I want to search for...

Permit #2022031364

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00300-0040
CONDITIONED SPACE: 2117 sqft
GARAGE: 431 sqft
OPENED PORCH (WITH ROOF) : 224 sqft
Total Square Footage: 2772 sqft
Block: 00300
Subdivision: 0 -
Job Phone: (386)437-1508
Location Address: 324 UNDERWOOD TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/27/2022
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: JM PROPERTIES X LLC

Address

PO BOX 9

CISSNA PARK, IL 60924

Lot: 0040
Contracted Stated Job Value: ¤230,000.00
Job Description: single family residence
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
MICHAEL MATTHEW SANKOSWSKI
Status Location Address State License Number Phone
ACTIVE

3 SEAMANSHIP TRAIL

PALM COAST, FL 32164

CAC1818816 (Exp: 08/31/2026) 386-316-4401
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/09/2024 FINAL APPROVED BTAYLOR
Note: 1/29/2024 - PREVIOUS INSPECTION NOTES 1/29/24: 1). AHU model number does not match energy calcs. 2). AHU needs to be sealed where ducts enter ceiling with Fire retardent material (No caulk) per FBC-R302.11 3). Need to seal holes in ceiling at all thread rod for AHU & sealtite at front of garage. (no caulk per FBC-R302.11) 4). Need to properly seal opening on interior garage wall at UFER ground rod. 5). Missing 2 supply registers in main living area. 6). No termite bond posted or on-site.
BLD - BUILDING FINAL 01/29/2024 Disapproved -FEE REQUIRED RSIMS
Note: 1/29/24: 1). AHU model number does not match energy calcs. 2). AHU needs to be sealed where ducts enter ceiling with Fire retardent material (No caulk) per FBC-R302.11 3). Need to seal holes in ceiling at all thread rod for AHU & sealtite at front of garage. (no caulk per FBC-R302.11) 4). Need to properly seal opening on interior garage wall at UFER ground rod. 5). Missing 2 supply registers in main living area. 6). No termite bond posted or on-site.
ROW - STORMWATER FINAL 01/29/2024 APPROVED - AS NOTED FSLADISH
Note: 1/29/24 BERMS HAVE BEEN RIASED AND A SMALL INSIDE SWALE IS PRESENT AT THE TIME OF THIS INSPECTION. PASSING THIS AS NOTED. DRY AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ 1/11/2024 - PREVIOUS INSPECTION NOTES 1/11/24=BOTH SIDES OF THE HOUSE REQUIRE INSTALLATION OF A BERM AND A SWALE TO CARRY WATER TO THE FRONT:The subject lot drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6)
ROW - STORMWATER FINAL 01/11/2024 Disapproved - NO FEE GBERTOLA
Note: 1/11/24=BOTH SIDES OF THE HOUSE REQUIRE INSTALLATION OF A BERM AND A SWALE TO CARRY WATER TO THE FRONT:The subject lot drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6)
ROW - FINAL APRON (AFTER POUR) 01/11/2024 APPROVED GBERTOLA
Note: 1/11/24= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/4/24 SMALL BERMS HAVE BEEN ADDED ON BOTH SIDE PROPERTY LINES. WHILE IT WILL WORK AT THIS TIME, THESE AREAS WILL NED TO BE MONITORED FOR BLOWOUTS. AT THE TIME OF THIS INSPECTION IT MEETS THE CITY'S MINIMUM STANDARDS FOR DRAINAGE. SWALE ELEVATIONS CORRECTION ON FINAL SURVEY SEEM TO BE CORRECT IN THE FIELD. THE SWALE IS DRY AT THIS TIME. PASSING THIS FIELD SURVEY AS NOTED. AS A COURTESY I AM LETING YOU KNOW THAT BEFORE ROW FINAL PASAGE YOU WILL NEED TO LOWER THE SOD AT THE ROAD EDGE TO ALLOW WATER TO DRAIN FROM THE ROAD INTO THE SWALE AS INTENDED. OTHER CORRECTIONS MAY BE NECCESSARY BEFORE ROW PASSAGE. PLEASE SEE PHOTO FOR REFERENCE. 12/13/2023 - PREVIOUS INSPECTION NOTES 12/13/23 ** UPON WALKING SITE DETERMINED THAT IT DOES NOT MATCH FINAL SURVEY INDICATIONS. BOTH SIDES ARE FLOWINING INTO ADJACENT LOTS. THIS WILL NEED TO BE CORRECTED BEFORE FIELD SURVEY WILL PASS. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) __________________________________________________________________________________________________________________ 12/8/2023 - PREVIOUS INSPECTION NOTES 12/8/23 ** YOU CANNOT SUBMIT A FIELD SURVEY INSPECTION BEFORE A FINAL SURVEY HAS BEEN SUBMITTED AND APPROVED.
