I want to search for...

Permit #2022031383

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00590-0060
CONDITIONED SPACE: 2117 sqft
GARAGE: 657 sqft
OPENED PORCH (WITH ROOF) : 38 sqft
SCREEN PORCH (SOLID ROOF) : 186 sqft
Total Square Footage: 2998 sqft
Block: 00590
Subdivision: 0 -
Job Phone: (386)437-1508
Location Address: 385 UNDERWOOD TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/21/2022
NOC: RECORDED
Applicant name: TAMMI SUE MARQUIS
Owner: JM PROPERTIES X LLC

Address

PO BOX 9

CISSNA PARK, IL 60924

Lot: 0060
Contracted Stated Job Value: ¤230,000.00
Job Description: single family residnece
Type: CN

Contractor

GULFSTREAM HOMES & CONSTRUCTION, LLC
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1092

BUNNELL, FL 32110

CRC1326418 (Exp: 08/31/2026) (386)437-1508 386-437-9769

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
MICHAEL MATTHEW SANKOSWSKI
Status Location Address State License Number Phone
ACTIVE

3 SEAMANSHIP TRAIL

PALM COAST, FL 32164

CAC1818816 (Exp: 08/31/2026) 386-316-4401
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/26/2024 FINAL APPROVED BTAYLOR
ROW - STORMWATER FINAL 01/29/2024 APPROVED - AS NOTED FSLADISH
Note: 1/29/24 BERM CORRECTION MADE. SWALE ON RIGHT PROPERTY LINE IS NOW DRAINING INTO CATCH BASIN. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC STANDARDS HAVE BEEN MET. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ 1/11/2024 - PREVIOUS INSPECTION NOTES 1/11/24= LEFT SIDE NEED TO BUILD A BERM OR A SWALE TO CARRY WATER TO THE FRONT:The subject lot drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) 1/4/24 UPON WALKING PROPERTY FOUND A COUPLE AREAS THAT NEED CORRECTION. RIGHT SIDE SWALE IN FRONT CATCH BASIN, SOD NEEDS TO BE LOWERED TO ALLOW DRAINAGE TO ENTER. OUTLINED IN WHITE PAINT. IN THE BACK RIGHT REAR PROPERTY CORNER YOU WILL NEED TO FILL IN THE LOW SPOT AND MAKE SURE DRAINAGE RUNS FROM REAR TO FRONT. OUTLINED IN WHITE PAINT. BARE EARTH AREAS IN REAR NEED TO BE SODDED. PASSING THIS AS NOTED SO THAT YOU MAY MOVE AHEAD WITH OTHER INSPECTIONS, BUT THESE AND ANY OTHER CORRECTIONS DEEMED NECCESSARY WILL NEDD TO BE COMPLETED BEFORE ROW FINAL PASSAGE.
ROW - STORMWATER FINAL 01/11/2024 Disapproved - NO FEE GBERTOLA
Note: 1/11/24= LEFT SIDE NEED TO BUILD A BERM OR A SWALE TO CARRY WATER TO THE FRONT:The subject lot drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) 1/4/24 UPON WALKING PROPERTY FOUND A COUPLE AREAS THAT NEED CORRECTION. RIGHT SIDE SWALE IN FRONT CATCH BASIN, SOD NEEDS TO BE LOWERED TO ALLOW DRAINAGE TO ENTER. OUTLINED IN WHITE PAINT. IN THE BACK RIGHT REAR PROPERTY CORNER YOU WILL NEED TO FILL IN THE LOW SPOT AND MAKE SURE DRAINAGE RUNS FROM REAR TO FRONT. OUTLINED IN WHITE PAINT. BARE EARTH AREAS IN REAR NEED TO BE SODDED. PASSING THIS AS NOTED SO THAT YOU MAY MOVE AHEAD WITH OTHER INSPECTIONS, BUT THESE AND ANY OTHER CORRECTIONS DEEMED NECCESSARY WILL NEDD TO BE COMPLETED BEFORE ROW FINAL PASSAGE.
ROW - FINAL APRON (AFTER POUR) 01/11/2024 APPROVED GBERTOLA
Note: 1/11/24= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 1/4/24 UPON WALKING PROPERTY FOUND A COUPLE AREAS THAT NEED CORRECTION. RIGHT SIDE SWALE IN FRONT CATCH BASIN, SOD NEEDS TO BE LOWERED TO ALLOW DRAINAGE TO ENTER. OUTLINED IN WHITE PAINT. IN THE BACK RIGHT REAR PROPERTY CORNER YOU WILL NEED TO FILL IN THE LOW SPOT AND MAKE SURE DRAINAGE RUNS FROM REAR TO FRONT. OUTLINED IN WHITE PAINT. BARE EARTH AREAS IN REAR NEED TO BE SODDED. PASSING THIS AS NOTED SO THAT YOU MAY MOVE AHEAD WITH OTHER INSPECTIONS, BUT THESE AND ANY OTHER CORRECTIONS DEEMED NECCESSARY WILL NEDD TO BE COMPLETED BEFORE ROW FINAL PASSAGE.
