Permit #2022030869
Permit Details
Status: COED
| Parcel Id: 05-11-31-5918-00000-1120 |
| CONDITIONED SPACE: 2208 sqft |
| GARAGE: 464 sqft |
| OPENED PORCH (WITH ROOF) : 244 sqft |
| OPENED PORCH (WITH ROOF) : 102 sqft |
| Total Square Footage: 3018 sqft |
| Block: 00000 |
| Subdivision: 2244 - VILLAGE AT PALM COAST PH 1 |
| Job Phone: 386-931-6577 |
| Location Address: 82 LONGVIEW WAY N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/01/2022 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: LEA JAMES L III |
|
Address 91 GREEN CIRCLE PALM COAST, FL 32164 |
| Lot: 1120 |
| Contracted Stated Job Value: ¤334,355.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
A PLUS HOME IMPROVEMENTS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CRC1327024 (Exp: 08/31/2026) | 386-263-2167 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
FERNANDO M FARIA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
23 FREELAND LANE PALM COAST, FL 32137 |
RF11067823 (Exp: 08/31/2027) | 386-569-4336 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
JOSE E ORTIZ JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
4601 E MOODY BLVD BUNNELL, FL 32110 |
SUITE B7 BUNNELL, FL 32110 |
RC29027619 (Exp: 08/31/2023) | 386-503-6922 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/20/2023 | FINAL APPROVED | RMARTIN |
| U-CROSS CONNECTION | 04/20/2023 | APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 04/20/2023 | FINAL APPROVED | EMADISON |
| Note: ** 04/20/23 BUILDER USED ** SEED AND STRAW** ALONG VACANT PROPERTY LINE ACCEPTABLE _________________________________________________________________________________________________________________________ ** 04/19/23 BUILDER NEEDS TO SOD ALL BARE EARTH AREAS ALONG LEFT SIDE PROPERTY LINE THAT WAS DISTURBED DURING CONSTRUCTION OF ON YOUR SITE ALSO SOD BARE SPOTS ALONG REAR PROPERTY LINE | |||
| U -UTILITY RESIDENTIAL FINAL | 04/20/2023 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 04/19/2023 | FINAL APPROVED | EMADISON |
| Note: Inspection scheduled and completed same day per Jordan Myers request. An executive decision by Jordan Myers was made for a first time courtesy of removing three 5x5 sections of driveway to inspect for base depth requirements. Next time builder understands that if the second part of the pre-pour is not scheduled that the ENTIRE paver driveway will have to be removed for a complete base inspection. On site with builder | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/19/2023 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9270 Inspection scheduled and completed same day per Jordan Myers request. An executive decision by Jordan Myers was made for a first time courtesy of removing three 5x5 sections of driveway to inspect for base depth requirements. Next time builder understands that if the second part of the pre-pour is not scheduled that the ENTIRE paver driveway will have to be removed for a complete base inspection. On site with builder. 4/10/2023 - PREVIOUS INSPECTION NOTES ** 04/10/23 BUILDER NEEDS TO REMOVE ALL PAVERS AS PAVERS WERE SET WITHOUT THE SECOND PRE-POUR INSPECTION TO ENSURE PAVER BASE WAS SPREAD AND COMPACTED TO THE APPROPRIATE DEPTH _________________________________________________________________________________________________________________________ 2/22/2023 NOTE TO INSPECTOR : PAVER NEED TO BE REMOVED DO TO PAVERS WERE LAID BEFORE THIS INSPECTION ------------------------------------------------------------------------------------------------ 2/21/2023 - PREVIOUS INSPECTION NOTES THIS IS NOT READY FOR THE SECOND INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED BEFORE THE INSPECTION WITH NO PAVER AT THE TIME OF INSPECTION SEE PHOTOS OF INSPECTION RESULTS AT THE TIME OF INSPECTION ---------------------------------------------------------------------------------------------- 2/17/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED AND WITH NO PAVERS AT THE TIME OF THE INSPECTION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/19/2023 | APPROVED | EMADISON |
| Note: ** 04/19/23 BUILDER NEEDS TO SOD ALL BARE EARTH AREAS ALONG LEFT SIDE PROPERTY LINE THAT WAS DISTURBED DURING CONSTRUCTION OF ON YOUR SITE ALSO SOD BARE SPOTS ALONG REAR PROPERTY LINE | |||
| ROW- PRE-APRON (PRE-POUR) | 04/18/2023 | APPROVED - AS NOTED | RGROSS |
| Note: Inspection scheduled and completed same day per Jordan Myers request. An executive decision by Jordan Myers was made for a first time courtesy of removing three 5x5 sections of driveway to inspect for base depth requirements. Next time builder understands that if the second part of the pre-pour is not scheduled that the ENTIRE paver driveway will have to be removed for a complete base inspection. On site with builder. 