ROW - FINAL APRON (AFTER POUR) 01/05/2024 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 9465 1/4/24 SMALL BERMS HAVE BEEN ADDED ON BOTH SIDE PROPERTY LINES. WHILE IT WILL WORK AT THIS TIME, THESE AREAS WILL NED TO BE MONITORED FOR BLOWOUTS. AT THE TIME OF THIS INSPECTION IT MEETS THE CITY'S MINIMUM STANDARDS FOR DRAINAGE. SWALE ELEVATIONS CORRECTION ON FINAL SURVEY SEEM TO BE CORRECT IN THE FIELD. THE SWALE IS DRY AT THIS TIME. PASSING THIS FIELD SURVEY AS NOTED. AS A COURTESY I AM LETING YOU KNOW THAT BEFORE ROW FINAL PASAGE YOU WILL NEED TO LOWER THE SOD AT THE ROAD EDGE TO ALLOW WATER TO DRAIN FROM THE ROAD INTO THE SWALE AS INTENDED. OTHER CORRECTIONS MAY BE NECCESSARY BEFORE ROW PASSAGE. PLEASE SEE PHOTO FOR REFERENCE. 12/13/2023 - PREVIOUS INSPECTION NOTES 12/13/23 ** UPON WALKING SITE DETERMINED THAT IT DOES NOT MATCH FINAL SURVEY INDICATIONS. BOTH SIDES ARE FLOWINING INTO ADJACENT LOTS. THIS WILL NEED TO BE CORRECTED BEFORE FIELD SURVEY WILL PASS. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) __________________________________________________________________________________________________________________ 12/8/2023 - PREVIOUS INSPECTION NOTES 12/8/23 ** YOU CANNOT SUBMIT A FIELD SURVEY INSPECTION BEFORE A FINAL SURVEY HAS BEEN SUBMITTED AND APPROVED.
U -UTILITY RESIDENTIAL FINAL 01/05/2024 FINAL APPROVED JHARDING
ROW FIELD SURVEY /GRADING CERTIFICATION 01/04/2024 APPROVED - AS NOTED FSLADISH
Note: 1/4/24 SMALL BERMS HAVE BEEN ADDED ON BOTH SIDE PROPERTY LINES. WHILE IT WILL WORK AT THIS TIME, THESE AREAS WILL NED TO BE MONITORED FOR BLOWOUTS. AT THE TIME OF THIS INSPECTION IT MEETS THE CITY'S MINIMUM STANDARDS FOR DRAINAGE. SWALE ELEVATIONS CORRECTION ON FINAL SURVEY SEEM TO BE CORRECT IN THE FIELD. THE SWALE IS DRY AT THIS TIME. PASSING THIS FIELD SURVEY AS NOTED. AS A COURTESY I AM LETING YOU KNOW THAT BEFORE ROW FINAL PASAGE YOU WILL NEED TO LOWER THE SOD AT THE ROAD EDGE TO ALLOW WATER TO DRAIN FROM THE ROAD INTO THE SWALE AS INTENDED. OTHER CORRECTIONS MAY BE NECCESSARY BEFORE ROW PASSAGE. PLEASE SEE PHOTO FOR REFERENCE. 12/13/2023 - PREVIOUS INSPECTION NOTES 12/13/23 ** UPON WALKING SITE DETERMINED THAT IT DOES NOT MATCH FINAL SURVEY INDICATIONS. BOTH SIDES ARE FLOWINING INTO ADJACENT LOTS. THIS WILL NEED TO BE CORRECTED BEFORE FIELD SURVEY WILL PASS. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) __________________________________________________________________________________________________________________ 12/8/2023 - PREVIOUS INSPECTION NOTES 12/8/23 ** YOU CANNOT SUBMIT A FIELD SURVEY INSPECTION BEFORE A FINAL SURVEY HAS BEEN SUBMITTED AND APPROVED.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/13/2023 Disapproved - NO FEE TPOLACEK
Note: 12/13/23 ** UPON WALKING SITE DETERMINED THAT IT DOES NOT MATCH FINAL SURVEY INDICATIONS. BOTH SIDES ARE FLOWINING INTO ADJACENT LOTS. THIS WILL NEED TO BE CORRECTED BEFORE FIELD SURVEY WILL PASS. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) __________________________________________________________________________________________________________________ 12/8/2023 - PREVIOUS INSPECTION NOTES 12/8/23 ** YOU CANNOT SUBMIT A FIELD SURVEY INSPECTION BEFORE A FINAL SURVEY HAS BEEN SUBMITTED AND APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/13/2023 APPROVED TPOLACEK