U -UTILITY RESIDENTIAL FINAL 01/05/2024 FINAL APPROVED JHARDING
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/04/2024 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 01/04/2024 APPROVED - AS NOTED FSLADISH
Note: 1/4/24 UPON WALKING PROPERTY FOUND A COUPLE AREAS THAT NEED CORRECTION. RIGHT SIDE SWALE IN FRONT CATCH BASIN, SOD NEEDS TO BE LOWERED TO ALLOW DRAINAGE TO ENTER. OUTLINED IN WHITE PAINT. IN THE BACK RIGHT REAR PROPERTY CORNER YOU WILL NEED TO FILL IN THE LOW SPOT AND MAKE SURE DRAINAGE RUNS FROM REAR TO FRONT. OUTLINED IN WHITE PAINT. BARE EARTH AREAS IN REAR NEED TO BE SODDED. PASSING THIS AS NOTED SO THAT YOU MAY MOVE AHEAD WITH OTHER INSPECTIONS, BUT THESE AND ANY OTHER CORRECTIONS DEEMED NECCESSARY WILL NEDD TO BE COMPLETED BEFORE ROW FINAL PASSAGE.
ELECTRIC - EARLY POWER 08/03/2023 APPROVED - AS NOTED BTAYLOR
Note: 8-3-23 1. Emailed FPL at 1:11.
ROW- PRE-APRON (PRE-POUR) 08/02/2023 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE FOR THE DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH TO MEET ALL CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES CULVERT PIPE ON THE RIGHT SIDE NEED TO BE EQUAL THE ELEVATION OR A LITTLE HIGHER THAN THE OUTFALL (CATCH BASIN) SO WATER WILL FLOW INTO CATCH BASIN. RIGHT NOW YOU ARE .10 LOWER THEN THE FLOWLINE ON CATCHBASIN.
ROW- PRE-APRON (PRE-POUR) 08/01/2023 Disapproved - NO FEE PFLANAGAN
Note: CULVERT PIPE ON THE RIGHT SIDE NEED TO BE EQUAL THE ELEVATION OR A LITTLE HIGHER THAN THE OUTFALL (CATCH BASIN) SO WATER WILL FLOW INTO CATCH BASIN. RIGHT NOW YOU ARE .10 LOWER THEN THE FLOWLINE ON CATCHBASIN.
U - SEWER TIE IN 02/10/2023 APPROVED BTAYLOR
GRAVITY SEWER TEST 02/10/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2060 SAME RESULTS FOR 324 UNDERWOOD TR. FIRST ROUGH APPROVED
INSULATION 01/25/2023 APPROVED LMILLER
Note: 1/19/2023 - PREVIOUS INSPECTION NOTES exterior wall insulation board has been cut out at multiple outlets and where wire was installed. please fill in with spray foam. 1-25-23 notes above resolved
LATH/BRICK/ WATER BARRIER 01/19/2023 APPROVED JWALKER
INSULATION 01/19/2023 Disapproved - NO FEE JWALKER
Note: exterior wall insulation board has been cut out at multiple outlets and where wire was installed. please fill in with spray foam.
ALL ROUGH 01/04/2023 APPROVED BTAYLOR
U-CROSS CONNECTION 01/04/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
PLUMBING 1ST ROUGH UNDERGROUND 12/28/2022 APPROVED - AS NOTED MGIBSON
Note: SAME RESULTS FOR 324 UNDERWOOD TR. FIRST ROUGH APPROVED
WALL SHEATHING 11/29/2022 APPROVED BTAYLOR
ROOF VALLEY & METAL 11/29/2022 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/03/2022 APPROVED BTAYLOR
TIE BEAM / LINTEL 08/29/2022 APPROVED BTAYLOR
Note: New inspection due to canceled inspection THIS IS A REINSPECTION THIS IS A REINSPECTION 8-19-22 1. Down rod not tied to dowel. Circled on plans. 8-23-22 1. No plans on site.
TIE BEAM / LINTEL 08/24/2022 CANCELLED BY APPLICANT WEB
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 8-19-22 1. Down rod not tied to dowel. Circled on plans. 8-23-22 1. No plans on site.
