Permit #2022031394

Permit Details

Status: COED

Parcel Id: 07-11-31-7003-00010-0070
CONDITIONED SPACE: 2668 sqft
GARAGE: 746 sqft
OPENED PORCH (WITH ROOF) : 843 sqft
OPENED PORCH (WITH ROOF) : 69 sqft
Total Square Footage: 4326 sqft
Block: 00010
Subdivision: 2190 - SECTION 3-COUNTRY CLUB COVE
Job Phone: 912-258-2201
Location Address: 13 CHESNEY CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/22/2022
NOC: RECORDED
Applicant name: JAMES FUCETOLA III
Owner: PALM COAST COMMUNITIES LLC

Address

PO BOX 22547

ST SIMONS ISLAND, GA 31522

Lot: 0070
Contracted Stated Job Value: ¤260,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PALM COAST COMMUNITIES LLC
Status Location Address State License Number Phone
INACTIVE

PO BOX 22547

PALM COAST, FL 32164

CBC1262878 (Exp: 08/31/2026) 321-501-4617

Sub Contractors

OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 01/04/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
BLD - BUILDING FINAL 01/03/2023 FINAL APPROVED AGAETANO
Note: 12/28/2022 - PREVIOUS INSPECTION NOTES 12-28-2022 Energy calculations do not match. Please submit a revision to the building department and have approved calcs on site for inspection.
BLD - BUILDING FINAL 12/28/2022 Disapproved - NO FEE AGAETANO
Note: 12-28-2022 Energy calculations do not match. Please submit a revision to the building department and have approved calcs on site for inspection.
U -UTILITY RESIDENTIAL FINAL 12/28/2022 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 12/27/2022 APPROVED PFLANAGAN
ROW - FINAL APRON (AFTER POUR) 12/27/2022 APPROVED PFLANAGAN
FINAL SURVEY (OFFICE USE ONLY) 12/27/2022 APPROVED GBERTOLA
U-CROSS CONNECTION 12/22/2022 APPROVED - AS NOTED JHARDING
Note: No cross connections.
ROW- PRE-APRON (PRE-POUR) 11/28/2022 APPROVED EMADISON
Note: ** 11/28/22 MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** READY TO POUR IN THE EVENT OF RAIN RECHECK ELEVATIONS AND COMPACTION
ELECTRIC - EARLY POWER 11/15/2022 APPROVED AGAETANO
Note: 11-15-2022 FPL Notified at 3:01 pm
U - SEWER TIE IN 11/01/2022 APPROVED MGIBSON
INSULATION 09/26/2022 APPROVED AGAETANO
ALL ROUGH 09/16/2022 APPROVED AGAETANO
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES
ALL ROUGH 09/15/2022 CANCELLED BY APPLICANT AGAETANO
LATH/BRICK/ WATER BARRIER 09/06/2022 APPROVED - AS NOTED AGAETANO
Note: 09-06-2022 Contractor completing the last few pieces of window stops.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/17/2022 APPROVED DCUSHING
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION 1. missing down rods per interior bearing wall (see detail), 2. missing nails in HTUI26 highlighted on engineering plans 3. missing nail in piggy back gang nail plates (check all inspection stopped (need details for truss agtachements with screws or other attachments 8-11-22 1. Strap missing on double truss. Only has one holding it down. 2. Strap not nailed off on truss I12. 3. Engineering not complete. 4. Spruce used for engineering. Inspection stopped
ROOF VALLEY & METAL 08/12/2022 APPROVED LMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/11/2022 Disapproved - NO FEE BTAYLOR
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. missing down rods per interior bearing wall (see detail), 2. missing nails in HTUI26 highlighted on engineering plans 3. missing nail in piggy back gang nail plates (check all inspection stopped (need details for truss agtachements with screws or other attachments 8-11-22 1. Strap missing on double truss. Only has one holding it down. 2. Strap not nailed off on truss I12. 3. Engineering not complete. 4. Spruce used for engineering. Inspection stopped
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/09/2022 CANCELLED BY APPLICANT LMILLER
Note: THIS IS A REINSPECTION 1. missing down rods per interior bearing wall (see detail), 2. missing nails in HTUI26 highlighted on engineering plans 3. missing nail in piggy back gang nail plates (check all inspection stopped (need details for truss agtachements with screws or other attachments
