Permit #2022031226

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01420-0110
CONDITIONED SPACE: 1966 sqft
GARAGE: 685 sqft
OPENED PORCH (WITH ROOF) : 361 sqft
OPENED PORCH (WITH ROOF) : 182 sqft
Total Square Footage: 3194 sqft
Block: 01420
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: (386)931-0785
Location Address: 76 EDITH POPE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/06/2022
NOC: RECORDED
Applicant name: ROY CHARLES WALDHAUER
Owner: FAY TAMI & BY THE SHORE INC

Address

29 EDGELY LANE

PALM COAST, FL 32164

Lot: 0110
Contracted Stated Job Value: ¤275,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

BY THE SHORE INC.
Status Location Address State License Number Phone Fax
ACTIVE

1600 N STATE STREET # 102

,

CRC1327300 (Exp: 08/31/2026) 386-263-8272 386-263-8289

Sub Contractors

THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/20/2023 APPROVED RSIMS
Note: 9/11/2023 - PREVIOUS INSPECTION NOTES 9/11/23: 1). Range anti-tip device not installed. 2). Kitchen Microwave exhaust vent is not firestop sealed at the top of the cabinet going into pipe chase. (Chase prevents visual verification of sealing at ceiling drywall as required.). 3). AHU does not have the heater core/breaker sticker on the unit (FBC1303.1) 4). Attic pull down stairs- first step is over the 12" maximum spacing. 5). Outlet next to ODU is loose in the box. 6). AC condenser breaker is incorrect size as identified on the panel schedule. 7). Interior garage door is missing the door seal on left & top jamb. 3/20/23: Need revision submitted to & approved by the City for the different shingles (CertainTeed - Landmark) loaded on the roof than what was originally submitted (Owens Corning) before Building Final can be approved. 8/1/23: Note: Master bathroom closet switch is behind the door. Check for correction at building final.
BLD - BUILDING FINAL 09/11/2023 Disapproved -FEE REQUIRED RSIMS
Note: 9/11/23: 1). Range anti-tip device not installed. 2). Kitchen Microwave exhaust vent is not firestop sealed at the top of the cabinet going into pipe chase. (Chase prevents visual verification of sealing at ceiling drywall as required.). 3). AHU does not have the heater core/breaker sticker on the unit (FBC1303.1) 4). Attic pull down stairs- first step is over the 12" maximum spacing. 5). Outlet next to ODU is loose in the box. 6). AC condenser breaker is incorrect size as identified on the panel schedule. 7). Interior garage door is missing the door seal on left & top jamb. 3/20/23: Need revision submitted to & approved by the City for the different shingles (CertainTeed - Landmark) loaded on the roof than what was originally submitted (Owens Corning) before Building Final can be approved. 8/1/23: Note: Master bathroom closet switch is behind the door. Check for correction at building final.
ROW - FINAL APRON (AFTER POUR) 09/06/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 09/06/2023 FINAL APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 09/06/2023 FINAL APPROVED JHARDING
ROW- PROJECT STATUS 08/25/2023 APPROVED PFLANAGAN
Note: MEET WITH THE CONTRACTOR ABOUT DRAINAGE
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/25/2023 APPROVED - AS NOTED PFLANAGAN
Note: THE DRAINAGE ON THE LEFT OF THE PROPERTY LINE IS INSIDE THERE LOT AND CATCHING ALL STORMWATER FROM HOUSE 78 SO IT IS SHARING A COMMON SWALE -------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES THE DRAINAGE PATTERN ON THE LEFT SIDE NEEDS TO HAVE A COMMON SWALE DO TO THE NEW CONSTRUCTION TO THE LEFT OF YOUR LOT.
ROW FIELD SURVEY /GRADING CERTIFICATION 08/25/2023 APPROVED PFLANAGAN
