12/01/2022 Disapproved - NO FEE AGAETANO
Note: 12-01-2022 1. Please provide bearing wall details for new proposed bearing wall. 2. Please submit and revise to the building department the altered framing in the bedroom and added/eliminated closets. Entry closet was eliminated and laundry room was made larger.
PLUMBING 2ND ROUGH 12/01/2022 APPROVED MGIBSON
TIE BEAM / LINTEL 10/04/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Call Greg before going to site. (386) 569-8447. Inspection was added 08-17-2022 - . DOCUMENTS: NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Permit not on site. R105.7 – Placement of Permit. Must be on site until the project is completed. 09-09-2022 - This is for a partial pour. Contractor will pour the left back of the building, install the LVL, and then request a second tie beam lintel inspection. Rebar has been tied and placed every other cell.
TIE BEAM / LINTEL 09/09/2022 PARTIALLY APPROVED AGAETANO
Note: THIS IS A REINSPECTION Call Greg before going to site. (386) 569-8447. Inspection was added 08-17-2022 - . DOCUMENTS: NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Permit not on site. R105.7 – Placement of Permit. Must be on site until the project is completed. 09-09-2022 - This is for a partial pour. Contractor will pour the left back of the building, install the LVL, and then request a second tie beam lintel inspection. Rebar has been tied and placed every other cell.
TIE BEAM / LINTEL 08/17/2022 Disapproved - NO FEE AGAETANO
Note: Call Greg before going to site. (386) 569-8447. Inspection was added 08-17-2022 - . DOCUMENTS: NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Permit not on site. R105.7 – Placement of Permit. Must be on site until the project is completed.
MONOLITHIC SLAB 07/26/2022 APPROVED AGAETANO
FOOTER 07/26/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION VISQUEEN (plastic) NEEDED AS PER CODE R320.1.6, R406.3.2 at footings.
FOOTER 07/22/2022 Disapproved - NO FEE AGAETANO
Note: VISQUEEN (plastic) NEEDED AS PER CODE R320.1.6, R406.3.2 at footings.
PLUMBING 1ST ROUGH UNDERGROUND 07/14/2022 APPROVED AGAETANO

Review History

Department Status Date In Date Out
MECH COMPLETE 05/31/2023 05/31/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 05/30/2023 05/30/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH HOLD 05/22/2023 05/26/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition
BLD COMPLETE 05/22/2023 05/26/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC HOLD 05/22/2023 05/22/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing NEC 2017 210.52 Kitchen
PLUM COMPLETE 05/22/2023 05/30/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
BLD COMPLETE 12/12/2022 12/13/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 09/07/2022 09/07/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ELEC COMPLETE 04/18/2022 04/18/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 04/05/2022 04/05/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC HOLD 04/05/2022 04/06/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2017 NEC REVIEW COMMENTS: Repeat Comments 1. Electrical Note #4, Electrical Plans for Bid purposes only. Plans are to be for construction. Bid Plans are not reviewable. FBC [A]107. 2. Electrical Note #6 – references FBCR. All electrical references where removed from the Code. 3. Provide load calculations per Article 220.82.
ZON HOLD 03/31/2022 03/31/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Only new electrical plan submitted. Repeat comment: Plans must state that exterior changes will match existing material and color Plans must show that all new windows and doors facing right of way (the canal) will have banding
ELEC HOLD 03/31/2022 03/31/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Notes are still wrong Florida uses the 2017 NEC 2. Did not give load calcs to show the new addition.
BLD COMPLETE 03/31/2022 03/31/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
MECH COMPLETE 03/31/2022 03/31/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 03/17/2022 03/17/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Consolidate (3) product approval sheets into one(1) sheet only for clarity as some FL Numbers are duplicated and are incorrectly described on the sheets - FBC 7th Ed. Sec. 107.3.
BLD HOLD 03/15/2022 03/17/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
ELEC HOLD 03/15/2022 03/15/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. In the electrical notes 6-9 reference the FRC 39 and 40 those are no longer in the code and you need to reference the correct codes. 2. Switches need to show what they are controlling. 3. Outlets in bathroom,laundry room and Back porch need to be GFCI protected. NEC 2017 210.8 4. Need show size of existing service and prove it can hold the new proposed addition.NEC 2017 220.83
MECH HOLD 03/15/2022 03/18/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Duct layout needs to be signed by the AC contractor 2. Energy Calcs need to be signed by the builder
PLUM COMPLETE 03/15/2022 03/17/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
ZON HOLD 03/15/2022 03/15/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Plans must state that exterior changes will match existing material and color Plans must show that new windows and doors facing right of way (the canal) will have banding

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 05/03/2023
PLAN REVIEW - REVISION ¤32.50 05/03/2023
SURCHARGE FS 533.721 ¤5.14 05/10/2022
SURCHARGE - FS 468.631 ¤7.71 05/10/2022
SITE PLAN 30 ¤30.00 05/10/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/10/2022
INSPECTION - RESIDENTIAL ¤343.75 05/10/2022
PLAN REVIEW - RESIDENTIAL ¤97.50 05/10/2022
Fees Total Due: ¤0.00 Total Paid: ¤579.10