4/10/2023 - PREVIOUS INSPECTION NOTES ** 04/10/23 BUILDER NEEDS TO REMOVE ALL PAVERS AS PAVERS WERE SET WITHOUT THE SECOND PRE-POUR INSPECTION TO ENSURE PAVER BASE WAS SPREAD AND COMPACTED TO THE APPROPRIATE DEPTH _________________________________________________________________________________________________________________________ 2/22/2023 NOTE TO INSPECTOR : PAVER NEED TO BE REMOVED DO TO PAVERS WERE LAID BEFORE THIS INSPECTION ------------------------------------------------------------------------------------------------ 2/21/2023 - PREVIOUS INSPECTION NOTES THIS IS NOT READY FOR THE SECOND INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED BEFORE THE INSPECTION WITH NO PAVER AT THE TIME OF INSPECTION SEE PHOTOS OF INSPECTION RESULTS AT THE TIME OF INSPECTION ---------------------------------------------------------------------------------------------- 2/17/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED AND WITH NO PAVERS AT THE TIME OF THE INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 04/10/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/10/23 BUILDER NEEDS TO REMOVE ALL PAVERS AS PAVERS WERE SET WITHOUT THE SECOND PRE-POUR INSPECTION TO ENSURE PAVER BASE WAS SPREAD AND COMPACTED TO THE APPROPRIATE DEPTH _________________________________________________________________________________________________________________________ 2/22/2023 NOTE TO INSPECTOR : PAVER NEED TO BE REMOVED DO TO PAVERS WERE LAID BEFORE THIS INSPECTION ------------------------------------------------------------------------------------------------ 2/21/2023 - PREVIOUS INSPECTION NOTES THIS IS NOT READY FOR THE SECOND INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED BEFORE THE INSPECTION WITH NO PAVER AT THE TIME OF INSPECTION SEE PHOTOS OF INSPECTION RESULTS AT THE TIME OF INSPECTION ---------------------------------------------------------------------------------------------- 2/17/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED AND WITH NO PAVERS AT THE TIME OF THE INSPECTION | |||
| ELECTRIC - EARLY POWER | 04/03/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Approved release to FPL at 04/03/2023 10:33 AM | |||
| GRAVITY SEWER TEST | 03/14/2023 | APPROVED | AGAETANO |
| WINDOW NAILING | 03/14/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2320 1/26/23 will add a window nailing inspection to permit, schedule inspection when windows and rest of doors are installed 1/3/2023 - PREVIOUS INSPECTION NOTES 01/24/2023- Missing window in bath-missing entry doors- unable to verify water proofing and lath install without all componens in place-Call in for reinspection when all exterior doors and windows are installed 12/28/2022 - PREVIOUS INSPECTION NOTES 12-28-2022 1. Entry and garage doors as well as bathroom window not installed. Window nailing will need to be added AT INSULATION IF NOT IN AT INSULATION 01-09-2023 Entrt door and bathroom window not installed and a window nailing will be added. | |||
| U - SEWER TIE IN | 03/14/2023 | APPROVED | AGAETANO |
| ROW- PRE-APRON (PRE-POUR) | 02/21/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THIS IS NOT READY FOR THE SECOND INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED BEFORE THE INSPECTION WITH NO PAVER AT THE TIME OF INSPECTION SEE PHOTOS OF INSPECTION RESULTS AT THE TIME OF INSPECTION ---------------------------------------------------------------------------------------------- 2/17/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED AND WITH NO PAVERS AT THE TIME OF THE INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 02/17/2023 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR APRON AND PAVER RESTRAINTS BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED AND WITH NO PAVERS AT THE TIME OF THE INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 01/26/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: 1/26/23 will add a window nailing inspection to permit, schedule inspection when windows and rest of doors are installed 1/3/2023 - PREVIOUS INSPECTION NOTES 01/24/2023- Missing window in bath-missing entry doors- unable to verify water proofing and lath install without all componens in place-Call in for reinspection when all exterior doors and windows are installed 12/28/2022 - PREVIOUS INSPECTION NOTES 12-28-2022 1. Entry and garage doors as well as bathroom window not installed. Window nailing will need to be added AT INSULATION IF NOT IN AT INSULATION 01-09-2023 Entrt door and bathroom window not installed and a window nailing will be added. | |||
| LATH/BRICK/ WATER BARRIER | 01/24/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Inspector Notes from Inspection 2490 Inspector Notes from Inspection 2420 1/3/2023 - PREVIOUS INSPECTION NOTES 01/24/2023- Missing window in bath-missing entry doors- unable to verify water proofing and lath install without all componens in place-Call in for reinspection when all exterior doors and windows are installed 12/28/2022 - PREVIOUS INSPECTION NOTES 12-28-2022 1. Entry and garage doors as well as bathroom window not installed. Window nailing will need to be added AT INSULATION IF NOT IN AT INSULATION 01-09-2023 Entrt door and bathroom window not installed and a window nailing will be added. | |||
| INSULATION | 01/09/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 1/3/2023 - PREVIOUS INSPECTION NOTES 12/28/2022 - PREVIOUS INSPECTION NOTES 12-28-2022 1. Entry and garage doors as well as bathroom window not installed. Window nailing will need to be added AT INSULATION IF NOT IN AT INSULATION 01-09-2023 Entrt door and bathroom window not installed and a window nailing will be added. | |||
| ALL ROUGH | 01/04/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: 1/3/2023 - PREVIOUS INSPECTION NOTES 12/28/2022 - PREVIOUS INSPECTION NOTES 12-28-2022 1. Entry and garage doors as well as bathroom window not installed. Window nailing will need to be added AT INSULATION IF NOT IN AT INSULATION | |||
| ALL ROUGH | 01/03/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 12/28/2022 - PREVIOUS INSPECTION NOTES 12-28-2022 1. Mid point bracing.PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL 2. Entry and garage doors as well as bathroom window not installed. Window nailing will need to be added. 3. Dryer vents not installed at roof. 4. Mechanical drawings not on site. Inspection stopped. 01-03-2023 Dryer vent and bath vent not installed to the outdoors. | |||