Note: Inspector Notes from Inspection 9463 THE DRAINAGE ON THE LEFT OF THE PROPERTY LINE IS INSIDE THERE LOT AND CATCHING ALL STORMWATER FROM HOUSE 78 SO IT IS SHARING A COMMON SWALE -------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES THE DRAINAGE PATTERN ON THE LEFT SIDE NEEDS TO HAVE A COMMON SWALE DO TO THE NEW CONSTRUCTION TO THE LEFT OF YOUR LOT.
ELECTRIC - EARLY POWER 08/02/2023 APPROVED RSIMS
Note: 8/2/23: FPL emailed to release power. 8/1/2023 - PREVIOUS INSPECTION NOTES 8/1/23: ** Service feeds need to be tied in for Overhead Power (only). Note: Master bathroom closet switch is behind the door. Check for correction at building final.
ELECTRIC - EARLY POWER 08/01/2023 Disapproved - NO FEE RSIMS
Note: 8/1/23: ** Service feeds need to be tied in for Overhead Power (only). Note: Master bathroom closet switch is behind the door. Check for correction at building final.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/31/2023 Disapproved - NO FEE PFLANAGAN
Note: THE DRAINAGE PATTERN ON THE LEFT SIDE NEEDS TO HAVE A COMMON SWALE DO TO THE NEW CONSTRUCTION TO THE LEFT OF YOUR LOT.
U-CROSS CONNECTION 07/26/2023 APPROVED - AS NOTED JHARDING
Note: No cross connections.
ROW- PRE-APRON (PRE-POUR) 06/28/2023 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN DRIVEWAY At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------------------------------------------------- 6/27/2023 - PREVIOUS INSPECTION NOTES 1) SOIL BEHIND THE CULVERT IS TO SOFT NEED TO COMPACT SOIL MORE 2) WITH RAIN DIRT HAS WASHED UP AGAINST THE CULVERT NEED TO DIG DIRT THAT WASHED TO CULVERT
ROW- PRE-APRON (PRE-POUR) 06/27/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) SOIL BEHIND THE CULVERT IS TO SOFT NEED TO COMPACT SOIL MORE 2) WITH RAIN DIRT HAS WASHED UP AGAINST THE CULVERT NEED TO DIG DIRT THAT WASHED TO CULVERT
U - SEWER TIE IN 06/27/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 06/27/2023 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 05/25/2023 APPROVED CSTONE
Note: 5/1/2023 11:34:07 AM- PREVIOUS INSPECTION NOTES Not ready- Exterior, Interior, Dumspter Stucco, Drywall, Siding etc need to be done. Dumpster will need to move
LATH/BRICK/ WATER BARRIER 05/12/2023 APPROVED JWALKER
Note: 5/9/2023 - PREVIOUS INSPECTION NOTES 5/9/23: Left side of house-Penetrations into CMU wall require wire lath. Including at Lineset penetration. (foam alone is not approved.)
LATH/BRICK/ WATER BARRIER 05/09/2023 Disapproved - NO FEE RSIMS
Note: 5/9/23: Left side of house-Penetrations into CMU wall require wire lath. Including at Linest penetration. (foam along is not approved.)
PEP TANK INSTALLATION REQUEST 04/28/2023 Disapproved - NO FEE CSTONE
Note: Not ready- Exterior, Interior, Dumspter Stucco, Drywall, Siding etc need to be done. Dumpster will need to move
INSULATION 04/25/2023 APPROVED RSIMS
Note: 4/24/2023 - PREVIOUS INSPECTION NOTES 4/24/23: Still have incomplete firestop at two locations. Added FS on the floor for easier identification. * Master bathroom at top plate penetration for water pipe. (behind nail plate). * Front right bedroom entry at top plate for wires groups at both penetrations. 4/21/2023 - PREVIOUS INSPECTION NOTES 4/21/23: Marked on wall/stud with FS in blue marker below areas. 1). Missing fireblocking/firestop at top plate area of front entry column. 2). Missing/incomplete firestop at 4 locations inside the house. (2 on left side and 2 on right side). 3). Incomplete firestop at top plate in garage for dryer exhaust & PVC vent stack.
INSULATION 04/24/2023 Disapproved - NO FEE RSIMS