WINDOW NAILING 08/09/2022 APPROVED LMILLER
Note: a note on the roof sheathing, braces, ties, down cells inspection asked for slider track inspection only so that inspection was cancelled and I added an inspection for window nailing for slider track screws. inspection result is approved
WALL SHEATHING 08/05/2022 APPROVED LMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/05/2022 Disapproved -FEE REQUIRED LMILLER
Note: 1. missing down rods per interior bearing wall (see detail), 2. missing nails in HTUI26 highlighted on engineering plans 3. missing nail in piggy back gang nail plates (check all (need details for truss agtachements with screws or other attachments) inspection stopped
ROOF SHEATHING 08/05/2022 APPROVED LMILLER
ELEV CERT-FOUNDATION APPROVAL 08/04/2022 APPROVED JMYERS
TIE BEAM / LINTEL 07/11/2022 APPROVED AGAETANO
MONOLITHIC SLAB 06/23/2022 APPROVED DCUSHING
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 1. UFER ground not visible. 2. The front left corner of the CMU and footing appears to be sinking. Possible structural issues at thia area. Further observation is needed to proceed with inspection. 06-21-2022 - 1. The front left corner of the CMU and footing appears to be sinking. Provide engineering report to clear any potential concerns of the sinking CMU and footing. 6.23.22 - Letter from EOR on file, repair made
ELECTRIC TEMP POLE 06/22/2022 APPROVED AGAETANO
MONOLITHIC SLAB 06/21/2022 Disapproved -FEE REQUIRED AGAETANO
Note: THIS IS A REINSPECTION 1. UFER ground not visible. 2. The front left corner of the CMU and footing appears to be sinking. Possible structural issues at thia area. Further observation is needed to proceed with inspection. 06-21-2022 - 1. The front left corner of the CMU and footing appears to be sinking. Provide engineering report to clear any potential concerns of the sinking CMU and footing.
MONOLITHIC SLAB 06/17/2022 Disapproved - NO FEE AGAETANO
Note: 1. UFER ground not visible. 2. The front left corner of the CMU and footing appears to be sinking. Possible structural issues at thia area. Further observation is needed to proceed with inspection.
PLUMBING 1ST ROUGH UNDERGROUND 06/15/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 06/15/2022 APPROVED MGIBSON
FOUND SURVEY APPROVED (OFFICE) 06/08/2022 APPROVED TBAKER
STEM WALL FOUNDATION 05/27/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION 05-24-2022 1. Please revise garage foundation area and entry area where CMU has been installed. 2. Please provide a full set of approved drawings on site for inspection.
STEM WALL FOUNDATION 05/24/2022 Disapproved - NO FEE AGAETANO
Note: THIS IS A REINSPECTION 05-24-2022 1. Please revise and submit to the Building Department the garage foundation area and entry area where CMU has been installed. 2. Please provide a full set of approved drawings on site for inspection.
STEM WALL FOUNDATION 05/23/2022 CANCELLED BY APPLICANT AGAETANO
STEM WALL FOUNDATION 05/20/2022 APPROVED - AS NOTED AGAETANO
Note: Back of garage not complete. Contractor will call in another stem wall inspection for that area. Noted on drawings.
WATER METER INSTALLATION REQUEST 05/04/2022 APPROVED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 5/3/2022 8:34:53 AM THIS IS A REINSPECTION ADDED ON 4/27/2022 3:11:30 PM dirt pile in the way NOT CLEAR DIRT PILE IN THE WAY Email rsydnor@palmcoastgov.com with questions
FOOTER 05/02/2022 APPROVED AGAETANO
WATER METER INSTALLATION REQUEST 04/29/2022 Disapproved -FEE REQUIRED CSTONE
Note: THIS IS A REINSPECTION ADDED ON 4/27/2022 3:11:30 PM dirt pile in the way NOT CLEAR DIRT PILE IN THE WAY Email rsydnor@palmcoastgov.com with questions
WATER METER INSTALLATION REQUEST 04/26/2022 Disapproved - NO FEE CSTONE
Note: dirt pile in the way

