Permit #2022031477

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00100-0080
CONDITIONED SPACE: 2376 sqft
GARAGE: 776 sqft
OPENED PORCH (WITH ROOF) : 76 sqft
PATIO/DECK (NO ROOF) : 474 sqft
SCREEN PORCH (SOLID ROOF) : 162 sqft
Total Square Footage: 3864 sqft
Block: 00100
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 407-808-8155
Location Address: 103 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/08/2022
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0080
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
CHRIS L JENKINS
Status Location Address State License Number Phone
INACTIVE

3975 FORRESTAL AVE SUITE 100

, 0

L145104 (Exp: 03/24/2027) 407-856-7770

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/28/2023 FINAL APPROVED TSTAUFFACHER
Note: 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23: 1). Missing locking breakers for Wall Oven, Microwave and Cooktop as required by NEC422.31. 2). Kitchen outlets on right side of kitchen in backsplash need to be properly secured. (excessively loose).
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/27/2023 APPROVED - AS NOTED PFLANAGAN
Note: THIS IS ALREADY PASSED BY ROBERT GROSS . ---------------------------------------------------------------------------------------- COULDN'T GET BAHIA SOD UNDER WATER THEY TOLD ME THEY WAS GOING TO WATER IT --------------------------------------------------------------------------------- 7/21/2023 - PREVIOUS INSPECTION NOTES NEED TO RE-ESTABLISHED SOD BUFFER AGAINST THE CURB AND GUTTER AND AT THE END OF SIDEWALK. ALL SID MUST BE BAHIA. NEED TO HAVE 5' OF SOD FROM BACK OF CURB TO BE UP TO CITY'S CODE ------------------------------------------------------------------------------------------ rjg. NOTE TO INSPECTOR: Make sure that at least one row of sod is placed behind the Miami curb and the sidewalk on the right vacant to prevent sediment washout into the curb.
ROW - STORMWATER FINAL 07/26/2023 APPROVED - AS NOTED PFLANAGAN
Note: COULDN'T GET BAHIA SOD UNDER WATER THEY TOLD ME THEY WAS GOING TO WATER IT --------------------------------------------------------------------------------- 7/21/2023 - PREVIOUS INSPECTION NOTES NEED TO RE-ESTABLISHED SOD BUFFER AGAINST THE CURB AND GUTTER AND AT THE END OF SIDEWALK. ALL SID MUST BE BAHIA. NEED TO HAVE 5' OF SOD FROM BACK OF CURB TO BE UP TO CITY'S CODE ------------------------------------------------------------------------------------------ rjg. NOTE TO INSPECTOR: Make sure that at least one row of sod is placed behind the Miami curb and the sidewalk on the right vacant to prevent sediment washout into the curb.
BLD - BUILDING FINAL 07/26/2023 Disapproved - NO FEE RSIMS
Note: 7/26/23: 1). Missing locking breakers for Wall Oven, Microwave and Cooktop as required by NEC422.31. 2). Kitchen outlets on right side of kitchen in backsplash need to be properly secured. (excessively loose).
GAS FIREPLACE 07/26/2023 APPROVED RSIMS
Note: 7/26/23: Gas fireplace is hooked up & supply lines are visually installed properly. There is no gas hooked up at the time of inspection so a final pressure test/leak test could not be performed. The gas company that installs the fuel tank & pressurizes the system will need to pull a seperate permit before work commences. Note: Rough gas lines were pressurized & inspected during the All Rough Inspection.
GAS ROUGH 07/26/2023 APPROVED - AS NOTED RSIMS
Note: 7/26/23: Gas rough was inspected during All Rough inspection.
GAS FINAL 07/26/2023 APPROVED RSIMS
Note: 7/26/23: Gas fireplace is hooked up & supply lines are visually installed properly. There is no gas hooked up at the time of inspection so a final pressure test/leak test could not be performed. The gas company that installs the fuel tank & pressurizes the system will need to pull a seperate permit before work commences. Note: Rough gas lines were pressurized & inspected during the All Rough Inspection.
ROW - STORMWATER FINAL 07/21/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO RE-ESTABLISHED SOD BUFFER AGAINST THE CURB AND GUTTER AND AT THE END OF SIDEWALK. ALL SID MUST BE BAHIA. NEED TO HAVE 5' OF SOD FROM BACK OF CURB TO BE UP TO CITY'S CODE ------------------------------------------------------------------------------------------ rjg. NOTE TO INSPECTOR: Make sure that at least one row of sod is placed behind the Miami curb and the sidewalk on the right vacant to prevent sediment washout into the curb.
U -UTILITY RESIDENTIAL FINAL 07/18/2023 APPROVED - AS NOTED LFITZGERALD