Note: 4/24/23: Still have incomplete firestop at two locations. Added FS on the floor for easier identification. * Master bathroom at top plate penetration for water pipe. (behind nail plate). * Front right bedroom entry at top plate for wires groups at both penetrations. 4/21/2023 - PREVIOUS INSPECTION NOTES 4/21/23: Marked on wall/stud with FS in blue marker below areas. 1). Missing fireblocking/firestop at top plate area of front entry column. 2). Missing/incomplete firestop at 4 locations inside the house. (2 on left side and 2 on right side). 3). Incomplete firestop at top plate in garage for dryer exhaust & PVC vent stack.
INSULATION 04/21/2023 Disapproved - NO FEE RSIMS
Note: 4/21/23: Marked on wall/stud with FS in blue marker below areas. 1). Missing fireblocking/firestop at top plate area of front entry column. 2). Missing/incomplete firestop at 4 locations inside the house. (2 on left side and 2 on right side). 3). Incomplete firestop at top plate in garage for dryer exhaust & PVC vent stack.
ALL ROUGH 04/14/2023 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2467 3/20/23: Need revision submitted to & approved by the City for the different shingles (CertainTeed - Landmark) loaded on the roof than what was originally submitted (Owens Corning) before Building Final can be approved. 3/16/2023 - PREVIOUS INSPECTION NOTES 3/15/23: Previously listed deficiency is not resolved. Flashing cannot run across the valley because there is no effective way to seal the area from wind blown rain and/or rodents (G2402.9) 3/14/2023 - PREVIOUS INSPECTION NOTES 3/14/23: Please have Porta John moved from the adjacent swale of the adjacent private property to the building site. 1). 5" x 5" flashing at front entry is installed incorrectly. Flashing must run up the length of the vertical wall and be sealed to the wall as required.
ROOF VALLEY & METAL 03/20/2023 APPROVED - AS NOTED RSIMS
Note: 3/20/23: Need revision submitted to & approved by the City for the different shingles (CertainTeed - Landmark) loaded on the roof than what was originally submitted (Owens Corning) before Building Final can be approved. 3/16/2023 - PREVIOUS INSPECTION NOTES 3/15/23: Previously listed deficiency is not resolved. Flashing cannot run across the valley because there is no effective way to seal the area from wind blown rain and/or rodents (G2402.9) 3/14/2023 - PREVIOUS INSPECTION NOTES 3/14/23: Please have Porta John moved from the adjacent swale of the adjacent private property to the building site. 1). 5" x 5" flashing at front entry is installed incorrectly. Flashing must run up the length of the vertical wall and be sealed to the wall as required.
ROOF VALLEY & METAL 03/16/2023 Disapproved -FEE REQUIRED RSIMS
Note: 3/15/23: Previously listed deficiency is not resolved. Flashing cannot run across the valley because there is no effictive way to seal the area from wind blown rain and/or rodents (G2402.9) 3/14/2023 - PREVIOUS INSPECTION NOTES 3/14/23: Please have Porta John moved from the adjacent swale of the adjacent private property to the building site. 1). 5" x 5" flashing at front entry is installed incorrectly. Flashing must run up the length of the vertical wall and be sealed to the wall as required.
ROOF VALLEY & METAL 03/14/2023 Disapproved - NO FEE RSIMS
Note: 3/14/23: Please have Porta John moved from the adjacent swale of the adjacent private property to the building site. 1). 5" x 5" flashing at front entry is installed incorrectly. Flashing must run up the length of the vertical wall and be sealed to the wall as required.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/09/2023 APPROVED BTAYLOR
Note: 1/24/2023 - PREVIOUS INSPECTION NOTES Prints call for truss system. Roof has been conventional framed. Please submit a revision to the building department showing as built. Include wood sizes, beam consturction, ceiling construction, anchors any bearing walls etc.
WALL SHEATHING 01/24/2023 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/24/2023 Disapproved - NO FEE JWALKER