Note: 12/13/23 ** ACCORDING TO FINAL SURVEY FLOW IDICATED WILL WORK. 12/11/2023 - PREVIOUS INSPECTION NOTES 12/11/23 ** PLEASE READ PREVIOUS INSPECTION NOTES AND MAKE CORRECTIONS TO SWALE PLAN ELEVATIONS SHOWN ON SURVEY.YOUR SURVEY IS SHOWING THE FRONT SWALE GOING FROM THE RIGHT (HIGH) SIDE PROPERTY LINE AT 22.68 GOING TO A 22.75 TO A 22.85 ON THE LEFT (LOW) SIDE PROPERTY LINE. THIS FLOWS UPHILL AGAINST THE DRAINAGE REQUIRED IN THE SWALE PLAN DIAGRAM. THE SWALE MUST HAVE POSITIVE DRAINAGE FLOW IN THE DIRECTION INDICATED IN THE SWALE PLAN. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/11/2023 Disapproved -FEE REQUIRED TPOLACEK
Note: 12/11/23 ** PLEASE READ PREVIOUS INSPECTION NOTES AND MAKE CORRECTIONS TO SWALE PLAN ELEVATIONS SHOWN ON SURVEY.YOUR SURVEY IS SHOWING THE FRONT SWALE GOING FROM THE RIGHT (HIGH) SIDE PROPERTY LINE AT 22.68 GOING TO A 22.75 TO A 22.85 ON THE LEFT (LOW) SIDE PROPERTY LINE. THIS FLOWS UPHILL AGAINST THE DRAINAGE REQUIRED IN THE SWALE PLAN DIAGRAM. THE SWALE MUST HAVE POSITIVE DRAINAGE FLOW IN THE DIRECTION INDICATED IN THE SWALE PLAN. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/08/2023 Disapproved - NO FEE TPOLACEK
Note: 12/8/23 ** YOU CANNOT SUBMIT A FIELD SURVEY INSPECTION BEFORE A FINAL SURVEY HAS BEEN SUBMITTED AND APPROVED.
FINAL SURVEY (OFFICE USE ONLY) 11/17/2023 Disapproved - NO FEE FSLADISH
Note: 12/11/23 ** PLEASE READ PREVIOUS INSPECTION NOTES AND MAKE CORRECTIONS TO SWALE PLAN ELEVATIONS SHOWN ON SURVEY.YOUR SURVEY IS SHOWING THE FRONT SWALE GOING FROM THE RIGHT (HIGH) SIDE PROPERTY LINE AT 22.68 GOING TO A 22.75 TO A 22.85 ON THE LEFT (LOW) SIDE PROPERTY LINE. THIS FLOWS UPHILL AGAINST THE DRAINAGE REQUIRED IN THE SWALE PLAN DIAGRAM. THE SWALE MUST HAVE POSITIVE DRAINAGE FLOW IN THE DIRECTION INDICATED IN THE SWALE PLAN. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. 11/17/23 YOUR SURVEY IS SHOWING THE FRONT SWALE GOING FROM THE RIGHT (HIGH) SIDE PROPERTY LINE AT 22.68 GOING TO A 22.75 TO A 22.85 ON THE LEFT (LOW) SIDE PROPERTY LINE. THIS FLOWS UPHILL AGAINST THE DRAINAGE REQUIRED IN THE SWALE PLAN DIAGRAM. THE SWALE MUST HAVE POSITIVE DRAINAGE FLOW IN THE DIRECTION INDICATED IN THE SWALE PLAN. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ELECTRIC - EARLY POWER 08/03/2023 APPROVED - AS NOTED BTAYLOR
Note: 7/31/2023 - PREVIOUS INSPECTION NOTES 7-31-23 1. Not ready? 8-3-23 1. Emailed FPL at 1:15.
ROW- PRE-APRON (PRE-POUR) 08/01/2023 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH IN THE CONCRETE. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved
ELECTRIC - EARLY POWER 07/31/2023 Disapproved - NO FEE BTAYLOR
Note: 7-31-23 1. Not ready?
GRAVITY SEWER TEST 02/08/2023 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 MEET WITH TYLER AND AMERICAN LEAK DETECTOR AT JOB SITE, FIRST ROUGH PLUMBING IS APPROVED AND A RECORDED REPORT FOR WILL BE FORWARDED TO PATRICK BUCKLEY. ALSO PERMISSION WAS GIVEN TO INSTALL DOORS ONLY
U - SEWER TIE IN 02/08/2023 APPROVED MGIBSON
INSULATION 02/07/2023 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 01/17/2023 APPROVED BTAYLOR
U-CROSS CONNECTION 01/04/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
PLUMBING 1ST ROUGH UNDERGROUND 12/28/2022 APPROVED - AS NOTED MGIBSON
Note: MEET WITH TYLER AND AMERICAN LEAK DETECTOR AT JOB SITE, FIRST ROUGH PLUMBING IS APPROVED AND A RECORDED REPORT FOR WILL BE FORWARDED TO PATRICK BUCKLEY. ALSO PERMISSION WAS GIVEN TO INSTALL DOORS ONLY
ALL ROUGH 12/12/2022 APPROVED BTAYLOR
WALL SHEATHING 12/07/2022 APPROVED BTAYLOR
ROOF VALLEY & METAL 12/06/2022 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/18/2022 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 08/31/2022 APPROVED TBAKER