Note: contact utiity dept. to request raising water meter pit
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/17/2023 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 07/17/2023 APPROVED RGROSS
Note: See note on Final Stormwater.
ROW - FINAL APRON (AFTER POUR) 07/17/2023 APPROVED RGROSS
ELECTRIC - EARLY POWER 07/11/2023 APPROVED - AS NOTED BTAYLOR
Note: 7-11-23 1. Emailed FPL at 9:35.
U-CROSS CONNECTION 07/11/2023 APPROVED - AS NOTED LFITZGERALD
Note: has reclaim irrigation-no cross connection
ROW- PRE-APRON (PRE-POUR) 06/22/2023 APPROVED GBERTOLA
Note: 6/22/23= READY FOR PAVERS ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/15/2023 - PREVIOUS INSPECTION NOTES NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED.
ROW- PAVER RESTRAINTS 06/15/2023 APPROVED GBERTOLA
Note: READY FOR CONCRETE
ROW- PRE-APRON (PRE-POUR) 06/15/2023 PARTIALLY APPROVED GBERTOLA
Note: NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED.
TIE BEAM / LINTEL 05/02/2023 APPROVED TSTAUFFACHER
INSULATION 03/09/2023 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 03/06/2023 APPROVED BTAYLOR
ALL ROUGH 02/23/2023 APPROVED BTAYLOR
GRAVITY SEWER TEST 02/09/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 02/09/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
WALL SHEATHING 11/14/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/04/2022 APPROVED KSANDOE
Note: 10/27/2022 - PREVIOUS INSPECTION NOTES 10/21/2022 - PREVIOUS INSPECTION NOTES 9/27/2022 - PREVIOUS INSPECTION NOTES Roof Sheathing approved on 9-27-22 10-21-22 1. Wrong tie downs installed. 2.Straps not nailed off. 3. Piggy backs not per detail. 4. Engineering not complete 10-27-22 1. From the list above the first thing I checked was still defficient Please complete the prior list before recalling Piggy Back trusses not per detail (check length of scabs above and below connections Inspection Stopped
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/27/2022 Disapproved -FEE REQUIRED LMILLER
Note: 10/21/2022 - PREVIOUS INSPECTION NOTES 9/27/2022 - PREVIOUS INSPECTION NOTES Roof Sheathing approved on 9-27-22 10-21-22 1. Wrong tie downs installed. 2.Straps not nailed off. 3. Piggy backs not per detail. 4. Engineering not complete 10-27-22 1. From the list above the first thing I checked was still defficient Please complete the prior list before recalling Piggy Back trusses not per detail (check length of scabs above and below connections Inspection Stopped
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/21/2022 Disapproved - NO FEE BTAYLOR
Note: 9/27/2022 - PREVIOUS INSPECTION NOTES Roof Sheathing approved on 9-27-22 10-21-22 1. Wrong tie downs installed. 2.Straps not nailed off. 3. Piggy backs not per detail. 4. Engineering not complete
ELECTRIC-TUG 10/13/2022 APPROVED JMUNSON
ROOF VALLEY & METAL 10/11/2022 APPROVED DCUSHING
Note: Roof Sheathing was approved on 9-27-22
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/27/2022 PARTIALLY APPROVED LMILLER
Note: Roof Sheathing approved on 9-27-22
FOUND SURVEY APPROVED (OFFICE) 09/19/2022 APPROVED TBAKER
TIE BEAM / LINTEL 08/09/2022 APPROVED KSANDOE
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION missing down rods d/e dowels not epoxied properly, or no epoxy at all, holes must be blown out and a full bed of epoxy installed Stopped inspection 8-3-22 from the notes I began the inspection, the very first location i inspected on the street side of the garage was no more than 3/4 of an inch deep had no epoxy and readily came out with the slightest tug on the rod. Inspection stopped. 8-4-22 1. missing dowels from footing (need to drill and epoxy). 2. missing inspection cut outs (may need further corrections to steel once exposed in those areas. (All highlighted on plans). R606.3.5.2, 8-8-22 1. missing inspection cut outs (may need further corrections to steel once exposed in those areas. (All highlighted on plans). R606.3.5.2, 2. Walked whole house circled areas that still need fixed and need dowels moved
TIE BEAM / LINTEL 08/08/2022 Disapproved -FEE REQUIRED BTAYLOR