Note: Prints call for truss system. Roof has been conventional framed. Please submit a revision to the building department showing as built. Include wood sizes, beam consturction, ceiling construction, anchors any bearing walls etc.
TIE BEAM / LINTEL 10/21/2022 APPROVED RSIMS
FOUND SURVEY APPROVED (OFFICE) 10/13/2022 APPROVED TBAKER
MONOLITHIC SLAB 09/20/2022 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 08/05/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 07/13/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 03/21/2023 03/23/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 03/03/2023 03/07/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 02/22/2023 02/23/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Proposed 2 x 12 rafters are over spanned. Max span for 2 x 12 #2 SYP is 19 feet 6 inches, per the WFCM.
ENGIN1 COMPLETE 10/13/2022 10/13/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/13/2022 10/13/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 06/08/2022 06/09/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC HOLD 05/13/2022 05/13/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Pool equipment still on electric page
MECH COMPLETE 05/13/2022 05/13/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 05/13/2022 05/13/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SWALE COMPLETE 04/19/2022 06/16/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 04/18/2022 04/25/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Following comments are for the Product Approvals Per F.S. 471.025 and F.A.C. 61 G15-23.005. a. FL 12590.1 – Not Current Swing Door b. FL 23752.1 – Not Current Soffit Material c. Wood Connectors, Wood Anchors and Truss Plate. Not Provided.
CUSVC COMPLETE 04/18/2022 04/21/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC HOLD 04/18/2022 04/19/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electric load calcs need to show pool equipment.
ENGIN1 COMPLETE 04/18/2022 04/19/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 04/18/2022 04/25/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 04/18/2022 04/19/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Plans show R38 insulation in attic with vented soffit. Energy Calcs say R20 with unvented soffit. Revise to match
SW1 COMPLETE 04/18/2022 04/25/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 04/18/2022 04/19/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 09/18/2023
SW ENG REINSPECTION 20 ¤20.00 09/18/2023
SW ENG REINSPECTION 30 ¤30.00 09/18/2023
REINSPECTION RESIDENTIAL ¤40.00 09/18/2023
REINSPECTION RESIDENTIAL ¤40.00 09/18/2023
CONNECTION FEES ¤1,077.88 07/06/2022
WATER- TURN ON ¤25.00 07/06/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/06/2022
INSPECTION - RESIDENTIAL ¤756.25 07/06/2022
PLAN REVIEW - RESIDENTIAL ¤214.50 07/06/2022
SW ENG - REVIEW 20 ¤20.00 07/06/2022
SW ENG RES REVIEW 200 ¤200.00 07/06/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 07/06/2022
SEWER CREDIT (¤1,466.00) 07/06/2022
SEWER INSPECTION ¤25.00 07/06/2022
SEWER CAPITAL FACILITY ¤4,939.76 07/06/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 07/06/2022
SITE PLAN 30 ¤30.00 07/06/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 07/06/2022
IMPACT FEE FIRE ¤388.65 07/06/2022
IMPACT FEE PARKS ¤1,455.13 07/06/2022
IMPACT FEE SCHOOL ¤3,600.00 07/06/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 07/06/2022
WATER -IRRIGATION INSPECTION ¤25.00 07/06/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 07/06/2022
SURCHARGE FS 533.721 ¤8.37 07/06/2022
SURCHARGE - FS 468.631 ¤12.56 07/06/2022
SW ENG - FOUNDATION SURVEY ¤20.00 07/06/2022
SW ENG INSPECTION 80 ¤80.00 07/06/2022
SW ENG PRE APRON ¤30.00 07/06/2022
Fees Total Due: ¤0.00 Total Paid: ¤16,924.37