FOUND SURVEY APPROVED (OFFICE) 08/23/2022 APPROVED TBAKER
TIE BEAM / LINTEL 08/23/2022 Disapproved -FEE REQUIRED BTAYLOR
Note: THIS IS A REINSPECTION 8-19-22 1. Down rod not tied to dowel. Circled on plans. 8-23-22 1. No plans on site.
TIE BEAM / LINTEL 08/19/2022 Disapproved - NO FEE BTAYLOR
Note: 8-19-22 1. Down rod not tied to dowel. Circled on plans.
MONOLITHIC SLAB 08/08/2022 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 07/19/2022 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
BLD COMPLETE 08/23/2022 08/23/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/22/2022 08/23/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/22/2022 08/22/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 04/20/2022 04/20/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 04/18/2022 04/19/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM reupload energy calcs. Pages are blurry
BLD COMPLETE 04/18/2022 04/19/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
ZON COMPLETE 04/18/2022 04/18/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
BADMIN INFORMATION 04/06/2022 04/06/2022
Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM YOU HAVE TO SUBMITT THE BUILDING HOLD ALSO NOTJUST MEC/ZONING
BLD HOLD 03/25/2022 03/25/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide product approval of the following items on specification sheet per F.S. 553.842: 1. Sliding glass door. 2. Wood anchors. 3. Truss plates. The FL 1473.9 is also for wood connectors.
CUSVC COMPLETE 03/25/2022 03/31/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 03/25/2022 03/25/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/25/2022 03/25/2022
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
LOCATE COMPLETE 03/25/2022 04/04/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 03/25/2022 03/25/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by correct AC subcontractor
SW1 COMPLETE 03/25/2022 04/01/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 03/25/2022 03/28/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Color sheet missing the roof material and color
SWALE COMPLETE 03/25/2022 08/26/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 12/29/2022
REINSPECTION RESIDENTIAL ¤40.00 12/29/2022
CONNECTION FEES ¤1,077.88 04/21/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 04/21/2022
IMPACT FEE FIRE ¤388.65 04/21/2022
IMPACT FEE PARKS ¤1,455.13 04/21/2022
IMPACT FEE SCHOOL ¤3,600.00 04/21/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 04/21/2022
WATER -IRRIGATION INSPECTION ¤25.00 04/21/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 04/21/2022
SURCHARGE FS 533.721 ¤10.43 04/21/2022
SURCHARGE - FS 468.631 ¤15.64 04/21/2022
SW ENG - FOUNDATION SURVEY ¤20.00 04/21/2022
SW ENG INSPECTION 80 ¤80.00 04/21/2022
SW ENG PRE APRON ¤30.00 04/21/2022
SW ENG - REVIEW 20 ¤20.00 04/21/2022
SW ENG RES REVIEW 200 ¤200.00 04/21/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 04/21/2022
SEWER CREDIT (¤3,087.17) 04/21/2022
SEWER INSPECTION ¤25.00 04/21/2022
SEWER CAPITAL FACILITY ¤4,939.76 04/21/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 04/21/2022
SITE PLAN 30 ¤30.00 04/21/2022
WATER- TURN ON ¤25.00 04/21/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/21/2022
INSPECTION - RESIDENTIAL ¤745.25 04/21/2022
PLAN REVIEW - RESIDENTIAL ¤211.38 04/21/2022
Fees Total Due: ¤0.00 Total Paid: ¤15,196.72