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION missing down rods d/e dowels not epoxied properly, or no epoxy at all, holes must be blown out and a full bed of epoxy installed Stopped inspection 8-3-22 from the notes I began the inspection, the very first location i inspected on the street side of the garage was no more than 3/4 of an inch deep had no epoxy and readily came out with the slightest tug on the rod. Inspection stopped. 8-4-22 1. missing dowels from footing (need to drill and epoxy). 2. missing inspection cut outs (may need further corrections to steel once exposed in those areas. (All highlighted on plans). R606.3.5.2, 8-8-22 1. missing inspection cut outs (may need further corrections to steel once exposed in those areas. (All highlighted on plans). R606.3.5.2, 2. Walked whole house circled areas that still need fixed and need dowels moved
TIE BEAM / LINTEL 08/04/2022 Disapproved - NO FEE LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION missing down rods d/e dowels not epoxied properly, or no epoxy at all, holes must be blown out and a full bed of epoxy installed Stopped inspection 8-3-22 from the notes I began the inspection, the very first location i inspected on the street side of the garage was no more than 3/4 of an inch deep had no epoxy and readily came out with the slightest tug on the rod. Inspection stopped. 8-4-22 1. missing dowels from footing (need to drill and epoxy). 2. missing inspection cut outs (may need further corrections to steel once exposed in those areas. (All highlighted on plans). R606.3.5.2,
TIE BEAM / LINTEL 08/03/2022 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION missing down rods d/e dowels not epoxied properly, or no epoxy at all, holes must be blown out and a full bed of epoxy installed Stopped inspection 8-3-22 from the notes I began the inspection, the very first location i inspected on the street side of the garage was no more than 3/4 of an inch deep had no epoxy and readily came out with the slightest tug on the rod. Inspection stopped.
TIE BEAM / LINTEL 07/27/2022 Disapproved -FEE REQUIRED DCUSHING
Note: THIS IS A REINSPECTION missing down rods d/e dowels not epoxied properly, or no epoxy at all, holes must be blown out and a full bed of epoxy installed Stopped inspection
TIE BEAM / LINTEL 07/25/2022 CANCELLED BY APPLICANT DCUSHING
MONOLITHIC SLAB 06/14/2022 APPROVED DCUSHING
PLUMBING 1ST ROUGH UNDERGROUND 06/09/2022 APPROVED MGIBSON
FOOTER 05/09/2022 APPROVED LMILLER
WATER METER INSTALLATION REQUEST 04/22/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 09/20/2022 09/21/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 09/19/2022 09/19/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/19/2022 09/19/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 07/05/2022 07/05/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
URB COMPLETE 03/30/2022 03/30/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 03/28/2022 03/29/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 03/28/2022 04/06/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 03/28/2022 03/29/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/28/2022 03/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 03/28/2022 03/30/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/28/2022 03/29/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/28/2022 04/05/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 03/28/2022 03/30/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 07/25/2023
SW ENG REINSPECTION 20 ¤20.00 07/25/2023
CONTRACTOR CHANGE ¤20.00 07/20/2023
CONTRACTOR CHANGE ¤40.00 07/20/2023
PLAN REVIEW - REVISION ¤32.50 07/20/2023
PLAN REVIEW - REVISION ¤32.50 07/20/2023
REINSPECTION RESIDENTIAL ¤40.00 07/20/2023
REINSPECTION RESIDENTIAL ¤40.00 07/20/2023
REINSPECTION RESIDENTIAL ¤40.00 07/20/2023
REINSPECTION RESIDENTIAL ¤40.00 07/20/2023
CONNECTION FEES ¤25.00 04/08/2022
WATER-METER ¤467.09 04/08/2022
WATER-METER ¤388.04 04/08/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/08/2022
INSPECTION - RESIDENTIAL ¤893.75 04/08/2022
PLAN REVIEW - RESIDENTIAL ¤253.50 04/08/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 04/08/2022
IMPACT FEE FIRE ¤388.65 04/08/2022
IMPACT FEE PARKS ¤1,455.13 04/08/2022
IMPACT FEE SCHOOL ¤3,600.00 04/08/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 04/08/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 04/08/2022
SURCHARGE FS 533.721 ¤12.38 04/08/2022
SURCHARGE - FS 468.631 ¤18.57 04/08/2022
SW ENG - FOUNDATION SURVEY ¤20.00 04/08/2022
SW ENG INSPECTION 80 ¤80.00 04/08/2022
SW ENG PRE APRON ¤30.00 04/08/2022
SW ENG - REVIEW 20 ¤20.00 04/08/2022
SW ENG RES REVIEW 200 ¤200.00 04/08/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 04/08/2022
SEWER INSPECTION ¤25.00 04/08/2022
SITE PLAN 30 ¤30.00 04/08/2022
Fees Total Due: ¤0.00 Total Paid: ¤11,334.08