| ALL ROUGH | 12/28/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 12-28-2022 1. Mid point bracing.PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL 2. Entry and garage doors as well as bathroom window not installed. Window nailing will need to be added. 3. Dryer vents not installed at roof. 4. Mechanical drawings not on site. Inspection stopped. | |||
| WALL SHEATHING | 12/27/2022 | APPROVED | AGAETANO |
| Note: 12-27-2022 Wall sheathing not needed. | |||
| ROOF VALLEY & METAL | 12/27/2022 | APPROVED | AGAETANO |
| ELECTRIC-TUG | 12/21/2022 | APPROVED | RMARTIN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/20/2022 | APPROVED | AGAETANO |
| Note: 12/16/2022 - PREVIOUS INSPECTION NOTES 12-16-2022 Trus layout not on site. NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/16/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 12-16-2022 Trus layout not on site. NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. | |||
| TIE BEAM / LINTEL | 08/09/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 08/08/2022 | CANCELLED BY APPLICANT | LMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 08/03/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/13/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/12/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 04/18/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 04/18/2023 | 04/18/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM CAN NOT SCHEDULE FINAL SURVEY. MUST COMPLETE PREAPRON PRIOR | |||
| ENGIN1 | COMPLETE | 08/03/2022 | 08/03/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/03/2022 | 08/03/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/28/2022 | 03/29/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/25/2022 | 03/28/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/25/2022 | 03/28/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: Repeat Comments Provide correction of the following product approval per F.S. 553.842: 1. Swing door - need specific number as there are several models to choose. (22363.#) 2. OK 3. OK 4. OK 5. OK 6. OK 7. Wood connector - missing FL No. | |||
| BLD | HOLD | 03/24/2022 | 03/25/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: Repeat Comments Provide correction of the following product approval per F.S. 553.842: 1. Swing door - need specific number as there are several models to choose. (22363.#) 2. OK 3. OK 4. Concrete tile roofing material - cannot be found on DBPR website. (7849.#) 5. OK 6. OK 7. Wood connector - missing FL No. | |||
| ZON | HOLD | 03/24/2022 | 03/24/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM please upload the original landscape plan showing all foundation plantings and trees that will be on the property with ST Augustine grass and note that it will have irrigation. all on one plan as i will need to stamp one plan only | |||
| BLD | HOLD | 03/16/2022 | 03/16/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide correction of the following product approval per F.S. 553.842: 1. Swing door - need specific number as there are several models to choose. 2. Gadage door - design pressure is less than required. See Sheet GN. 3. Mullion - need specific number as there are several models to choose.- 4. Concrete tile roofing material - cannot be found on DBPR website. 5. Roof vent - cannot be found on DBPR website. 6. Roof underlayment - cannot be found on DBPR website. 7. Wood connector - missing FL No. | |||
| CUSVC | COMPLETE | 03/16/2022 | 03/17/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 03/16/2022 | 03/16/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/16/2022 | 03/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/16/2022 | 03/23/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/16/2022 | 03/18/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/16/2022 | 03/23/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/16/2022 | 03/16/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Landscape Plan: St Augustine grass requires irrigation please specify on plan irrigation will be put in. | |||
| PLFM | COMPLETE | 03/16/2022 | 03/17/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM No comments |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 04/21/2023 |
| IMPACT FEE FIRE | ¤388.65 | 04/21/2023 |
| IMPACT FEE PARKS | ¤1,455.13 | 04/21/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/21/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/21/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 04/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/21/2023 |
| CONNECTION FEES | ¤25.00 | 04/01/2022 |
| SURCHARGE FS 533.721 | ¤12.74 | 04/01/2022 |
| SURCHARGE - FS 468.631 | ¤19.12 | 04/01/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/01/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/01/2022 |
| SW ENG PRE APRON | ¤30.00 | 04/01/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/01/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/01/2022 |
| SEWER INSPECTION | ¤25.00 | 04/01/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 04/01/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 04/01/2022 |
| SITE PLAN 30 | ¤30.00 | 04/01/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/01/2022 |
| WATER-METER | ¤467.09 | 04/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/01/2022 |
| INSPECTION - RESIDENTIAL | ¤921.25 | 04/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤261.30 | 04/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,555.54 |