Review History

Department Status Date In Date Out
PLFM COMPLETE 01/11/2023 01/11/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM HOLD 01/09/2023 01/09/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM This structure is on a stem-wall foundation, as such A7 needs to be 1B instead of 1A. C2a should be 9.7 as the elevation on the survey is 9.65 and should be rounded up when only using one decimal place.
MECH COMPLETE 12/28/2022 12/29/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/09/2022 09/09/2022
Note: Released By: HALEIGH HAND - -
PLFM COMPLETE 08/04/2022 08/04/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The foundation elevation certificate has been approved. Please provide Final prior to receiving CO.
PLFM HOLD 08/03/2022 08/03/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM C1 was changed from Building Under Construction to Construction Drawings. It needs to be Building.
ENGIN1 COMPLETE 08/03/2022 08/03/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/03/2022 08/03/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLFM HOLD 07/29/2022 08/01/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Foundation EC is dated same day as Construction EC, this is not possible please revise. Foundation survey is missing flood zone lines, elevation for garage, and location of A/C pad noted in C2e.
BLD COMPLETE 06/23/2022 06/24/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/08/2022 06/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/08/2022 06/08/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 05/26/2022 05/26/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
PLFM COMPLETE 04/19/2022 04/20/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved. Please provide foundation and final prior to receiving CO.
ELEC COMPLETE 04/14/2022 04/18/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLFM HOLD 04/14/2022 04/14/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The following comments are in regards to the Elevation Certificate: B1 still has incorrect information. B9 is still missing a measurement mark on the Base Flood Elevation.
ELEC HOLD 04/07/2022 04/07/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Outlets in bathrrom need to be GFCI protected. NEC 2017 210.8
BLD COMPLETE 04/07/2022 04/07/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
ZON COMPLETE 04/07/2022 04/07/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
PLFM HOLD 04/07/2022 04/08/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The following comments are in regards to the Elevation Certificate: A3 needs more information. A4 needs a use stated. B1 has incorrect information. B9 needs to be stated as 7.0'. Section D there needs to be a signature and date on top of the seal, and the machinery referenced in C2e needs to by noted in the Comments.
ENGIN1 COMPLETE 04/07/2022 04/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 04/07/2022 04/11/2022
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
PLFM HOLD 03/28/2022 03/28/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 3/25/22, the structure falls within the Special Flood Hazard Area. Elevation certificates are required at construction, foundation, and final.
BLD HOLD 03/25/2022 03/28/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Product approval for the roofing shingles noted on the Roofing Worksheet and Product Approval do not match. F.S. 553.842
CUSVC COMPLETE 03/25/2022 03/31/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC HOLD 03/25/2022 03/25/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Reccesed cans in garage need to be fire rated, submit manufacture specs on cans. FRC 2020 302.5 2. Outlets in laundry room, kitchen,garage,bathrooms need to be GFCI protected. NEC 2017 210.8 3. Need correct outlet spacing in master bedroom. NEC 2017 210.52 4. Outlets in soffit need to be GFCI protected. NEC 2017 210.8
ENGIN1 COMPLETE 03/25/2022 03/25/2022
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
LOCATE COMPLETE 03/25/2022 04/04/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/25/2022 03/25/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/25/2022 04/01/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 03/25/2022 03/28/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 5 trees Shrubs: *Six Shrubs shall be planted on each side of the home facing the street. Site plan: please provide the width of walkway to entry of home
SWALE COMPLETE 03/25/2022 08/26/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤467.09 09/22/2022
WATER- TURN ON ¤25.00 09/22/2022
PLAN REVIEW - REVISION ¤32.50 09/22/2022
REINSPECTION RESIDENTIAL ¤40.00 09/22/2022
REINSPECTION RESIDENTIAL ¤40.00 09/22/2022
PLAN REVIEW - REVISION ¤32.50 09/22/2022
WATER -IRRIGATION INSPECTION ¤25.00 09/22/2022
REINSPECTION FEE ¤40.00 09/22/2022
PLAN REVIEW - REVISION (¤32.50) 09/16/2022
REINSPECTION FEE ¤40.00 09/16/2022
REINSPECTION FEE (¤40.00) 09/16/2022
REINSPECTION RESIDENTIAL (¤40.00) 09/16/2022
WATER -IRRIGATION INSPECTION ¤25.00 09/16/2022
WATER -IRRIGATION INSPECTION (¤25.00) 09/16/2022
REINSPECTION RESIDENTIAL ¤40.00 09/16/2022
REINSPECTION RESIDENTIAL ¤40.00 09/16/2022
REINSPECTION RESIDENTIAL (¤40.00) 09/16/2022
PLAN REVIEW - REVISION ¤32.50 09/16/2022
PLAN REVIEW - REVISION ¤32.50 09/16/2022
PLAN REVIEW - REVISION (¤32.50) 09/16/2022
WATER- TURN ON ¤25.00 09/16/2022
WATER- TURN ON (¤25.00) 09/16/2022
WATER-METER ¤467.09 09/16/2022
WATER-METER (¤467.09) 09/16/2022
WATER- TURN ON ¤25.00 04/22/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/22/2022
INSPECTION - RESIDENTIAL ¤1,001.00 04/22/2022
PLAN REVIEW - RESIDENTIAL ¤283.92 04/22/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 04/22/2022
CONNECTION FEES ¤1,077.88 04/22/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 04/22/2022
IMPACT FEE FIRE ¤388.65 04/22/2022
IMPACT FEE PARKS ¤1,455.13 04/22/2022
IMPACT FEE SCHOOL ¤3,600.00 04/22/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 04/22/2022
WATER -IRRIGATION INSPECTION ¤25.00 04/22/2022
SURCHARGE FS 533.721 ¤13.79 04/22/2022
SURCHARGE - FS 468.631 ¤20.69 04/22/2022
SW ENG - FOUNDATION SURVEY ¤20.00 04/22/2022
SW ENG INSPECTION 80 ¤80.00 04/22/2022
SW ENG PRE APRON ¤30.00 04/22/2022
SW ENG - REVIEW 20 ¤20.00 04/22/2022
SW ENG RES REVIEW 200 ¤200.00 04/22/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 04/22/2022
SEWER INSPECTION ¤25.00 04/22/2022
SEWER CAPITAL FACILITY ¤4,939.76 04/22/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 04/22/2022
SITE PLAN 30 ¤30.00 04/22/2022
Fees Total Due: ¤0.00 Total Paid: ¤19,250.18