TIE BEAM / LINTEL 08/17/2022 APPROVED BTAYLOR
MONOLITHIC SLAB 08/03/2022 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 07/19/2022 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
MECH COMPLETE 12/20/2023 12/29/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 12/08/2023 12/08/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
ENGIN1 COMPLETE 08/30/2022 08/31/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/30/2022 08/30/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/06/2022 05/06/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 05/06/2022 05/13/2022
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ZON COMPLETE 05/06/2022 05/06/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 04/28/2022 04/29/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey
ELEC COMPLETE 04/27/2022 04/27/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 04/18/2022 04/19/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ELEC HOLD 04/18/2022 04/18/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Provide outlet spacing per 210.52(A)1 in the Master Bedroom. 2nd REQUEST
ELEC HOLD 04/06/2022 04/06/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2017 NEC REVIEW COMMENTS: 1. Provide outlet spacing per 210.52(A)1 in the Master Bedroom.
BLD HOLD 04/06/2022 04/06/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Repeat Comment Provide product approval of the following items on specification sheet per F.S. 553.842: 1. Sliding glass door. 2. Wood anchors. 3. Truss plates. The FL 1473.9 is also for wood connectors.
BLD HOLD 03/25/2022 03/25/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide product approval of the following items on specification sheet per F.S. 553.842: 1. Sliding glass door. 2. Wood anchors. 3. Truss plates. The FL 1473.9 is also for wood connectors.
CUSVC COMPLETE 03/25/2022 03/31/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC HOLD 03/25/2022 03/25/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric plan , electric load calcs and riser diagram
ENGIN1 COMPLETE 03/25/2022 03/25/2022
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
LOCATE COMPLETE 03/25/2022 03/31/2022
Note: Released By: TONI CHURCHILL - -
MECH COMPLETE 03/25/2022 03/25/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/25/2022 03/31/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 03/25/2022 03/28/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 03/25/2022 08/26/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 02/15/2024
CONNECTION FEES ¤1,077.88 04/27/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 04/27/2022
IMPACT FEE FIRE ¤388.65 04/27/2022
IMPACT FEE PARKS ¤1,455.13 04/27/2022
IMPACT FEE SCHOOL ¤3,600.00 04/27/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 04/27/2022
WATER -IRRIGATION INSPECTION ¤25.00 04/27/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 04/27/2022
SURCHARGE FS 533.721 ¤10.10 04/27/2022
SURCHARGE - FS 468.631 ¤15.15 04/27/2022
SW ENG - FOUNDATION SURVEY ¤20.00 04/27/2022
SW ENG INSPECTION 80 ¤80.00 04/27/2022
SW ENG PRE APRON ¤30.00 04/27/2022
SW ENG - REVIEW 20 ¤20.00 04/27/2022
SW ENG RES REVIEW 200 ¤200.00 04/27/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 04/27/2022
SEWER CREDIT (¤2,465.75) 04/27/2022
SEWER INSPECTION ¤25.00 04/27/2022
SEWER CAPITAL FACILITY ¤4,939.76 04/27/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 04/27/2022
SITE PLAN 30 ¤30.00 04/27/2022
WATER- TURN ON ¤25.00 04/27/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/27/2022
INSPECTION - RESIDENTIAL ¤720.50 04/27/2022
PLAN REVIEW - RESIDENTIAL ¤204.36 04/27/2022
Fees Total Due: ¤0.00 Total Paid: ¤15,753.05